Forwards Corrected SALP Rept 50-247/85-98 for Aug 1985 - Jul 1986,per 861121 Mgt Meeting.Overall Assessment of Operation Indicates Improvement in Mgt Effectiveness.List of Meeting Attendees Also Encl
ML20207M236
Person / Time
Site: Indian Point Entergy icon.png
Issue date: 01/08/1987
From: Murley T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Selman M
CONSOLIDATED EDISON CO. OF NEW YORK, INC.
Shared Package
ML20207M241 List:
References
NUDOCS 8701130125
Download: ML20207M236 (4)


See also: IR 05000247/1985098

Text

3, .

3

08 JAN 1987

Docket No. 50-247

Consolidated Edison Company of

New York, Inc.

ATTN: Mr. Murray Selman

Vice President, Nuclear Power

Indian Point Station

Broadway and Bleakley Avenue

Buchanan, New York 10511

Gentlemen:

Subject: SYSTEMATIC ASSESSMENT OF LICENSEE PERFORMANCE (SALP) REPORT FOR

INDIAN POINT UNIT 2

This refers to the NRC assessment of Indian Point Station, Unit 2, conducted by

this office and subsequently discussed with your staff at a meeting on

November 21, 1986. The NRC Region I SALP Report, as corrected, is provided as

an enclosure to this letter. A list of attendees at the above management

meeting is also enclosed.

We understand that you have elected not to provide a formal response to the

SALP Board Report which was forwarded to you on November 17, 1986. Therefore,

the corrections made to this report are only editorial in nature.

Our overall assessment of the operation of Indian Point Unit 2 is that your

management effectiveness has improved. However, we believe additional atten-

tion is needed to lessen the number of challenges to your safety systems. Also,

your efforts to prioritize the backlog of maintenance activities according to

risk significance should be continued.

In accordance with 10 CFR 2.790(a), a copy of this letter and its enclosures

will be placed in the NRC Public Document Room. No reply to this letter is

required. Your actions in response to the NRC Systematic Assessment of

Licensee Performance will be reviewed during future inspections of your

licensed activities.

'

8701130125 870108

PDR ADOCK 05000247

G PDR

OFFICIAL RECORD COPY SALP IP2 85-98 - 0001.0.0

I2/22/86

f 6 +o %

~\

.9

Consolidated Edison Company 2

of New York, Inc.

g }gg7

Your cooperation is appreciated.

Sincerely,

Original signed by

Thocac E. Murley, '

Thomas E. Murley

Regional Administrator

Enclosures:

1. List of Attendees - SALP Management Meeting, dated November-21, 1986

2. NRC Region I Systematic Assessment of Licensee Performance, Indian Point

Station - Unit 2 (with corrections)

cc w/ encl:

Robert Spring, Manager, Regulatory Affairs

P. Kokolakis, Director, Nuclear Licensing i

Brent L. Brandenburg, Assistant General Counsel

Walter Stein, Secretary - NFSC

Chairman Zech '

Commissioner Asselstine

Commissioner Bernthal

Commissioner Carr .,

Commissioner Roberts '

INPO, Records Center

Public Document Room (PDR)

Local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

NRC Resident Inspector

State of New York

i

I

! 0FFICIAL RECCRD COPY SALP IP2 85-98 - 0001.1.0

12/17/86

..-- - . .

. - _ . - _ _ - . _ _ . _ _

f

J

Consolidated Edison Company 3

of New York, Inc. 08 JAN 1987

bec w/ encl:

Region I Docket Room (with concurrences)

Management Assistant, DRMA (w/o encl)

DRP Section Chief

Robert J. Bores, DRSS

J. Taylor, IE

H. Denton, NRR

T. Murley, RI

Division Directors

Branch Chiefs

D. Holody

PA0 (2)

J. Allan

Management Meeting Attendees

RD R DRP RP

Summers /klm Nor olm lins e

12//f/86 12/[ /86 1 19/86 12/p/86 12/24/86

.

MW

A t  % riey p

12/ 86 qE]/f

0FFICIAL RECORD COPY SALP IP2 85-98 - 0001.2.0

12/17/86

,

ENCLOSURE 1

LIST OF ATTENDEES

SALP MANAGEMENT MEETING - NOVEMBER 21, 1986

1. Consolidated Edison Company of New York:

A. Hauspurg,.CEO

E. McGrath, Executive Vice President

M. Selman, Vice President - Nuclear Power

G. Groscup, Vice President - Engineering

P. Zarakas, Vice President - Project Management

T. McGovern, Assistant Vice President - Corporate Security

M. Lee, General Manager, Technical Support

M. Miele, General Manager, Environmental Health and Safety

J. Basile, General Manager, Nuclear Power Generation

A. Budnick, General Manager, Administrative Services

T. Allaway, Director, Corporate Security

B. Marguglio, Manager, NPQA

D. Wall, Director, QA/QC

J. E11wanger, Licensing Engineer

2. NRC:

W. Kane, Director, Division of Reactor Projects

W. Johnston, Deputy Director, Division of Reactor Safety

P. Eselgroth, Chief, Projects Branch No. 2, DRP

L. Norrholm, Chief, Reactor Projects Section No. 2B, DRP

L. Rossbach, Senior Resident Inspector

P. Kelley, Resident Inspector

M. Slosson, Licensing Project Manager, NRR

- - _ _ , , , _ ___ , , _ . _ - _ . , _ . - .

- - - - - _