Forwards Operational Team Insp Rept 50-354/86-52 on 861020- 31 & Notice of Violation.Mgt Attention Drawn to Reduction in Alarming Overhead Annunciators in Control Room & Need for Continued Improvement in Maint & Access to Plant Areas
ML20207N131
Person / Time
Site: Hope Creek PSEG icon.png
Issue date: 01/05/1987
From: Kane W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Corbin McNeil
Public Service Enterprise Group
Shared Package
ML20207N133 List:
References
NUDOCS 8701140002
Download: ML20207N131 (2)


See also: IR 05000354/1986052

Text

\' \

'-

,

1

,

t5J)4N198'

Docket No. 50-354

Public Service Electric & Gas Company

ATTN: Mr. C. A. McNeill, Jr.

Vice President - Nuclear

Post Office Box 236

Hancocks Bridge, New Jersey 08038

.

Gentlemen:

Subject: Inspection No. 50-354/86-52

This refers to the operational team inspection, led by Mr. L. Norrholm of this

office, on October 20-31, 1986, at Hope Creek Generating Station, of activities

authorized by NRC License No. NPF-57 and to the discussion of our findings held

by Mr. Norrholm with you and members of your staff at the conclusion of the

inspection.

Areas examined during this inspection are described in the NRC Region I In-

spection Report which is enclosed with this letter.

The purpose of this inspection was to assess the facility's operational effec-

tiveness, as it progresses from the startup test phase to normal operations, in

relation to operational, maintenance, surveillance, quality assurance, safety

review, and management activities. This was accomplished by reviewing adminis-

trative programs and procedures, interviewing personnel, touring the facility,

and observing on going activities.

Based on the results of this inspection, it appears that one of your activities

was not conducted in full compliance with NRC requirements, as set forth in the

Notice of Violation, enclosed herewith as Appendix A. This violation has been

categorized by Severity Level in accordance with the General Statement of

Policy and Procedure for NRC Enforcement Actions, 10 CFR part 2, Appendix C

(Enforcement Policy 1986). You are required to respond to this letter and in

preparing your response, you should follow the instructions in Appendix A.

In addition, several areas have been characterized as program strengths or weak-

nesses and are discussed in detail in the enclosed report. In particular, four

issues raised during the inspection warrant continued management attention.

These issues are: reduction in the number of alarming overhead annunciators in

the control room, continued maintenance of control room records and logs to

accurately reflect plant equipment conditions, continued improvement in opera-

tor accessibility to plant areas, and, continued upgrade in the quality and

completeness of safety evaluations. Additional details are provided in the

Inspection Summary of the attached report. We request that you address these

concerns with respect to their potential impact on plant operations and

respond within thirty (30) days of receipt of this letter, stating actions

OFFICIAL RECORD COPY IR HC 86-52 - 0001.0.0

n701140002 870105 12/22/86

PDR ADOCK 05000354

g PDR OlN \

. . ._ -.

.

b-

w"-

Public Service Electric & Gas 2

g M lbu -

taken or planned. This submittal is not subject to the clearance procedures of

the Office of Management and Budget as required by the Paperwork Reduction Act

of 1980, PL 96-511.

In summary, we have concluded that adequate comprehensive management controls

have been established and implemented to support full power operation.

Your cooperation is appreciated.

Sincerely,

ginal. signed by a

u..

William F. Kane, Director

Division of Reactor Projects

Enclosures:

1. Appendix A, Notice of Violation

2. NRC Inspection Report 50-354/86-52

cc w/ enc 1:

P. R. H. Landrieu, Vice President - Engineering (Newark)

R. S. Salvesen, General Manager, Hope Creek Operations

A. E. Giardino, Manager, Station Quality Assurance

R. L. Mitt 1, General Manager, Nuclear Assurance and Regulation

W. H. Hirst, Manager, Joint Generation Projects Department, Atlantic

Electric Company

L. A. Reiter, General Manager - Licensing and Reliability

Rebecca A. Green, Bureau of Radiation Protection

Public Document Room (PDR)

Local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

NRC Resident Inspector

State of New Jersey

bcc w/ encl:

Region I Docket Room (with concurrences)

Management Assistant, DRMA (w/o encl)

DRP Section Chief

Robert J. Bores, DRSS

1m/emw/mm C 1

12/Q/'86 12/12/86 12/p/86 12/$/86

0FFICIAL RECORD COPY IR HC 86-52 - 0002.0.0

12/22/86

_- - - _ _ - - .- .._