Forwards Safety Insp Rept 50-289/88-18 on 880716-0827 & Notice of Violation.Improvement Needed in Upgrading & Implementing Facility Procedures & Work Instructions
ML20207M238
Person / Time
Site: Crane Constellation icon.png
Issue date: 10/12/1988
From: Bettenhausen L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Hukill H
GENERAL PUBLIC UTILITIES CORP.
Shared Package
ML20207M246 List:
References
NUDOCS 8810180196
Download: ML20207M238 (2)


See also: IR 05000289/1988018

Text

--

.

'A

.

00T 121983

docket No. 50-289

GPU Nuclear Corporation

ATIN:

Mr. H. D. Hukill

Vice President and Director, TMI-l

P. O. Box 480

Middletown, Pennsylvania

17057

Gentlemen:

Subject:

Inspection Report No. 50-289/88-18

p

During the period from July 16 to August 27, 1988, members of NRC Region I staff

conducted routine safety inspections at your facilit/. We documented the results

of that inspection in the enclosed report. After the conclusion of the inspection

period on September 1, 1988, Mr. A. Sidnara of my staff summarized the inspection

findings with you and other members of your staff.

This report includes two apparent violations of NRC requirements as described in

Appendix A.

Violation A of the Appendix deals with a technical specification

violation associated with exceeding pressurizer level and temperature limits during

a low pressure injection surveillance test.

The corrective actions identified in

your Licensee Event Report for this violation are satisfactory and no additional

response is required.

Violation B addresses failure to proper'v change work in-

structions for torquing pressurizer relief valve tailpipe support bolts.

You are

required to respond to the second violation as instructed.

The overall planning, management, and control of the 7R refueling outage resulted

in successful completion of the outage ahead of the schedule.

The deficiencies

identified in the details of 1he report do not indicate any major problem areas.

However, some improvement is needed in upgrading and implementing f acility proce-

dures and work instructions.

Your cooperation in these matters is appreciated.

Sincerely,

ORMiliti smhED BY

LEE H. BETTENHAUSEN

Lee H. Bettenhausen, Chief

Projects Branch No. 1

Division of Reactor Projects

Enclosures:

1.

Appendix A, Notice of Violation

2.

NRC Region ! Inspection Report No. 50-289/83-18

0FFICIAL RECORD COPY

DL50-239/88-18 - 0001.0.0

y\\

10/03/S3

8810180196 88101-

l

{DR

ADOR 050003sq

FDC

- _ ____ _____

.

,.S

..

. . ,

,

GPU Nuclear Corporation

2

00T I 21988

cc w/encis:

T. G. Broughton, Operations and Maintenance Director, THI-1

C. W. Smyth, THI-1 Licensing Manager

R. J. McGoey, Manager, PWR Licensing

E. L. Blake, Jr.

TMI Alert

Susquehanna Valley Alliance

Pubite Document Room (POR)

Local Public Document Room (LPOR)

Nuclear Safety Information Center (NSIC)

NRC Resident Inspector

Commonwealth of Pennsylvania

tec w/encls:

Region 1 Docket Room (with concurrences)

Management Assistant, ORMA, RI (w/o enc 1)

L. Bettenhausen, DRP Branch Chief, RI

C. Cowgill, DRP Section Chief, RI

R. Hernan, PM, NRR/P014

K. Abraham, GPA (RI)

Robert J. Bores, DRSS, RI

R. Conte, RI

0 Johnson, RI

T. Moslak, RI

A. Sidpara, RI

RI:QR

RI: 0R,P

RI:0RP

RI RP

jyd k

.#p*-

/9/ fj,

ASidpara/cph

RConte

CCowgfil

n usen

6

10/3/88

y

hj

sc))/y,w

/W/27

0FFICIAL RECORD COPY

DL50-289/83-18 - 0002.0.0

10/03/88