Text
--
.
'A
.
00T 121983
docket No. 50-289
GPU Nuclear Corporation
ATIN:
Mr. H. D. Hukill
Vice President and Director, TMI-l
P. O. Box 480
Middletown, Pennsylvania
17057
Gentlemen:
Subject:
Inspection Report No. 50-289/88-18
p
During the period from July 16 to August 27, 1988, members of NRC Region I staff
conducted routine safety inspections at your facilit/. We documented the results
of that inspection in the enclosed report. After the conclusion of the inspection
period on September 1, 1988, Mr. A. Sidnara of my staff summarized the inspection
findings with you and other members of your staff.
This report includes two apparent violations of NRC requirements as described in
Appendix A.
Violation A of the Appendix deals with a technical specification
violation associated with exceeding pressurizer level and temperature limits during
a low pressure injection surveillance test.
The corrective actions identified in
your Licensee Event Report for this violation are satisfactory and no additional
response is required.
Violation B addresses failure to proper'v change work in-
structions for torquing pressurizer relief valve tailpipe support bolts.
You are
required to respond to the second violation as instructed.
The overall planning, management, and control of the 7R refueling outage resulted
in successful completion of the outage ahead of the schedule.
The deficiencies
identified in the details of 1he report do not indicate any major problem areas.
However, some improvement is needed in upgrading and implementing f acility proce-
dures and work instructions.
Your cooperation in these matters is appreciated.
Sincerely,
ORMiliti smhED BY
LEE H. BETTENHAUSEN
Lee H. Bettenhausen, Chief
Projects Branch No. 1
Division of Reactor Projects
Enclosures:
1.
Appendix A, Notice of Violation
2.
NRC Region ! Inspection Report No. 50-289/83-18
0FFICIAL RECORD COPY
DL50-239/88-18 - 0001.0.0
y\\
10/03/S3
8810180196 88101-
l
{DR
ADOR 050003sq
FDC
- _ ____ _____
.
,.S
..
. . ,
,
GPU Nuclear Corporation
2
00T I 21988
cc w/encis:
T. G. Broughton, Operations and Maintenance Director, THI-1
C. W. Smyth, THI-1 Licensing Manager
R. J. McGoey, Manager, PWR Licensing
E. L. Blake, Jr.
TMI Alert
Susquehanna Valley Alliance
Pubite Document Room (POR)
Local Public Document Room (LPOR)
Nuclear Safety Information Center (NSIC)
NRC Resident Inspector
Commonwealth of Pennsylvania
tec w/encls:
Region 1 Docket Room (with concurrences)
Management Assistant, ORMA, RI (w/o enc 1)
L. Bettenhausen, DRP Branch Chief, RI
C. Cowgill, DRP Section Chief, RI
R. Hernan, PM, NRR/P014
K. Abraham, GPA (RI)
Robert J. Bores, DRSS, RI
R. Conte, RI
0 Johnson, RI
T. Moslak, RI
A. Sidpara, RI
RI:QR
RI: 0R,P
RI:0RP
RI RP
jyd k
.#p*-
/9/ fj,
ASidpara/cph
RConte
CCowgfil
n usen
6
10/3/88
y
hj
sc))/y,w
/W/27
0FFICIAL RECORD COPY
DL50-289/83-18 - 0002.0.0
10/03/88