ML20207Q097 | |
Person / Time | |
---|---|
Site: | Pilgrim, Seabrook, Vermont Yankee, 05000000 |
Issue date: | 12/29/1986 |
From: | Tye L BOSTON GLOBE, BOSTON, MA |
To: | Grimsley D NRC OFFICE OF ADMINISTRATION (ADM) |
References | |
FOIA-87-10 NUDOCS 8701230014 | |
Download: ML20207Q097 (2) | |
Category:CORRESPONDENCE-LETTERS
MONTHYEARML20217N3901999-10-25025 October 1999
[Table view]Advises That Info Provided in & Affidavit Re Holtec Position Paper WS-115,rev 1,repts HI-87113, Rev 0,HI-87114,rev 0,HI-87102 Rev 0 & HI-87112,rev 0,marked Proprietary,Will Be Withheld from Public Disclosure ML20217M8771999-10-25025 October 1999 Requests That Industry Studies on long-term Spent Fuel Pool Cooling Be Provided to R Dudley at Listed Mail Stop ML20217L8591999-10-21021 October 1999 Discusses 990921 Request for Approval to Perform Alternative Testing as Part of Vermont Yankee Nuclear Power Station IST Program.Informs That Submittal Reviewed Against ASME Code Section XI Requirements & Forwards Safety Evaluation ML20217M1181999-10-19019 October 1999 Forwards NRC Rept Number 17, Requal Tracking Rept from Operator Licensing Tracking Sys.Rept Was Used by NRC to Schedule Requalification Exam for Operators & Record Requal Pass Dates ML20217M4331999-10-19019 October 1999 Submits Rept 17, Requal Tracking Rept from Operator Tracking Sys. Rept Was Used by NRC to Schedule Requalification Exams for Operators & Record Requal Pass Dates ML20217N8911999-10-15015 October 1999 Forwards Rept of Changes,Tests & Experiments at Pilgrim Nuclear Power Station for Period of 970422-990621,IAW 10CFR50.59(b).List of Changes Effecting Fsar,Encl ML20217D3951999-10-13013 October 1999 Forwards Request for Addl Info Re Util 990806 Submittal on USI A-46, Implementation Methodology Used at Pilgrim Nuclear Power Station, Per GL 87-02 ML20217D9711999-10-13013 October 1999 Responds to Request That Information Titled Addl Info Re Cycle Specific SLMCPR for Vermont Yankee Cycle 21 Be Withheld from Public Disclosure.Determined Info to Be Proprietary & Will Be Withheld from Public Disclosure ML20217F5841999-10-13013 October 1999 Requests Revocation of License OP-11038-1 for GE Kingsley. Individual Has Been Reassigned to Position within Naesco ML20217F5811999-10-13013 October 1999 Forwards Insp Data & Naesco Evaluation of a EDG Exhaust Insp Conducted on 990407.Insp Ensured That Unacceptable Wall Thinning Will Not Occur During 40-year Design Lifetime of Sys ML20217F1261999-10-12012 October 1999 Forwards Update to Previously Submitted RELAP5 Analytical Assumptions for App R,Re RAI of 961104 BVY-99-130, Provides Clarification of Method for Determining MSIV Maximum & Minimum Pathway at Vermont Yankee Nuclear Power Station1999-10-0808 October 1999 Provides Clarification of Method for Determining MSIV Maximum & Minimum Pathway at Vermont Yankee Nuclear Power Station ML20217E1581999-10-0808 October 1999 Forwards Insp Rept 50-293/99-05 on 990726-0905.Three Violations Noted & Being Treated as Ncvs.Violations Include Failure to Assure That Design Bases Correctly Translated Into Specifications ML20217C7321999-10-0808 October 1999 Forwards Copy of Seabrook Station Videotape Entitled, Completion of Seal Barrier Installation. Videotape Documents Process of Selecting,Designing & Installing Seal Deterrent Barrier to Preclude Entrapment of Seals ML20217C1501999-10-0707 October 1999 Forwards Insp Rept 50-271/99-11 on 990809-27.No Violations Noted.Insp Focused on Effectiveness of Engineering Functions in Providing for Safe Operation of Plant BVY-99-128, Submits Listed Addl Info in Support of 990414 Request for Clarification to SER Confirming Adequacy of Space Cooling for HPCI & RCIC Sys,Re Item II.K.3.24 of NUREG-0737.Copy of NEDE-24955,encl1999-10-0606 October 1999 Submits Listed Addl Info in Support of 990414 Request for Clarification to SER Confirming Adequacy of Space Cooling for HPCI & RCIC Sys,Re Item II.K.3.24 of NUREG-0737.Copy of NEDE-24955,encl ML20217C3151999-10-0606 October 1999 Forwards Scenario Package for Pilgrim Nuclear Power Station Nrc/Fema Evaluated Exercise Scheduled for 991207.Without Encl ML20217C8051999-10-0505 October 1999 Forwards Proprietary Results of Audiologic Evaluations for Jp Giar,License SOP-10061-3.Attachment Clearly Shows Requirements for Operator Hearing Ability Are Met. Proprietary Info Withheld,Per 10CFR2.790(a)(6) ML20217D5591999-10-0505 October 1999 Documents Pilgrim Nuclear Power Station Five Yr Survey of Main Breakwater.Survey Has Determined That Pilgrim Main Breakwater Is Intact & Remains Adequately Constructed to Perform Designed Safety Function ML20217B8621999-10-0505 October 1999 Forwards Rev 28,change 1 to EPIP Er 1.1, Classification & Emergencies, Per 10CFR50.54(q).Rev to Procedure Does Not Decrease Effectiveness of Seabrook Station Radiological Emergency Plan ML20212J7891999-10-0404 October 1999 Informs That Licensee 980804,0628,29 & 990921 Responses to GL 98-01, Y2K Readiness of Computer Sys at NPPs Acceptable.Nrc Consider Subj GL to Be Closed for Plant ML20217B7471999-10-0101 October 1999 Provides Notification of Change in PCT of More than 50 F,Per Requirements of 10CFR50.46(a)(3)(i),(ii).Tabulation of Large Break LOCA PCT Margin Utilization Applicable to Seabrook Station,Encl ML20212J8271999-09-30030 September 1999 Informs of Completion of mid-cycle PPR of Seabrook Station. Staff Conducted Reviews for All Operating NPPs to Integrate Performance Info & to Plan for Insp Activities at Facility Over Next Six Months.Plant Issues Matrix & Insp Plan Encl ML20212K7921999-09-30030 September 1999 Confirms 990922 Telcon with J D'Antonio & T Grew Re Arrangements Made for NRC to Inspect Licensed Operator Requalification Program at Seabrook Facility ML20216J2381999-09-30030 September 1999 Responds to Re Enforcement Discretion for Nuclear Plants During Y2K Transition.Nrc Expects All Licensees to Operate Nuclear Facilities Safety IAW NRC Regulations & Requirements ML20216J2421999-09-30030 September 1999 Responds to Card Received in Aug 1999,providing Comments on NRC Interim Enforcement Policy Re Enforcement Discretion for Nuclear Plants During Y2K Transition.Informs That Naesc Reported Seabrook as Y2K Ready Prior to 990701 ML20216J2471999-09-30030 September 1999 Responds to Which Provided Comments on NRC Interim Enforcement Policy Re Enforcement Discretion for Nuclear Plants During Y2K Transition.Informs That Naesc Reported Seabrook as Y2K Ready Prior to 990701 ML20212J8301999-09-30030 September 1999 Informs of Completion of mid-cycle PPR of Pilgrim Nuclear Power Station.Staff Conducts Reviews for All Operating NPPs to Integrate Performance Info & to Plan Insp Activities at Facility Over Next Six Months ML20212J6501999-09-30030 September 1999 Informs of Completion of mid-cycle PPR of VYNPS on 990913. No New Areas Identified in Which Licensee Performance Warranted Addl Insp Beyond Core Insp Program.Historical Listing of Plant Issues & Insp Plan Through Mar 2000 Encl ML20216J3531999-09-29029 September 1999 Responds to NRC Re Violations Noted in Insp Rept 50-271/99-12 on 990628-0811.Corrective Actions:Based on RFO 20 Maint Rule Outage Performance Review,Task Was Generated to Clarify & Enhance SD Monitoring Process ML20216J9961999-09-29029 September 1999 Forwards Resume of Person Identified as Acting RPM in Licensee to NRC Re Notification That Person Named in License Condition 11 of 20-07626-02,is No Longer Employed at Pilgrim Station.Resume Withheld,Per 10CFR2.790 BVY-99-122, Notifies of Intention to Reinstate Original Version of App F in FSAR & Correct Docket Re Assumption That Electrical Power Sys Are Designed IAW Requirements of GDC-171999-09-28028 September 1999 Notifies of Intention to Reinstate Original Version of App F in FSAR & Correct Docket Re Assumption That Electrical Power Sys Are Designed IAW Requirements of GDC-17 ML20212J0301999-09-24024 September 1999 Forwards Insp Rept 50-443/99-10 on 990726-30 & 0809-13.No Violations Noted.Insp Discussed ML20212F7871999-09-24024 September 1999 Advises That Util 990121 Application for Amend Being Treated as Withdrawn.Proposed Changes Would Have Modified Facility UFSAR Pertaining to Values for post-accident Containment Pressure Credited in Pilgrim Net Positive Head Analyses ML20212H1381999-09-23023 September 1999 Submits Info in Support of Request Filed on 990730 to Grant one-time Exemption from 10CFR50,App E,Authorizing Biennial Full Participation Emergency Preparedness Exercise to Be Conducted in 2002 Instead of 2001 ML20212H1441999-09-23023 September 1999 Withdraws 990121 Request for License Change Re Emergency Core Cooling Sys Net Positive Suction Head,Due to Incorrect Datum Preparation BVY-99-114, Provides Notification That Licensee Completed Y2K Remediation Efforts Described in Util 990608 Response to NRC GL 98-01,Suppl 11999-09-21021 September 1999 Provides Notification That Licensee Completed Y2K Remediation Efforts Described in Util 990608 Response to NRC GL 98-01,Suppl 1 BVY-99-116, Informs of Determination That Wh Schulze,License SOP-10528-1,will No Longer Maintain License at Facility. Termination of License Requested1999-09-21021 September 1999 Informs of Determination That Wh Schulze,License SOP-10528-1,will No Longer Maintain License at Facility. Termination of License Requested BVY-99-113, Requests Approval to Perform Alternative Testing to That Specified by ASME Boiler & Pressure