Monthly Operating Rept for Dec 1986
ML20207P467
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 12/31/1986
From: Watson R, Westmoreland J
CAROLINA POWER & LIGHT CO.
To:
NRC OFFICE OF ADMINISTRATION (ADM)
References
HO-870337-(O), NUDOCS 8701160162
Download: ML20207P467 (4)


Text

- -

OPERATING DATA REPORT DOCKET NO. 050-400 DATE 1/5/87 COMPLETED BY J. H. Westmoreland

-TELEPHONE (919) 362-2597 OPERATING STATUS

1. Unit Name: Shearon Harris Unit 1
2. Reporting Period: December 1986 Notes:
3. Licensed Thermal Power (MWt): 2775 Fuel load completed 11/21/86;
4. Nameplate Rating (Gross MWe): 950 157 Fuel Assemblies are in
5. Design Electrical Rating (Net-MWe):

900 the Reactor Vessel.

6. Maximum Dependable Capacity (Gross-MWe):

950

7. Maximum Dependable Capacity (Net-MWe): 900
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons: N/A
9. Power Level To Which Restricted, If Any (Net-MWe): 0 MWe-Net; Unit Restricted to 5% Thermal Power by NRC License
10. Reasons For Restrictions, If Any:

Operating License Restricted to 5%

Harris Unit 1 is in Start-up/ Power Ascension Test Phase.

This Month Yr.-to-Date Cumulative-

- 11. Hours in Report Period 0

0 0

12. Number Of Hours Reactor Was Critical 0

0 0

13.' Reactor Reserve Shutdown Hours 0

0 0

14. Hours Generator On-Line 0

0 0

15. Unit Reserve Shutdown Hours 0

0 0

16. Gross Thermal Energy Generated.(MWH) 0 0

0

17. Gross Electrical Energy Generated (MWH) 0 0

0

18. Net Electrical Energy Generated (MWH) 0 0

0

19. Unit Service Factor N/A N/A N/A
20. Unit Availability Factor N/A N/A N/A
21. Unit Capacity Factor (Using MDC Net)

N/A N/A N/A

22. Unit Capacity Factor (Using DER Net)

N/A N/A N/A

23. Unit Forced Outage Rate N/A N/A N/A
24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
25. If Shut Down At End Of Report Period, Estimated Date of Startup:
26. Units In Test Status (Prior to Commercial Operation):

Forecast Achieved INITIAL CRITICALITY 12/30/86 1/3/87 INITIAL ELECTRICITY 1/11/87 N/A COMMERCIAL OPERATION 3/06/87 N/A

,i L

CEH086/ attach 3464/1/OS4 8701160162 1B61231 1 )

PDR ADOCK 05000400 l,

m R

PDR

j *CP&L CO..

PLANT PERFORMANCE. DATA. SYSTEM; APPENDIX B - AVERAGE DAILY POWER LEVEL HARRIS UNIT 1

. DOCKET NO. 050-400 COMPLETED BY J. H. WESTMORELAND TELEPHONE-(919)362-2597 DECEMBER 1986 DAY AVG. DAILY POWER LEVEL DAY AVG. DAILY POWER LEVEL (MWE-NET).

(MWE-NET) 1 0

17 0

2 0

18 0

3 0

19 0

4 0

20 0

5'

.0 21 0

6 0

22 0

7 0

23 0

8 0

24 0

9 0

25 0

10 0

26 0

11=

0 27 0

12 0-28 0

13 0

29 0

14 0

30 0

15 0

31 0

16 0

?

1.16 - 8 i

CEH086/ attach 3464/2/OS4

oe UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. -

050-400 UNIT NANE:

' Harris DATE:

1/5/87

.CONPLETED BY:

J. H. Westmoreland REPORT HONTH: December 1986 TELEPHONE:

(919) 362-2597 1

cn3 Licensee a

Cause & Corrective.

E7 "SE Event 5*

Action to No.

Date E5 E

o t$ $

' Report #

84 Prevent Recurrence.

1 ES E

Sfc

$4 ad N

5" E

E*j go b

N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A sw

~

1 2

3 4

F: Forced Reason:

Method:

Exhibit C-Instructions S

Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance or Test 2-Manual Scram.

Entry Sheets for Licensee C-Refueling 3-Automatic Scram.

Event Report (LER) File.

D-Regulatory Restriction 4-Continued (NUREC-0161)

E-Operator Training & License Examination 5-Reduced Load F-Administrative 6-Other 5

C-Operational Error (Explain)

Exhibit I-Same Source H-Other (Explain) s CEH086/ attach 3464/3/054

CP&L Carolina Power & Light Company HARRIS NUCLEAR PROJECT P. O. Box 165 New Hill, North Carolina 27562-January 9, 1987 File Number:

SHF/10-15505 Letter Number: HO-870337 (0)

Document Control Desk United States Nuclear Regulatory Commission Washington, D.C.

20555 HARRIS NUCLEAR PROJECT DEPARTMENT UNIT NO. 1 DOCKET NO. 50-400 LICENSE NO. NPF-53 MONTHLY OPERATIONS REPORT

Dear Sirs:

In accordance with Technical Specifications 6.9.1.5 for the Harris Nuclear Plant, Unit No. 1, Carolina Power & Light Company herewith submits the report of operation statistics and shutdown experience for the month of December 1986.

Very truly yours, s

s R. A. Watson Vice President Harris Nuclear Project MWH/sdg Enclosure cc:

Dr. J. Nelson Grace (NRC)

Messrs. J. M. Taylor (NRC)

G. F. Maxwell (NRC-SHNPP) 9(h MEM/H08703370/ PACE 1/OS1 gh