Category:SAFETY EVALUATION REPORT--LICENSING & RELATED ISSUES
MONTHYEARML20217G9961999-10-14014 October 1999 SER Accepting First 10-year Interval Inservice Insp Requests for Relief for Plant,Units 1 & ML20212A7441999-09-10010 September 1999 Safety Evaluation Concluding That Alternatives Contained in Relief Request 12R-07 Provide Acceptable Level of Quality & Safety ML20210U8111999-08-0404 August 1999 SER Granting Licensee Relief Requests VR-1,VR-3 & Portion of VR-2 Pursuant to 10CFR50.55a(a)(3)(ii).Relief Request VR-4 Does Not Require Explicit NRC Approval Because Relief Applies to Valves Not Required by 10CFR50.55a ML20210K9861999-07-30030 July 1999 Safety Evaluation Accepting Licensee 60-day Response to GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Movs ML20207B6481999-05-25025 May 1999 SER Accepting Revised SGTR Analysis for Byron & Braidwood Stations.Revised Analysis Was Submitted to Support SG Replacement at Unit 1 of Each Station ML20205C5101999-03-21021 March 1999 Revised Safety Evaluation Supporting Improved TS Amends Issued by NRC on 981222 to FOLs NPF-37,NPF-66,NPF-72 & NPF-77.Revised Pages Include Editorial Corrections ML20155B6711998-10-26026 October 1998 Safety Evaluation Accepting Requests for Relief Associated with Second 10-yr Interval ISI Program Plan ML20154D4401998-10-0202 October 1998 Safety Evaluation Authorizing Second 10-yr Interval ISI Program Request for Relief 12R-30 for Plant,Units 1 & 2 ML20238F3281998-08-31031 August 1998 SER Approving Second 10-year Interval Inservice Insp Program Request for Relief 12R-14 for Braidwood Station,Units 1 & 2 ML20217K6331998-04-20020 April 1998 Safety Evaluation Accepting Methodology & Criteria Used in Generating Flaw Evaluation Charts for RPV of Braidwood IAW Section XI of ASME Code ML20216F4921998-03-11011 March 1998 Correction to Safety Evaluation Re Revised SG Tube Rapture Analysis ML20197B7531998-03-0404 March 1998 SER Accepting License Request for Relief from Immediate Implementation of Amended Requirements of 10CFR50.55a for Plant,Units 1 & 2 ML20199G2591998-01-28028 January 1998 Safety Evaluation Rept Accepting Revised SG Tube Rupture Analysis ML20199H0031998-01-21021 January 1998 SER Accepting Pressure Temp Limits Rept & Methodology for Relocation of Reactor Coolant Sys pressure-temp Limit Curves & Low Temp Overpressure Protection Sys Limits for Byron Station,Units 1 & 2 & Braidwood Station,Units 1 & 2 ML20199C1401998-01-16016 January 1998 SER Accepting Request to Integrate Reactor Vessel Weld Metal Surveillance Program for Byron,Units 1 & 2 & Braidwood,Units 1 & 2 Per 10CFR50 ML20197G0041997-12-11011 December 1997 Safety Evaluation Accepting First 10-yr Interval Insp Program Plan,Rev 4 & Associated Requests for Relief for Plant ML20198R3061997-10-27027 October 1997 Staff Evaluation Rept Concluding That Licensee IPE Complete Wrt Info Requested by GL 88-20 & Process Meets Intent of Subj GL ML20217C1681997-09-22022 September 1997 Safety Evaluation Accepting Request for Relief from ASME Code,Section Iii,Div 2 for Repair of Damaged Concrete Reinforcement Steel NUREG-1335, Staff Evaluation Rept Concluding That Licensee IPE Complete Wrt Info Requested by GL 88-20 & Associated Guidance, NUREG-13351997-08-28028 August 1997 Staff Evaluation Rept Concluding That Licensee IPE Complete Wrt Info Requested by GL 88-20 & Associated Guidance, NUREG-1335 ML20141L9321997-05-29029 May 1997 Safety Evaluation Accepting Use of ASME Boiler & Pressure Vessel Code,Section Ix,Code Cases 2142-1 & 2143-1 for Reactor Coolant Sys for Plants ML20141B5551997-05-13013 May 1997 SE Accepting First 10-yr Interval Inservice Insp Program Plan Request for Relief NR-29 for Braidwood Station,Units 1 & 2 ML20140H8871997-05-0808 May 1997 Safety Evaluation Supporting Request for Relief from ASME Code Repair Requirements for ASME Code Class 3 Piping Ceco ML20129F9101996-10-25025 October 1996 Safety Evaluation Accepting Request to Apply LBB Analyses to Eliminate Large Primary