ML20207N329
| ML20207N329 | |
| Person / Time | |
|---|---|
| Site: | McGuire, Mcguire |
| Issue date: | 09/30/1988 |
| From: | Reavis J, Tucker H DUKE POWER CO. |
| To: | NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM) |
| References | |
| NUDOCS 8810190092 | |
| Download: ML20207N329 (12) | |
Text
l m
CFEFATIN3CATAFEPDFT CCCrEl NG
$0-369 IATE Octeter 14. 1953 OPUATINGSTATU1 CCFFLETEDBY J. A. Feavis TELEFHCNE 704-373-7567
- 1. Unit Nate: McGuire 1
- 2. Reportirg Feriod 3eptester 1, 19ES-Septester 30,1933
- 3. Licensed thereal Feuer IEWt):
3411
- 4. Naseplate Fatirg (Gross FWe):
1305e Notes 6kaseplate Rating
(
- 5. Design Electrical Pating (Net PWe):
!!80 (Eress FWel calculated as
- 6. Manisaa Cependable Capacity (Gross FWe):
1171 1450.000 MVA :.90 power
- 7. fianisus Dependable Capacity (Net ewe):
1129 fatter per Fage ill,
- 8. If Changes Occur in Capacity Fatings (!tess N; ster 3 Through 7) Since last NU$ES-0020.
Peport. Sive Peasons:
- 9. Feuer Level To Which Festricted, If Any (Met MWe):
- 10. Reason For Pestrictier.s, If any t
This Month Yr.-to-Date Cusulathe
- 11. Hours In Reporting Fertod 720.0 6575.0 59'03.0
- 12. Nusber Of Heurs Peacter Was Critica!
720.0 6414.4 433!9.0
- 13. Reactor Peserve Shutdev1 Hcurs
--0--
--0--
--0--
- 14. Hours Generator On-Liri 720.0 6482.3 42325.5 l
- 15. Unit Reserve Shutionn Hcurs
--0--
--0--
--0--
- 16. Gross Thereal Er,ergy Generatad ( m )
2437912 21G5?03 176715492
- 17. Gross Electrical Energy 6ererstef IMI 924456 7319670 43795327
- 18. Net Electrical Erergy Generates ( M )
711877 7!21966 6:797464
- 11. Unit Service Factor 100.0 99.6 71.5
- 20. Unit Availatiility Factor 100.0 99.4 71.5
- 31. Unit Capacity Fatter (Using P;C Net) 97.4 95.9 39.9 j
- 22. Unit Capacity Factor (Ustrg DER Net) 93.2 91.6 59.1
- 23. Unit Forced Outs;e Rate 0.0 1.4 11.4 i
- 24. Shuttens Scheduled Over Nest 6 Months {Ty;e, Cate, and Curation of Esth):
l
__Refuelfng. Ocfaber 11. 1988 - 10 weeks t
- 23. If Shut 0.n At Eri Cf Fe: art Ferled. Est aated Cate of Startups i
- 26. Uitts In felt Status (Prior to Cese rcial 0;erationi:
Ferecast Achieved thlilAL CRii! CAL!!f I
IN!!!al ELEtit!ClfY CC % !AL CF UAi!C4 f
i r
dm s
(
PDR ADOCK O'5000369
',I ( t e
R PDC i
OFERATIN3 DATA REF0FT
.i DOCKri NO 50-369 GN!i McGuire 1 DATE Octeter 14. 1939 COMfLETED BY
.7. A. Renis TELEFHONE 704 373-7567 __
L MMTH-Sesleeber. 1999 1
E AVERASE D4ILY FOUER LEVEL M
AVERASE DA!LY F0WER LEVEL L
(MWiNet!
