ML20207S358

From kanterella
Jump to navigation Jump to search
Discusses Telcon Re Arrangements for Evaluation of Requalification Program Scheduled for Wk of 870518.Ref Matl Listed in Encl Required by 870327 for Examiner to Adequately Prepare for Visit
ML20207S358
Person / Time
Site: Beaver Valley
Issue date: 03/10/1987
From: Lester Tripp
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Sieber J
DUQUESNE LIGHT CO.
References
NUDOCS 8703190308
Download: ML20207S358 (3)


Text

~

MAR 101907 Docket No. 50-334 Duquesne Light Company ATTN:

Mr. J. D. Sieber Vice President - Nuclear Group P.O. Box 4 Shippingport, Pennsylvania 15077 Gentlemen:

~

SUBJECT:

REQUALIFICATION PROGRAM EVALUATION In a telephone conversation between Mr. T. Burns, Training Coordinator, and Mr. N. Dudley Lead Examiner, arrangements were made for an evaluation of the requalification program at the Beaver Valley Unit 1 Facility. The evaluation visit is scheduled for the week of May 18, 1987.

For this visit, the NRC will administer NRC prepared written, oral, and simu-lator examinations. When the NRC examiner arrives at the site, he will meet with the appropriate facility personnel to review the schedule for these ex-aminations.

For the examiner to adequately prepare for this visit, it will be necessary for.the facility to furnish the approved referenced material listed in Enclosure 1 " Reference Material Requirements for Requalification Program Evaluations," by March 27, 1987. Mr. T. Burns has been advised of our refer-ence material requirements and where they are to be sent.

This request for information was approved by the Office of Management and Budget under Clearance Number 3150-0101, which expires May 31, 1989.

Comments on burden and duplication may be directed to the Office of Management and Budget, Reports Management Roon 3908, New Executive Office Building, Washington, D.C. 20503.

Thank you for your consideration in this matter.

If you have any questions on the evaluation process, please contact Mr. R. Keller, Chief, Reactor Projects Section 1C, at 215-337-5211.

Sincerely, Originni swie p.r:

Lowell E. Tripp, Chief Reactor Project Section No. 3A Division of Reactor Projects

Enclosure:

As Stated 0FFICIAL RECORD COPY OL REQUAL BVI - 0001.0.0 Zg//JL r;703190308 870310 PDR ADOCK 05000334 y

PDR

\\g

o 2

MAR 10 W

-cc: w/ encl:

'd. _ S. Lacey, Plant.. Manager T. Burns, Training Manager

.NRC Resident Inspector

.bcc w/ encl:

DRP Section Chief Examiner OL File 4

RI:DRP-I:DRP R

P Dudley/ejr hKeller Trjp[p3[f8i 3 3-87 3 3-51 v

.rn 0FFICIAL RECORD COPY OL REQUAL BVI - 0002.0.0 03/02/87

ENCLOSURE 1 REFERENCE MATERIAL REQUIREMENTS FOR REQUALIFICATION PROGRAM EVALUATION 1.

An index of. administrative, operating, abnormal and emergency procedures.

2.

All administrative procedures (as applicable to reactor operation or safety) 3.

All integrated plant procedures (normal or general operating procedures) 4.

Emergency procedures (emergency instructions, abnormal, or special procedures) 5.

Standing orders (important orders which are safety related to and may supersede the regular procedures) 6.

Fuel-handling and core-loading procedures (initial core-loading procedure, when appropriate) 7.

Annunciator procedures (alarm procedures, including set points) 8.

Radiation protection manual (radiation control manual or procedures) 9.

Emergency plan

10. Technical Specifications 11.

Plant ter.hnical data (curve book)

  • 12. Lesson plans (training manuals, learning objectives, plant orientation manual, systems. descriptions) 13.

Systems operating procedures 14.

Piping and instrumentation diagrams, electrical single-line diagrams, or flow diagrams

  • 15. Copies of facility R0 and SRO requalification examinations administered during the past 2 years.
16. Simulator malfunction list with descriptive summary of malfunction effects.

All of the above referenced material should be approved, final issues and should be so marked. Uncontrolled, preliminary, or other such issues will not be acceptable. All procedures and reference material should be bound or in the form used by the control room operators, with appropriate indexes or tables of contents to ensure efficient use.

0FFICIAL RECORD COPY OL REQUAL BVI - 0003.0.0 03/02/87