Loop Pipe Rupture from Structural Design Basis for Plant,Units 1 & 2 ML20059E2871993-12-30030 December 1993 Safety Evaluation Supporting Amends 57,57,45,45,93,77,152 & 140 to Licenses NPF-37,NPF-66,NPF-72,NPF-77,NPF-11,NPF-18, DPR-39 & DPR-48 Respectively ML20058L9961990-08-0606 August 1990 Safety Evaluation Denying Licensee Response to Station Blackout Rule.Staff Recommends That Licensee Reevaluate Areas of Concern Identified in SER ML20247D1471989-07-18018 July 1989 SER Supporting Util Proposed Implementation of ATWS Design, Per 10CFR50.62 Requirements ML20155F1591988-10-0606 October 1988 Safety Evaluation Re Mixed Greases W/Greater than 5% Unqualified Contaminant in Limitorque Valve Operators. Insufficient Info Presented to Draw Conclusions ML20236L2001987-10-30030 October 1987 Safety Evaluation Supporting Amends 11 to Licenses NPF-37 & NPF-66,respectively & Amend 1 to License NPF-72 ML20210R2061987-02-0606 February 1987 Safety Evaluation Supporting Util 850517,0802,0823,1211 & 860429 Submittals Re Environ Effects of High Energy Line Breaks in Auxiliary Steam or Steam Generator Blowdown Sys. Design of Blowdown Sys Acceptable ML20210T2571987-02-0606 February 1987 SER Re Util 850802 Submittal Describing Design Details of Steam Generator Blowdown & Auxiliary Steam Sys to Detect & Isolate High Energy Line Breaks.Sys Design Acceptable, However,Two Deviations from IEEE-STD-297 Criteria Apparent ML20209C3571987-01-23023 January 1987 SER Supporting Facility Design,Per Generic Ltr 83-28,Item 4.5.2, Reactor Trip Sys Reliability,On-Line Testing ML20207Q2211987-01-16016 January 1987 SER Accepting Util 861117 Submittal on Utilization of Charcoal Absorber Matl in Safety & nonsafety-grade Air Filtration Units ML20211J7141986-11-0505 November 1986 Reevaluation & Affirmation of No Significant Change Finding Pursuant to Braidwood Station Unit 1 OL Antitrust Review ML20215D7341986-10-0101 October 1986 Safety Evaluation Re Util 860623 Request That One Startup Test Be Modified & Five Startup Tests Be Eliminated.Mod to Rod Drop Measurement Test & Elimination of Certain Other Startup Tests Acceptable ML20214N7201986-09-0909 September 1986 Safety Evaluation Conditionally Supporting Rod Swap Technique & Util Nuclear Analysis Methods for Control Rod Worth Measurements ML20206R0521986-06-25025 June 1986 Safety Evaluation Supporting Util 840229 & 860421 Responses to Generic Ltr 83-28,Items 3.2.1 & 3.2.2 Re post-maint Testing (All Other safety-related Components) ML20199K4021986-06-25025 June 1986 Safety Evaluation of Applicant 831105 & 840601 Responses to 830708 Generic Ltr 83-28,Item 2.1 (Part 1),requiring Identification of Reactor Trip Sys Components as safety- Related.Licensee Program Approved ML20197D5661986-05-0505 May 1986 SER Accepting Util Responses to Generic Ltr 83-28,Item 1.2, Post-Trip Review - Data & Info Capabilities IR 05000456/19840441986-02-25025 February 1986 Supplemental SER Re Electrical Separation Deficiencies Revealed During Const Appraisal Team Insps 50-456/84-44 & 50-457/84-40 ML20154C3641986-02-25025 February 1986 Suppl to Safety Evaluation Supporting Results of Tests Conducted by Wyle Labs Contained in Test Rept 17769-01 to Justify Less Separation Between Class 1E & non-Class 1E Cables than Required by Reg Guide 1.75 ML20209J1091985-11-0505 November 1985 SER Supporting Licensee Response to Generic Ltr 83-28,Items 3.1.3 & 3.2.3 Re post-maint Test Requirements That May Degrade Rather than Enhance Safety ML20138A8711985-10-0707 October 1985 Sser Supporting Util 850725 Proposed FSAR Change, Incorporating Nuclear Const Issues Group Rev 2 to Visual Weld Acceptance Criteria for Structural Welding at Nuclear Power Plants Into FSAR Table 3.8-2 & Section 3.10.3.2.2 ML20209G6381985-09-17017 September 1985 SER Supporting Util 831105 & 850215 Responses to Generic Ltr 83-28,Items 3.1.1 & 3.1.2, Post-Maint Testing Verification... & 4.1 & 4.5.1, Reactor Trip Sys Reliability.... Proposed Programs Meet Requirements ML20129H9071985-07-11011 July 1985 SER Accepting 850605 Submittal Re Generic Ltr 83-28,Item 1.1 on post-trip Review Program & Procedures ML20128M9391985-05-17017 May 1985 SER Based on Util 831105 Response to Generic Ltr 83-28, Item 1.1 Re post-trip Review Program Description & Procedure 1999-09-10