Vessel Code,Section XI & Asme/Ansi OM, Operation & Maint of Nuclear Power Plants. Attachment 1 Provides Justification for Alternative Testing1999-09-21021 September 1999 Requests Approval to Perform Alternative Testing to That Specified by ASME Boiler & Pressure Vessel Code,Section XI & Asme/Ansi OM, Operation & Maint of Nuclear Power Plants. Attachment 1 Provides Justification for Alternative Testing ML20212G5071999-09-21021 September 1999 Submits Complaint to NRC Re NRC Failure to Cite Seabrook Station NPP Operators for Failing to Periodically Calibrate & Establish Adequate Measures to Insure That Relay Equipment Met All Required Calibration Settings Prior to Installation ML20212C1881999-09-20020 September 1999 Ack Receipt of Which Raised Concerns Re NRC Enforcement Actions at Plant & Issuance of NCVs BVY-99-121, Requests Extension Until 990929 to Respond to Violations Noted in Insp Rept 50-271/99-12,dtd 990819.Licensee Did Not Receive Rept Until 990830 & Addl Time Is Needed to Prepare & Allow for Adequate Review of Violation Response Submittal1999-09-20020 September 1999 Requests Extension Until 990929 to Respond to Violations Noted in Insp Rept 50-271/99-12,dtd 990819.Licensee Did Not Receive Rept Until 990830 & Addl Time Is Needed to Prepare & Allow for Adequate Review of Violation Response Submittal ML20212C1621999-09-17017 September 1999 Forwards Amend 175 to License DPR-28 & Safety Evaluation. Amend Revises TSs to Enhance Limiting Conditions for Operation & Surveillance Requirements Relating to Standby Liquid Control System ML20212B9511999-09-17017 September 1999 Forwards NRC Form 396 for MG Sketchley,License SOP-10685, Along with Supporting Medical Exam Info.Nrc Form 396 Has Been Superceded by Revised Version Dtd 971222,which Was Previously Submitted to NRC on 990812.Encl Withheld ML20212D1401999-09-17017 September 1999 Forwards SE Accepting Request to Use Proposed Alternative to Certain Weld Repair Requirements in ASME Boiling & Pressure Vessel Code ML20212C2861999-09-16016 September 1999 Forwards SER Accepting Licensee 981123 Request for Relief RR-E1,RR-E5,RR-E6 Pursuant to 10CFR50.55a(a)(3)(i) & Request for Relief RR-E2,RR-E3 & RR-E4 Pursuant to 10CFR50.55a(a)(3)(ii) ML20216F3451999-09-16016 September 1999 Forwards Summary Rept Providing Results of ISI Conducted at PNPS on-line & Refueling Outage (RFO 12) BVY-99-115, Forwards non-proprietary & Proprietary Responses to 990714 RAI Re Civil & Mechanical Engineering Considerations for Proposed Change to TS to Increase Spent Fuel Storage Capacity from 2,870 to 3,355.Proprietary Encls Withheld1999-09-16016 September 1999 Forwards non-proprietary & Proprietary Responses to 990714 RAI Re Civil & Mechanical Engineering Considerations for Proposed Change to TS to Increase Spent Fuel Storage Capacity from 2,870 to 3,355.Proprietary Encls Withheld BVY-99-118, Responds to RAI Concerning GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design-Basis Accident Conditions1999-09-16016 September 1999 Responds to RAI Concerning GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design-Basis Accident Conditions ML20212C3621999-09-15015 September 1999 Forwards Rev 34 to Seabrook Station Radiological Emergency Plan & Rev 85 to Seabrook Station Emergency Response Manual, Per 10CFR50,App E & 10CFR50.4 1999-09-30 Category:INCOMING CORRESPONDENCE MONTHYEARML20217N8911999-10-15015 October 1999
[Table view]Forwards Rept of Changes,Tests & Experiments at Pilgrim Nuclear Power Station for Period of 970422-990621,IAW 10CFR50.59(b).List of Changes Effecting Fsar,Encl ML20217F5811999-10-13013 October 1999 Forwards Insp Data & Naesco Evaluation of a EDG Exhaust Insp Conducted on 990407.Insp Ensured That Unacceptable Wall Thinning Will Not Occur During 40-year Design Lifetime of Sys ML20217F5841999-10-13013 October 1999 Requests Revocation of License OP-11038-1 for GE Kingsley. Individual Has Been Reassigned to Position within Naesco ML20217F1261999-10-12012 October 1999 Forwards Update to Previously Submitted RELAP5 Analytical Assumptions for App R,Re RAI of 961104 BVY-99-130, Provides Clarification of Method for Determining MSIV Maximum & Minimum Pathway at Vermont Yankee Nuclear Power Station1999-10-0808 October 1999 Provides Clarification of Method for Determining MSIV Maximum & Minimum Pathway at Vermont Yankee Nuclear Power Station BVY-99-128, Submits Listed Addl Info in Support of 990414 Request for Clarification to SER Confirming Adequacy of Space Cooling for HPCI & RCIC Sys,Re Item II.K.3.24 of NUREG-0737.Copy of NEDE-24955,encl1999-10-0606 October 1999 Submits Listed Addl Info in Support of 990414 Request for Clarification to SER Confirming Adequacy of Space