IMWe-Net) i 1105 17 1099 2
1105 18 1075 3
1107 19 1071 L
4 1112 20 1077 5
1110 El 1102 6
1109 22 1100 i
7' 1110 23 1097 i
l 8
1111 24 1091 t
l 9
1112 25 1097 l
10 till 26 1035 i
r l
11 1114 27 1087 F
12
'112 2B 1027 I
j 13 1117 29 1096 l
16 1113 30 1096 i
15 1103 t
i 16 1113 l
i i
1 i
i e
{
l l
l
[
i t
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.
50-369 UNIT NAME MCGUIRE 1 DATE 10/14/88 REPORT MONTH September 1988 COMPLETED BY J. A.
REAVIS TELEPHONE (704)-373-7567 -
(1)
(2)
(3)
(4)
(5)
R MET-E HOD T
A OF LICENSE N
Y S
SHUT EVENT SYS-CAUSE AND CORRECTIVE O
P DURATION O
DOWN REPORT TEM COMPONENT ACTION TO DATE E
HOURS N
R/X NO.
CODE CODE PREVENT RECURRENCE 31-p 88-9-17 S
B HA VALVEX HIGH PRESSURE HEATER BYFASS VALVE CF-75 CLOSED FOR TURBINE ACCEPTANCE TEST 1)
(2)
(3)
(4)
F Forced Reason:
Method:
Eshibit G - Instructions S Scheduled A-Equipment Failure (Explain) 1-Manual i;. Preparation of Data B-Maintenance or test 2-Manual Scram Entry Sheets For Licensee C-Refueling 3-Automatic Scram Event Report (LER)
D-Regulatory Restriction 4-Other (Explain)
File (NUREG-Ol61)
E-Operator Training & License Examination F-Administrative (5)
G-Operator Error (Explain)
Exhibit I - Same Source H-Other (Explain)
DOCKET NO:
50-369' UNIT:
McGuire 1 f
DATE:
10/14/88 NARRATIVE
SUMMARY
Month: September, 1988 At McGuire Unit 1 began the month of September operating at 100% full power.
y 1350 on 09/17, power was reduced to 95% power to conduct a Turbine Acceptance Test. The unit was retur-
- to 100% power at 0236 on 09/21. where it operated for the remainder of the month.
4
~/ <
)
i
,L-o
(
MONTilLY REFUEL,ING INFORMATION REQUEST l
r 1.
Facility name: McGuire, Unit 1 s.
2.
Scheduled t.wat refueling shutdown: October, 1988 3.
Scheduled restart to11owing refueling:
December, 1988 4.
Will 'refvoling or resumption of operation thereaf ter require.i technical specification change or other license amendment? No If yes, what will these be?
If no, has reload design and core configuration been reviewed by Safety Review Committ'Jo regarding unreviewed safety questions? N/A I
S.
Scheduled date(s) for sutvnitting proposed licensing action and supporting information: N3 6.
Important licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, algnificant changes in design or new operating procedures).
7.
Number of fuel assemblies (a) in the core:
193 (b) in tre spent fuel pool 293 8.
Present licensed fuel pool capacity:
1463 Size of requested or planned increase 9.
Projected date of last refueling which casi be accommodated by present licensed capacity:
August, 2010 t
i l
I l
DUKE POWER COMPANY DATE:
October 14, 1988 l
l
[
l Name of
Contact:
J. A. Reavis Phone:
704-373-7567 l
i l
f l
i l
l
. - ~ -
t 0FERAi!N3DATAFIFORT IWEi AD 50-370 CATE Octeter 14 1989 Cs*PAi!NS STA70$
CO?.FLETED BY L A. Feavis TELEFFONE 704-373-7567
- 1. Unit Naset McGuire 2
- 2. Reporting Peried: Septesber 1, 1959 Cepteater 30,1959 3.LicensedTheraalPower(rdt):
341!
- 4. Wastplate Rating (6ress FWe):
13354 N:tts eNaseplate Batteg j
- 5. tesign Electrical Pating (Net P'de):
!!90 (6ross PWel calculated as
- 6. Maxisus rependable Capacity (6 toss Fde):
1171 1450.000 MVA
.90 pc er
- 7. r,atisaa Dependable Capacity tNet MWelt 1129 factor per Page ill,
- 6. If Changes Occur in Capachy itatings (Itees Naber 3 Through 7) Since tast NUREB-0020.