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217G9961999-10-14014 October 1999 SER Accepting First 10-year Interval Inservice Insp Requests for Relief for Plant,Units 1 & BW990066, Monthly Operating Repts for Sept 1999 for Braidwood Station, Units 1 & 2.With1999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Braidwood Station, Units 1 & 2.With ML20217P6351999-09-29029 September 1999 Non-proprietary Rev 6 to HI-982083, Licensing Rept for Spent Fuel Rack Installation at Byron & Braidwood Nuclear Stations ML20217A1691999-09-22022 September 1999 Part 21 Rept Re Engine Sys,Inc Controllers,Manufactured Between Dec 1997 & May 1999,that May Have Questionable Soldering Workmanship.Caused by Inadequate Personnel Training.Sent Rept to All Nuclear Customers ML20212A7441999-09-10010 September 1999 Safety Evaluation Concluding That Alternatives Contained in Relief Request 12R-07 Provide Acceptable Level of Quality & Safety BW990056, Monthly Operating Repts for Aug 1999 for Braidwood Station, Units 1 & 2.With1999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Braidwood Station, Units 1 & 2.With ML20210R6421999-08-13013 August 1999 ISI Outage Rept for A2R07 ML20210U8111999-08-0404 August 1999 SER Granting Licensee Relief Requests VR-1,VR-3 & Portion of VR-2 Pursuant to 10CFR50.55a(a)(3)(ii).Relief Request VR-4 Does Not Require Explicit NRC Approval Because Relief Applies to Valves Not Required by 10CFR50.55a BW990048, Monthly Operating Repts for Jul 1999 for Braidwood Station, Units 1 & 2.With1999-07-31031 July 1999 Monthly Operating Repts for Jul 1999 for Braidwood Station, Units 1 & 2.With ML20210K9861999-07-30030 July 1999 Safety Evaluation Accepting Licensee 60-day Response to GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Movs ML20216D3841999-07-12012 July 1999 Revised NFM9900022, Braidwood Unit 2 Cycle 8 COLR in ITS Format & W(Z) Function M990002, Revised NFM9900022, Braidwood Unit 2 Cycle 8 COLR in ITS Format & W(Z) Function1999-07-12012 July 1999 Revised NFM9900022, Braidwood Unit 2 Cycle 8 COLR in ITS Format & W(Z) Function BW990038, Monthly Operating Repts for June 1999 for Braidwood Station, Units 1 & 2.With1999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Braidwood Station, Units 1 & 2.With BW990029, Monthly Operating Repts for May 1999 for Braidwood Stations, Units 1 & 2.With1999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Braidwood Stations, Units 1 & 2.With ML20209H7481999-05-31031 May 1999 Revised Monthly Operating Repts for May 1999 for Braidwood Station,Units 1 & 2 ML20207B6481999-05-25025 May 1999 SER Accepting Revised SGTR Analysis for Byron & Braidwood Stations.Revised Analysis Was Submitted to Support SG Replacement at Unit 1 of Each Station ML20195B2591999-05-19019 May 1999 Rev 66a to CE-1-A,consisting of Proposed Changes to QAP for Dnps,Qcs,Znps,Lcs,Byron & Braidwood Stations BW990021, Monthly Operating Repts for Apr 1999 for Braidwood Station, Units 1 & 2.With1999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Braidwood Station, Units 1 & 2.With BW990016, Monthly Operating Repts for Mar 1999 for Braidwood Generating Station,Units 1 & 2.With1999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Braidwood Generating Station,Units 1 & 2.With ML20205C5101999-03-21021 March 1999 Revised Safety Evaluation Supporting Improved TS Amends Issued by NRC on 981222 to FOLs NPF-37,NPF-66,NPF-72 & NPF-77.Revised Pages Include Editorial Corrections ML20196A0721999-03-16016 March 1999 Cycle 8 COLR in ITS Format & W(Z) Function ML20207J4371999-03-0808 March 1999 ISI Outage Rept for A1R07 ML20204H9941999-03-0303 March 1999 Non-proprietary Rev 4 to HI-982083, Licensing Rept for Spent