Cooling for HPCI & RCIC Sys,Re Item II.K.3.24 of NUREG-0737.Copy of NEDE-24955,encl ML20217C3151999-10-0606 October 1999 Forwards Scenario Package for Pilgrim Nuclear Power Station Nrc/Fema Evaluated Exercise Scheduled for 991207.Without Encl ML20217D5591999-10-0505 October 1999 Documents Pilgrim Nuclear Power Station Five Yr Survey of Main Breakwater.Survey Has Determined That Pilgrim Main Breakwater Is Intact & Remains Adequately Constructed to Perform Designed Safety Function ML20217C8051999-10-0505 October 1999 Forwards Proprietary Results of Audiologic Evaluations for Jp Giar,License SOP-10061-3.Attachment Clearly Shows Requirements for Operator Hearing Ability Are Met. Proprietary Info Withheld,Per 10CFR2.790(a)(6) ML20217B8621999-10-0505 October 1999 Forwards Rev 28,change 1 to EPIP Er 1.1, Classification & Emergencies, Per 10CFR50.54(q).Rev to Procedure Does Not Decrease Effectiveness of Seabrook Station Radiological Emergency Plan ML20217B7471999-10-0101 October 1999 Provides Notification of Change in PCT of More than 50 F,Per Requirements of 10CFR50.46(a)(3)(i),(ii).Tabulation of Large Break LOCA PCT Margin Utilization Applicable to Seabrook Station,Encl ML20216J3531999-09-29029 September 1999 Responds to NRC Re Violations Noted in Insp Rept 50-271/99-12 on 990628-0811.Corrective Actions:Based on RFO 20 Maint Rule Outage Performance Review,Task Was Generated to Clarify & Enhance SD Monitoring Process ML20216J9961999-09-29029 September 1999 Forwards Resume of Person Identified as Acting RPM in Licensee to NRC Re Notification That Person Named in License Condition 11 of 20-07626-02,is No Longer Employed at Pilgrim Station.Resume Withheld,Per 10CFR2.790 BVY-99-122, Notifies of Intention to Reinstate Original Version of App F in FSAR & Correct Docket Re Assumption That Electrical Power Sys Are Designed IAW Requirements of GDC-171999-09-28028 September 1999 Notifies of Intention to Reinstate Original Version of App F in FSAR & Correct Docket Re Assumption That Electrical Power Sys Are Designed IAW Requirements of GDC-17 ML20212H1381999-09-23023 September 1999 Submits Info in Support of Request Filed on 990730 to Grant one-time Exemption from 10CFR50,App E,Authorizing Biennial Full Participation Emergency Preparedness Exercise to Be Conducted in 2002 Instead of 2001 ML20212H1441999-09-23023 September 1999 Withdraws 990121 Request for License Change Re Emergency Core Cooling Sys Net Positive Suction Head,Due to Incorrect Datum Preparation BVY-99-113, Requests Approval to Perform Alternative Testing to That Specified by ASME Boiler & Pressure Vessel Code,Section XI & Asme/Ansi OM, Operation & Maint of Nuclear Power Plants. Attachment 1 Provides Justification for Alternative Testing1999-09-21021 September 1999 Requests Approval to Perform Alternative Testing to That Specified by ASME Boiler & Pressure Vessel Code,Section XI & Asme/Ansi OM, Operation & Maint of Nuclear Power Plants. Attachment 1 Provides Justification for Alternative Testing ML20212G5071999-09-21021 September 1999 Submits Complaint to NRC Re NRC Failure to Cite Seabrook Station NPP Operators for Failing to Periodically Calibrate & Establish Adequate Measures to Insure That Relay Equipment Met All Required Calibration Settings Prior to Installation BVY-99-116, Informs of Determination That Wh Schulze,License SOP-10528-1,will No Longer Maintain License at Facility. Termination of License Requested1999-09-21021 September 1999 Informs of Determination That Wh Schulze,License SOP-10528-1,will No Longer Maintain License at Facility. Termination of License Requested BVY-99-114, Provides Notification That Licensee Completed Y2K Remediation Efforts Described in Util 990608 Response to NRC GL 98-01,Suppl 11999-09-21021 September 1999 Provides Notification That Licensee Completed Y2K Remediation Efforts Described in Util 990608 Response to NRC GL 98-01,Suppl 1 BVY-99-121, Requests Extension Until 990929 to Respond to Violations Noted in Insp Rept 50-271/99-12,dtd 990819.Licensee Did Not Receive Rept Until 990830 & Addl Time Is Needed to Prepare & Allow for Adequate Review of Violation Response Submittal1999-09-20020 September 1999 Requests Extension Until 990929 to Respond to Violations Noted in Insp Rept 50-271/99-12,dtd 990819.Licensee Did Not Receive Rept Until 990830 & Addl Time Is Needed to Prepare & Allow for Adequate Review of Violation Response Submittal ML20212B9511999-09-17017 September 1999 Forwards NRC Form 396 for MG Sketchley,License SOP-10685, Along with Supporting Medical Exam Info.Nrc Form 396 Has Been Superceded by Revised Version Dtd 971222,which Was Previously Submitted to NRC on 990812.Encl Withheld BVY-99-115, Forwards non-proprietary & Proprietary Responses to 990714 RAI Re Civil & Mechanical Engineering Considerations for Proposed Change to TS to Increase Spent Fuel Storage Capacity from 2,870 to 3,355.Proprietary Encls Withheld1999-09-16016 September 1999 Forwards non-proprietary & Proprietary Responses to 990714 RAI Re Civil & Mechanical Engineering Considerations for Proposed Change to TS to Increase Spent Fuel Storage Capacity from 2,870 to 3,355.Proprietary Encls Withheld BVY-99-118, Responds to RAI Concerning GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design-Basis Accident Conditions1999-09-16016 September 1999 Responds to RAI Concerning GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design-Basis Accident Conditions ML20216F3451999-09-16016 September 1999 Forwards Summary Rept Providing Results of ISI Conducted at PNPS on-line & Refueling Outage (RFO 12) ML20212C3621999-09-15015 September 1999 Forwards Rev 34 to Seabrook Station Radiological Emergency Plan & Rev 85 to Seabrook Station Emergency Response Manual, Per 10CFR50,App E & 10CFR50.4 ML20216E7111999-09-0909 September 1999 Forwards License Renewal Application Including Form NRC-398 & Form NRC-396 for Jp Giar,License SOP-10061-3.Without Encls ML20211Q8521999-09-0808 September 1999 Informs That Rl Couture,License SOP-11027,terminated Employment at Naesco on 990907.Revocation of License Requested ML20216E5891999-09-0707 September 1999 Forwards Copy of Pilgrim Station Organization Structure. Encl Refelcts Changes in Upper Mgt Level Structure.Changes Were Effective 990901 ML20211M4501999-09-0303 September 1999 Informs That Pilgrim Nuclear Power Station Plans to Conduct Full Participation Emergency Preparedness Exercise with Commonwealth of Ma on 991207,IAW 10CFR50,App E,Section IV.F.2 ML20211J9291999-09-0303 September 1999 Forwards mark-ups & Retypes of Proposed Conforming License Changes Required in Connection with Transfers Being Sought in 990615 Application of Montaup Electric Co & New England Power Co for Transfer of Licenses & Ownership Interests ML20211N8781999-09-0303 September 1999 Forwards Response to 990820 RFI Re NRC Administrative Ltr 99-03, Preparation & Scheduling of Operator Licensing Exams ML20211M3221999-09-0202 September 1999 Responds to NRC Re Violations Noted in Insp of License NPF-86 & Proposed Imposition of Civil Penalty. Corrective Actions:Conducted Prompt Review of Layoff Decision to Determine Relevant Facts ML20211J8411999-09-0101 September 1999 Forwards Updated NRC Form 396 for E Decosta,Nrc License OP-10655-1.Without Encl ML20211J8811999-09-0101 September 1999 Forwards Comments on Seabrook Station Review of Reactor Vessel Integrity Database (Rvid)(Version 2).Minor Discrepancies Were Noted.Proposed Changes Are Encl in Order to Correct Discrepancies BVY-99-111, Informs That Encl TS Bases Page 91 Has Been Revised to Allow Reactivity Anomaly BOC Steady State Core Reactivity to Be Normalized Between off-line Uncorrected Solution & on-line 3D-Monicore Exposure Corrected Solution1999-08-31031 August 1999 Informs That Encl TS Bases Page 91 Has Been Revised to Allow Reactivity Anomaly BOC Steady State Core Reactivity to Be Normalized Between off-line Uncorrected Solution & on-line 3D-Monicore Exposure Corrected Solution BVY-99-110, Informs of Util Intent to Replace Commitments Made in Licensee & Subsequently Ack in NRC with Containment Insp Criteria Defined in 10CFR50.55a(b)(2)(vi),per Drywell Coating Insp1999-08-31031 August 1999 Informs of Util Intent to Replace Commitments Made in Licensee & Subsequently Ack in NRC with Containment Insp Criteria Defined in 10CFR50.55a(b)(2)(vi),per Drywell Coating Insp ML20211M9161999-08-31031 August 1999 Submits Review & Correction of Info in Reactor Vessel Integrity Database (Rvid),Version 2,re Pilgrim Station ML20211J8391999-08-30030 August 1999 Forwards Rev 1 to Provisional Decommissioning Trust Agreement for Plant,Changing Portions of Agreement to Permit Up to Two Distributions & Clarify Formula for Distribution ML20211G9191999-08-27027 August 1999 Informs NRC That Name of New Company, Ref in Order Approving Application Re Corporate Merger Is Nstar Which Is Massachusetts Business Trust BVY-99-107, Submits Response to NRC RAI Re Proposed Change to TS to Increase Spent Fuel Storage Capacity from 2,870 to 3,355 Fuel Assemblies1999-08-26026 August 1999 Submits Response to NRC RAI Re Proposed Change to TS to Increase Spent Fuel Storage Capacity from 2,870 to 3,355 Fuel Assemblies ML20211G7761999-08-24024 August 1999 Expresses Great Concern Re Lack of Enforcement Actions Against Seabrook Station Despite Citations NRC Has Issued for Violations of Seabrook Operating License ML20211J2171999-08-23023 August 