Repert. Give Reasons:
- 9. Power Level To Which Restricted, if Any (Net MWelt
- 10. Reason For Festrictions, If anyt This Mer.th Yr.-to-Date Cusulsthe
- 11. Pours 13 Reportiet erled 720,0 6575.0 40199.0 F
- 12. Nasher Of Hours Fesctor Was Critical 720.0 5104.6 29550.4
- 13. Reactor Feierte Shutdown Stours
--0--
--0--
--0--
- 14. M rs 6ererator On-Line 72).0 5031.7 EGB59.1
- 15. Unit Feserve Shutd:en h rs
--0--
--0--
--0--
16, 6ross Ther641 Energy 6ecerated (RWH) 2447331 1e620571 9?B70524
- 17. Gross Electrica) Ecergy Generated ( M )
S47571 37721C9 22547912
- 18. Net Electrical Energy Generated ( m )
819021 5542757 31478759
- 19. Unit Service Factor 100.0 76.5 71.9
- 20.UnitAvailabilityFactor 14.0 76.5 71.0
- 21. LNit Capacity Factor (Usira NC het) 100.6 74.7 67.6
- 22. thit Capacity factor (L; sing IER Net) 96.3 71.4 66,4
- 23. Unit Forced Catage Rate 0.0 1.3 12.8
- 24. SSstdenn !detaled Over West 6 Ponths (Type, late, and Duratien of Each):
None
- 25. If Shut Ecun At End Of Report Peried. Estisated Cate of Startup:
- 25. Wits in Test Status (Frier to (c.naercial C;eratien):
Fcrecast A:hieved IN!!!AL CR!ilCALITy 1%ITIAL ELECTRICITY CC"?EECIAL 08ERATICi
OPERAi!NGDATAREFCRT C0trET NO 5>370 UNIT Mc hire 2 DATEOcteber 14. 1988 COMFtETED If L A. Feavis TELEPHONE 704-37?-7567 i
'PONTM Sentreber,1989 QA.1 AVEP.ASE DA!Lf F04iER LEVEL M
WitRASE DA!LY F0WER LEVEL 4
(RWe-Net)
(PWe-Net) 1130 17 1139 2
1131 18 1120 3
1134 19 1139 l
6 1137 20 1161 5
1135 21 1139 6
1132 22 1131 l
1 1132 23 1139 6
1135 24 1139 s
9 11?9 25
!!36 i
)
1 10
!!39 26 11?5 11 1160 27 1131 12 1140 29 1137 13 1141 29 11?6 I
to 1139 33 1135 15 1136 16 1137
)
i l
i f
L.-.--..
UNIT SHUTDO'a*NS AND POWER REDUCTIONS DOCKET No.50-37G UNIT NAME MCGUIRE 2 DATE 10/14/88 REPORT MONTH September 1988 COMPLETED BY J.
A.
REAVIS TELEPHONE (704)-373-7567 -
(1)
(2)
(3)
(4)
(5)
R MET-E HOD T
A OF LICENSS N
Y S
SHUT EVENT SYS-CAUSE AND CORRECTIVE O
P DURATION O
DOWN REPORT TEM CCMPONENT ACTION TO DATE E
HOURS N
R/X NO.
CODE CODE PREVENT RECURRENCE ZZ ZZZZZZ DISPATCHER REQUEST 24-p 88-9-18 S
F
?