Fuel Rack Installation at Byron & Braidwood Nuclear Stations BW990010, Monthly Operating Repts for Feb 1999 for Braidwood Generating Station,Units 1 & 2.With1999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Braidwood Generating Station,Units 1 & 2.With ML20206U9011999-02-15015 February 1999 COLR for Braidwood Unit 2 Cycle 7. Page 1 0f 13 of Incoming Submittal Was Not Included BW990004, Monthly Operating Repts for Jan 1999 for Braidwood Generating Station,Units 1 & 2.With1999-01-31031 January 1999 Monthly Operating Repts for Jan 1999 for Braidwood Generating Station,Units 1 & 2.With ML20205M7061998-12-31031 December 1998 Unicom Corp 1998 Summary Annual Rept. with BW990001, Monthly Operating Repts for Dec 1998 for Braidwood Generating Station,Units 1 & 2.With1998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Braidwood Generating Station,Units 1 & 2.With ML20206B4001998-12-31031 December 1998 Annual & 30-Day Rept of ECCS Evaluation Model Changes & Errors for Byron & Braidwood Stations ML20206U9081998-12-17017 December 1998 Cycle 8 COLR in ITS Format & W(Z) Function BW980076, Monthly Operating Repts for Nov 1998 for Braidwood Generating Station,Units 1 & 2.With1998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Braidwood Generating Station,Units 1 & 2.With ML20196A4191998-11-19019 November 1998 Safety Evaluation Accepting QA TR CE-1-A,Rev 66 Re Changes in Independent & Onsite Review Organization by Creating NSRB ML20195D3561998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Braidwood Generating Station,Units 1 & 2.With ML20155B6711998-10-26026 October 1998 Safety Evaluation Accepting Requests for Relief Associated with Second 10-yr Interval ISI Program Plan ML20207H7671998-10-0505 October 1998 Rv Weld Chemistry & Initial Rt Ndt ML20154D4401998-10-0202 October 1998 Safety Evaluation Authorizing Second 10-yr Interval ISI Program Request for Relief 12R-30 for Plant,Units 1 & 2 ML20155C2601998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Braidwood Generating Station,Units 1 & 2 ML20195F5911998-09-11011 September 1998 Special Rept:On 980812,addl Unseated Wires Were Discovered. Cause Is Unknown at Present Time.Util Evaluated Number of Unseated/Ineffective Wires & Determined Effect on Containment Structural Integrity.Commitments,Encl ML20196B3711998-09-0808 September 1998 Cycle 8 Operating Limits Rept (Olr) ML20151X6671998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Braidwood Generating Station,Units 1 & 2.With ML20238F3281998-08-31031 August 1998 SER Approving Second 10-year Interval Inservice Insp Program Request for Relief 12R-14 for Braidwood Station,Units 1 & 2 ML20237E2331998-08-21021 August 1998 Revised Pages of Section 20 of Rev 66 to CE-1-A, QA Topical Rept ML20237A1091998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Braidwood Generating Station,Unit 1 & 2 ML20236N7001998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Braidwood Generating Station,Units 1 & 2 ML20198A0151998-06-18018 June 1998 10CFR50.59 Summary Rept 960619 Through 980618, Vols I & Ii,Consisting of Descriptions & SE Summaries for Changes to Procedural UFSAR Changes,Tests & Experiments & FP Rept.Without Fp,Rept ML20249A5451998-05-31031 May 1998 Monthly Operating Repts for May 1998 for Braidwood Generating Station Units 1 & 2 ML20247F7711998-05-0808 May 1998 Special Rept:On 980403 & 980503 Seismic Monitoring Sys Was Declared Inoperable.Caused by 5-volt Power Supply & Regulator Card Failure.Imd & Sys Engineering Are Continuing to Identify & Resolve Problems So Sys Can Be Operable ML20247L7591998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for Braidwood Generating Station,Units 1 & 2 ML20217K6331998-04-20020 April 1998 Safety Evaluation Accepting Methodology & Criteria Used in Generating Flaw Evaluation Charts for RPV of Braidwood IAW Section XI of ASME Code ML20216C6621998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Braidwood Generating Station,Units 1 & 2 1999-09-30
[Table view] |