1999 Expresses Disappointment with Lack of Enforcement Action Against Seabrook Station Despite Repeated Safety Violations ML20211J4971999-08-21021 August 1999 Submits Comments Re Violations Cited in Early Mar & 990509 Insps BVY-99-108, Requests That Gv Bogue,Bj Croke,Vs Ferrizzi,Me French, Bk Mcnutt,Jf Meyer & DM Navarro Take BWR Gfes of OL Exam Administered on 991006.DA Daigler & ST Brown Will Have Access to Exams Before Tests Administered1999-08-19019 August 1999 Requests That Gv Bogue,Bj Croke,Vs Ferrizzi,Me French, Bk Mcnutt,Jf Meyer & DM Navarro Take BWR Gfes of OL Exam Administered on 991006.DA Daigler & ST Brown Will Have Access to Exams Before Tests Administered ML20211H8361999-08-19019 August 1999 Submits Concerns Re Violations at Seabrook Station ML20211C3381999-08-19019 August 1999 Provides semi-annual LTP Update,Including Schedule, Commitment Descriptions,Progress Since Last Update & Summary of Changes.Rev Bars Indicate Changes in Status Since Last Submittal BVY-99-103, Informs That Util Expects to Submit Approx Twenty Licensing Actions in FY00 & FY01,in Response to Administrative Ltr 99-021999-08-18018 August 1999 Informs That Util Expects to Submit Approx Twenty Licensing Actions in FY00 & FY01,in Response to Administrative Ltr 99-02 ML20211B3841999-08-16016 August 1999 Forwards Response to NRC Second RAI Re Pressure Locking & Thermal Binding of SR power-operated Gate Valves ML20211J1831999-08-15015 August 1999 Submits Concerns Over Serious Deficiencies at Seabrook Station That NRC Has Declined to Take Enforcement Actions Against 1999-09-09 Category:PUBLIC ENTITY/CITIZEN/ORGANIZATION/MEDIA TO NRC MONTHYEARML20058C1261990-09-0606 September 1990
[Table view]Expresses Strong Objection to NRC Response to OIG Rept on Region I Review of off-site Emergency Preparedness ML20059H2761990-08-29029 August 1990 Advises That Intervenors Intend to Prepare & File Further Affidavit Re Emergency Motion to Reopen Record on Adequacy of Staffing of State of Nh Radiological Emergency Response Plan & for Immediate Shutdown.Svc List Encl ML20028G9051990-08-14014 August 1990 Comments on Current State of Emergency Preparedness in Local Communities within 10 Mile EPZ Around Facility.Believes NRC in Violation of 10CFR50.47 & Not Providing Adequate Emergency Planning to Assure Safety of Public ML20063Q0521990-07-31031 July 1990 Requests That Plant Be Returned to 5% Power Until Emergency Planning Does Offer Reasonable Assurance ML20056B1721990-07-30030 July 1990 Advises That Director'S Decision DD-90-4 Nonresponsive & Noncompliant W/Provisions of 10CFR2.206 & Noncompliant W/ Aslab Memorandum & Order of 900123 for Stated Reasons ML20055G7641990-07-0404 July 1990 Requests Info Re Type of Amend to License DPR-35 That Permits Single Loop Operation at Greater than 50% Power, Provided That Statements in Encl Article in Providence Journal Newspaper True,Per ASLB 840126 Order ML20043H2941990-06-11011 June 1990 Comments on Two Recent Requests by Boston Edison to Amend License for Plant.Trend to Reduce Testing & Lengthen Allowed out-of-svc Periods of Great Concern.Solution Should Be to Improve How Tests Conducted ML20043C6771990-05-30030 May 1990 Informs That Author Will Be Unable to Attend 900605 Prehearing Conference in Concord,Nh.Counsel for Atty General of Commonwealth of Ma Will Represent Necnp Interests at Prehearing Conference ML20043G9871990-05-16016 May 1990 Advises That Author Established Network to Monitor Emissions from Plant.Mission Statement Outlining Objectives & Methodology of Network Encl.Nrc Will Be Added to Mail List ML20055G3341990-05-0606 May 1990 Comments in Opposition of Nuclear Power Plant Going on-line Above 5% Power ML20012E7661990-03-27027 March 1990 Advises That Seacoast Anti-Pollution League Has No Intention of Proceeding Further in Proceedings Before Appeal Board Due to Intervenor Inability to Justify Expense of Further Participation.Svc List Encl ML20043F5111990-03-26026 March 1990 FOIA Request for Records Re NRC Investigation Rept on Pilgrim Station ML20012E7361990-03-25025 March 1990 Ack Offer to Answer Questions Re NRC Review of Numerous Requests for Relief by Util from Full Compliance W/Plant First 10-yr Inservice Insp Requirements & Submits Questions Re 900327 Ltr ML20012C6671990-03-15015 March 1990 Emergency Petition for Extension of Stay.