)1)
(2)
(3)
(4)
F Forced Reason:
Method:
Exhibit G - Instructions S Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance or test 2-Manual Scram Entry Sheets For Licensee i C-Refueling 3-Automatic Scram Event Report (LER) i D-Regulatory Restriction 4-Other (Explain)
File (NUREG-0161)
E-Operator Training & License Examination F-Administrative (5)
G-Operator Error (Explain)
Exhibit I - Same Source H-Other (Explain)
o 4
DOCKET NO:
50-370 UNIT:
McGuire 2 l
DATE:
10/14/88 NARRATIVE
SUMMARY
Month:
September, 1988 McGuire Unit 2 began the mc'ath of September operating at 100% full power. On 09/18 the unit reduced powet to 92% from 0353 to 0727 at the Dispatcher's requoct. The unit then operated at 100% power for the remainder of the month.
k n
9 k
4 9
+
...r.
-c
-,--,r.,_-
,,--y
~..-,y-
MONTHLY REFUELING INFORMATION REQUEST 1.
Facility name: McGuire. Unit 2 2.
Scheduled next refueling shutdown: July, 1989 3.
Scheduled restart following refueling:
September, 1989 4.
Will refueling or tesumption of operation thereafter require a technical specification change or other license amendment? No If yes, what will these be?
If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions? N/A 5.
Scheduled date(s) for submitting proposed licensing action and supporting information: N/A 6.
Important licensing considerations (new or different design or supplier, unroviewed design or performance analysis methods, significant changes in design or nr.w operating procedures).
7.
Number of fuel assemblies (a) in the : ore: 193 (b) in the :;=nt. fuel pool 518 8.
Present licensed fuci pool capacity:
1463 Size of requested or planned increase 9.
Projected date of last refueling which can be accommodated by present licensed capacity: Augunt. 2010 s
DUKE POWER COMPANY DATE:
October 14, 1988 Name of
Contact:
J. A. Reavis Phone 704-373-7567
7-McGUIRE NUCLEAR STATION MONTHLY OPERATING STATUS REPORT r
1.
Personnel Exposure For the month of August, no individual (s) exceeded 10 percent of their allowable annual radiation dose limit.
2.
The total station liquid release for August has been compared with the Technical Specifications maximum annual dose comitment and was less than 10 percent of this limit.
The total station gaseous release for August has been compared with the Technical Specifications maximum annual dose comitment and was
'7 less than 10 percent of this limit.
I 4
L d
h s
(
i a
i i
i t
t I
i i
I
11 I
Duke 1%ntCompaQy Hu 11 To.m PO &tt.U198 fice PresiJent Charlotte N C 28212
& clear Productiva (7011173 4U1
.L DUKEPOWER October 14, 1988 U. S. Nuclear Regulatory Comission Attention: Document Centrol Desk Washington, D. C.
20555 Re McGuire Nuclear Station Docket No. 50-369 and 50-370 Dear Sir Please find attached information concerning the performance and operating status of the McGuire Nuclear Station for the month of September, 19P8.
Very truly yours, llal B. Tucker SFRPT. JAR /lcs Attachment xc Dr. J. Nelson Grace American Nuclear Insurers Regional Administrator / Region II c/o Dottie Sherman, ANI 1.ibrary U. S. Nuclear Regulatory Coenission The Exchange Suite 245 l
101 Marietta Street, NW, Suite 2000
?.70 Farmington Avenue Atlanta, Georgia 30323
!armington, CT 06032 Mr. Phli Ross INPC Records Center U. S. Nuclear Regulatory Cocnission Suite 1500 MNBB-5715 1100 Circle 75 Parkway Washington, D. C.
20555 Atlanta, Georgia 30323 Mr. Darl llood, Project Manager Hr. Richard G. Oehl, NE-44 Office of Nuclear Reactor Regulation U. S. Department of Energy U. S. Nuclear Regulatory Cocnission 19901 Germantown Road Washington, D. C.
20555 Cormantown, Maryland 20874 i
Hr. Robert G. Rogers Mr. P. K. Van Doorn Nuclear Assurance Corporation NRC Resident Inspector 6251 Crooked Creek Road McGuire Nuclear Station Norcross, Georgia 30092 g
'