Forwards Safety Insp Rept 50-333/87-03 on 870126-30.No Violation Noted
ML20207T358
Person / Time
Site: FitzPatrick Constellation icon.png
Issue date: 03/19/1987
From: Ebneter S
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Radford Converse
POWER AUTHORITY OF THE STATE OF NEW YORK (NEW YORK
Shared Package
ML20207T359 List:
References
NUDOCS 8703230477
Download: ML20207T358 (2)


See also: IR 05000333/1987003

Text

-

,

p:;

-

.

. .

MAR 191987

.

Docket No. 50-333

Power Authority of :the State of New York

James A. FitzPatrick Nuclear Power Plant

ATTN: Mr. Radford J. Converse

Resident Manager

P. O. Box 41

Lycoming, New York 13093

Gentlemen:

Subject: Inspection Report No. 50-333/87-03

-This letter refers to the routine safety inspection conducted by

Mr. H. J. Kaplan of this office on January 26-30,.1987 at 'The James A.

FitzPatrick Nuclear Power Plant. Mr. Kaplan discussed the findings of the

report with yourself and other members of your staff at the conclusion of the

inspection.

Areas examined during this inspection are described in the NRC Region I

Inspection Report which is enclosed with this letter. Within these areas, the

inspection consisted of selective examinations of procedures and representative

records, interviews with personnel, measurements made by the inspector, and

observations by the inspector.

Within the scope of this inspection, no violations were observed.

No reply to this letter is required. Your cooperation with us in this matter

is appreciated.

Sincerely,

Ori @ n' 3 2' W 3

Jaeg;;F.Du.>r

Stewart D. Ebneter, Director

Division of Reactor Safety

Enclosure: NRC Region I Ins ction Report Number 50-333/87-03

&I

8703230477 870319

Yd $-

PDR ADOCK 05000333

O PDR

OFFICIAL RECORD COPY IR FITZ 87-03 - 0001.0.0

03/05/87

_

. _ . _ . . _ _ _ . _ _ , _ _ . -

.

.

= .

. .

Power-Authority of the State 2

of New York

,

.

cc w/ enc 1:

L.~W. Sinc 1 air,' President -

.J. P. Bayne, First Executive Vice President and Chief Operations Officer

-A. Klausmann, Vice President.- Quality Assurance and Reliability

R. L. Patch, Quality Assurance Superintendent

George M. Wilverding, Chairman, Safety Review Committee

Gerald C. Goldstein, Assistant General Counsel

NRC Licensing Project Manager

Dept. of Public Service, State of New York

Public-Document Room (PDR)

Local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

NRC Resident Inspector

State of New York

bec w/ enc 1:

Region I Docket Room (with concurrences)

Management Assistant, DRMA (w/o encl)

Section Chief, DRP

Robert J. Bores, DRSS

_

d(br

t

> 0w

RI:DRS RI:DRS SRI:DRS RI:DRS

Gray /rw Kaplan Strosnider Durr

3/f /87- 3/f/87 3/ 6 /87 3/a /87

0FFICIAL RECORD COPY IR FITZ 87-03 - 0001.1.0

03/03/87