* Forwards Notarized Copy of Rd Pollard Affidavit Supporting Emergency Petition for Extension of Stay Filed on 900314 ML20006G1201990-02-27027 February 1990 Requests Leave to File Encl Further Comments of Seacoast Anti-Pollution League Re Immediate Effectiveness of Licensing Authorization,Or in Alternative,In Support of Stay.Comments Directed to Substantial Change in State Plan ML20012A3051990-02-26026 February 1990 Requests Info Re What Blueprints,Plans,Diagrams & Catalogs Available to cross-ref Various Welds & Weld Locations at Unit 1 & Why Both Surface & Volumetric Weld Insps Required ML20006D8351990-02-0101 February 1990 Forwards Statement of Issues to Be Included in Seacoast Anti-Pollution League Brief in Support of LBP-89-32,in Response to 900131 Order ML20006F4391990-02-0101 February 1990 Readiness Review.* Requests Board to Consider Stated Written Views of Attachments to NRC 900108 & 09 Ltrs Due to Intervenors Not Receiving Documents Until Afternoon of 900118 & After Commission Meeting Ended.W/Related Info ML20011E6351990-02-0101 February 1990 Requests NRC Investigation of Allegation That Number of Keycards That Permit Entry to Protected Areas No Longer in Possession of Individuals to Whom They Were Issued ML20006D3131990-01-29029 January 1990 Forwards Revised Brief on Appeal of Partial Initial Decision on Spmc & 1988 FEMA-graded Exercise (LBP-89-32) to Include Portions of Transcript Cited in Brief as App ML20006B2381990-01-24024 January 1990 Forwards Seacoast Anti-Pollution League Brief in Support of Petitions for Review of LBP-89-32.Also Joins in Commonwealth of Ma 900122 Brief in Support of Appeal of LBP-89-38 ML20006B1851990-01-19019 January 1990 Forwards Opening Statement on Behalf of Seacoast Anti-Pollution League Re Offsite Emergency Planning & Safety Issues.Adequate Emergency Planning at Facility May Not Be Feasible & License Should Not Be Issued.Svc List Encl ML20006A2621990-01-18018 January 1990 Expresses Concern Re Safety of People That Live Near Plant on Basis That Plant Located in Densely Populated Coastal Area W/Predicted Seismic Activity & Inadequate Evacuation Routes.Plant Should Not Be Licensed ML20006A3141990-01-18018 January 1990 Readiness Review.* Discusses Number of Serious Potential Defects in Design & Const of Plant That Need to Be Addressed & Resolved Before Commission Concludes That Reactor Ready to Operate.Supporting Documentation Encl ML20006A2651990-01-17017 January 1990 Requests Time to Read Ltr at 900118 Hearing Re Facility to Express Concerns of Amesbury Religious Society of Friends, Including Serious Safety Issues & Location of Plant.W/ Certificate of Svc ML20006A2601990-01-17017 January 1990 Requests That Encl Ltrs Added to Transcript of 900118 NRC Hearing & Included in Records,Per Telcon.Served on 900123 ML20006A0681990-01-16016 January 1990 Requests Brief Opportunity to Address Commission at 900118 Meeting & Decries NRC Failure to Comply W/Govt in Sunshine Act in Scheduling Meetings on Plant OL Case w/1 Wk Notice ML20006A4231990-01-11011 January 1990 Forwards Town of Essex 890711 Ltr Requesting That Reactor Safety Issues Be Addressed & Resolved Prior to Licensing of Reactor,For Response.W/Certificate of Svc ML20005H1921989-12-15015 December 1989 Requests Addl Info Re NRC Response to Author 890515 Ltr ML19351A6961989-12-0505 December 1989 Forwards Signature Page for Gc Minor Affidavit,Per Commonwealth of Ma Atty General 891201 Filing of Gc Minor & Sc Sholly Joint Affidavit in Support of Intervenors Application for Stay of LBP-89-32 ML19332F9351989-12-0404 December 1989 Forwards Corrected Title Page to 891121 Filing of Necnp Request for Stay of Immediate Effectiveness of LBP-89-32 Pending Resolution of Outstanding Licensing Issues.Original Had Incorrect Caption Directed to Attention of ASLB ML19332D8941989-11-22022 November 1989 Submits That Recipient 891117 Ltr on Commission Response to Senator Glenn Re Having No Communications W/Governor Sununu Re Plant Emergency Planning Insufficient.Fuller Response from Commissioner Roberts Warranted.Svc List Encl ML19332D7911989-11-21021 November 1989 Forwards Original Signature Page to Gc Minor & Sc Sholly 891117 Affidavit & Objection to No Significant Hazards Determination & Request for Hearing on Proposed Amend to Plant Low Power OL ML19332D5601989-11-17017 November 1989 Forwards Intervenors Motion to Reopen Record & Admit late-filed Contention Re Proposed Amend of Facility Ol,Application,For Filing.Original Signature Page to Affidavit Will Be Forwarded ML19354D5341989-11-0808 November 1989 Requests Determination of Commissioner Roberts Intentions,If Any,To Abstain from Voting on Matters Pending Before Commission Re Adquacy of Emergency Planning at Plant Due to Conflict of Interest.Related Info & Svc List Encl ML19325E9801989-11-0101 November 1989 Requests That Author Name Be Placed on Distribution List Re Schedule of Hearing in Alchemie Case.W/Certificate of Svc. Served on 891101 ML19327B7441989-10-21021 October 1989 Expresses Concern Re Financial Status of Util When Judging