ML20207S969

From kanterella
Jump to navigation Jump to search
Application for Amends to Licenses NPF-9 & NPF-17, Transferring Table of Containment Penetration Conductor Overcurrent Protective Devices from Tech Specs to Separate Document & Revising Fuse Testing Requirements.Fee Paid
ML20207S969
Person / Time
Site: McGuire, Mcguire  Duke Energy icon.png
Issue date: 03/16/1987
From: Tucker H
DUKE POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20207S970 List:
References
NUDOCS 8703230005
Download: ML20207S969 (4)


Text

r DUKE POWER GOMPANY P.O. box 33189 CHARLOTTE, N.C. 98949 IIAL B. TUCKER retzenons vmm resement (704) 07:F4538 mmaan panocceson March 16, 1987 U.S. Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555

Subject:

McGuire Nuclear Station Docket Nos. 50-369, 50-370 Technical Specification Changes for Containment Penetration Conductor Overcurrent Protective Devices Gentlemen:

Attached are proposed license amendments for McGuire Nuclear Station, Facility Operating Licenses NPF-9 (Unit 1) and NPF-17 (Unit 2). The proposed changes would transfer the table of Containment Penetration Conductor Overcurrent Protective "

Devices from the Technical Specifications (Table 3.8-1) to a separate document, the System Description, a QA Condition 1 document with appropriate controls where the listing may be more efficiently kept up to date. Removing such tabular data from the Technical Specifications has been a part of the Technical Specification Improvement project sponsored by the AIF. Additionally, maintaining the tables as o separate, referenced document will reduce administrative workload at Duke and NRC. At present, a license amendment would be required in order to change the tables. Maintaining the tables as a separate document outside of the Technical Specifications would reduce workload at Duke and eliminate any review at NRC when a change to the table is needed. Reviews by Duke during the modification process in accordance with 10CFR 50.59 will assure completeness and accuracy of the table.

The proposed also includes a change to the fuse testing requirements of the cpecification to allow more efficient fuse checking and prevent the disposal of good fuses.

Attachment 1 contains the proposed Technical Specification Changes; Attachment 2 contains Justification and Safety Analysis in support of the proposed change; Attachment 3 provides an analysis confirming to the standards contained in 10CFR 50.92, as required by 10CFR 50.91 which concludes that the proposed caendments do not involve a Significant Hazards Consideration. Attachment 4 contains Revision 1 of the previously mentioned System Descriptions.

Timely action by the NRC on this request is desired. This (tables in the Technical Specifications) has been identified as a short term problem with Technical Specifications and one that can be rectified without rulemaking or substantial technical justification. , ,OO B70323000S 070316 gp

$DR ADOM Omg9 $ pggyggIg

Document Control Desk'-

March 16,' 1987 Page 2 This request involves one . application for amendment to McGuire's Technical Specifications. Accordingly, pursuant to 10CFR 170.21, a check for $150.00 is enclosed.

Please feel free to contact us if you require any additional information.

Very truly yours,

/

Hal B. Tucker JBD/177/jga Attachments xc Mr. W.T. Orders NRC Resident Inspector McGuire Nuclear Station Mr. Darl Hood Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D.C. 20555 Dr. J. Nelson Grace, Regional Administrator U.S. Nuclear Regulatory Commission Region II 101 Marietta St. NW, Suite 2900 Atlanta, Georgia 30323 Mr. Dayne Brown, Chief Radiation Protection Branch Division of Facility Services Department of Human Resources P.O. Box 12200 Raleigh, NC 27605

r-Document Control Desk March 16, 1987 Page 3 HAL B. TUCKER, being duly sworn, states that he is Vice President of Duke Power Company; that he is authorized on the part of said Company to sign and file with the Nuclear Regulatory Commission this revision to the McGuire Nuclear Station Liconse Nos. NPF-9 and NPF-17 and that all statements and matters set forth therein are true and correct to the best of his knowledge.

G h W . "' b Hal B. Tucker, Vice President Subscribed and sworn to before me this 16th day of March, 1987.

.10K_)/ .M 0 n or'a'ry Public# / '/ .

My Commission Expires:

497%

/, Mx9 M

,h. .'.. 4, S

gvail n 0 .T A li y \1n3 f...b

.... ..b'.b.

7-=-

ATTACHMENT 1 PROPOSED TECHNICAL SPECIFICATION CHANGES

.