Ability to Safely Operate Facility.Residents Around Facility Need More than Reasonable Assurance That Operations Will Be Consistent W/Public Health & Safety ML19325F3361989-10-0808 October 1989 Provides Rept of Prolonged Excessive Radiation Readings Taken Near Plant on 890926.Stack & Vent Monitors at Plant Revealed No Abnormal Releases.Concern Expressed Increase of Background Being Injurous to Health.Graphs Encl ML20248D1041989-09-26026 September 1989 Forwards Response to Commission 890822 Order & New England Electric Sys Form 10-Q for Quarter Ending 890630 in Support of Part III of Response Re Insufficient Funding for Operating Plant ML20247Q6781989-09-22022 September 1989 Objects,For Record,Applicant 890920 Motion to Strike Seacoast Anti-Pollution League (Sapl) Response to Aslab 890830 Order.Sapl Response Considered within Framework Intended by Aslab.W/Certificate of Svc ML19353B0281989-09-19019 September 1989 FOIA Request for Info Re Releases of Radiation to Atmosphere from Facility ML20247M0731989-09-18018 September 1989 Forwards Corrected Seacoast Anti-Pollution League 890915 Response in Accordance W/Aslab Order of 890830,making Typo & Grammatical Changes ML20247B5591989-09-0606 September 1989 Forwards Seacoast Anti-Pollution League Comments Re ACRS Seabrook Subcommittee 890817 Meeting.Issues Re Plant Not Fully Functional SPDS & Untested Siren Warning Sys Also Discussed.Related Correspondence ML20247A1071989-09-0606 September 1989 Emergency Planning.* Provides Info Re Problem of Summer Beach Population in Plant Area Resorts Not Being Protected During Radiological Emergency.Related Correspondence ML20246F5431989-08-28028 August 1989 Certification of Vermont Yankee Nuclear Power Corp (Vermont Yankee Nuclear Power Station),Docket 50-271-OLA (Spent Fuel Pool amend),ALAB-919,29 NRC (890726).* Seeks to Address Appeal Board Violations of Precedents.Service List Encl ML20246F5721989-08-23023 August 1989 ACRS Meeting/Seabrook Nuclear Power Plant.* Advises That Seacoast Anti-Pollution League Joins in Commonwealth of Ma Atty General & Requests Reopened ACRS Subcommitee Meeting W/Opportunity to Be Heard.Related Correspondence ML20246J5491989-08-22022 August 1989 Requests That Augmented Insp Team Insp Rept Be Revised to Include Encl Addl Info ML20246E2891989-08-21021 August 1989 Expresses Appreciation for Opportunity to Address ACRS Subcommittee on Facility at 890817 Meeting.Believes ACRS Failure to Provide Licensee W/Timely Notice of Subj Meeting Unfair.Related Correspondence ML20247A1971989-08-11011 August 1989 Forwards Aerial Photos Submitted as Visual Evidence Supporting Town of Essex,Ma Selectmen Contention That Plant Siting Will Contaminate Marshes.Served on 890907 ML20248E0401989-08-0202 August 1989 Emergency Planning Appeal.* Clarifies Understanding Re History of Contentions on Reception Ctrs & Board Rulings on Litigability of Size of EPZ Population Attending Reception,Per 890727 Oral Argument.Supporting Info Encl 1990-09-06 |
Text
.
EhcRioson Clohc Boston Massachusetts 02107 Teder, hone 617 929 2000 December 29, 1986 Donnie Grimsley, Director FREEDOM OF iMORMAlk)N Division of Rules & Records ACT REQUEST U.S. Nuclear Regulatory Commission Washington, D.C. 20555 ZA *[.p q/
[*/
Re: Freedom of Information Act Request
Dear Mr. Grimsley:
Pursuant to the Freedom of Information Act. 5 U.S.C. 552 et, seq., I hereby request that you provide me with copies of the following documents:
All NRC documents relating to the Public Service Co. of New Hampshire's proposed reduction of the emergency planning zone at Seabrook. That would include summaries of meetings with the applicant, discussions with Brookhaven National Laboratory on its review of Seabrook studies and other relevant material.
I would also like any documents on changes to containment that NRC is considering for General Electric plants generally, and to Pilgrim and Vermont Yankee in particular.
s All documents regarding the inspection of Pilgrim I since its shutdown in April.
In the event that the search and reproduction fees involved in complying with my request do not exceed the sum of $25.00, I would be grateful if you would send me copies of the documents requested along with your statement of search and copying charges. In the event that those fees do exceed the sum of $25,00, I would be grateful if you would inform me of the total charges in advance of fulfilling my request.
Dk f0fj4 862229 TYE87-to PDR
.i Mr. Donnie Grimsley December 29, 1986 Page two.
Thank you in advance for your anticipated cooperation in this matter. I.shall look forward to receiving your response our receipt of it.
to this request within 10 days of Si cerely, Larry Tye Globe Staff
(