Amend 123 to License DPR-35,revising License to Permit Fire Barriers to Have Rating of Less than 3 H Per License Condition 3.F
ML20207L961
Person / Time
Site: Pilgrim
Issue date: 10/13/1988
From: Wessman R
Office of Nuclear Reactor Regulation
To:
Shared Package
ML20207L965 List:
References
NUDOCS 8810180038
Download: ML20207L961 (2)


Text

-.

~,.

\\

f[ geno o,

UNITED $TATES

{

'c g

NUCLEAR REGULATORY COMMISSION 5

t WASHING TON. D. C. 206S6

,e BOSTON EDISON COMPANY DOCKET NO. 50-293 PILGRIM NUCLEAR POWER STATION AMENDMENT TO FACILITY OPERATlHG lICENE Anendment No.123 License No. DPR-35 1.

The Nuclear Regulatory Connission (the Comission) has found that:

l A.

The application for amendnient by Boston Edison Company (the licensee) dated August 6, 1988, complies with the standards and reouirements of the Atomic Energy Act of 1954, as amended (the Act)

I and the Comission's rules and regulations set forth in 10 CFR Chapter I; L.

The facility will operate in conformity with the application, thr provisions of the Act, and the rules and regulations of the Corr:ission; C.

There is reasonable assurance (i) that the activities authorized i

by this cmendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Corsnission's regulations; 1

D.

The issuance nf this amendment will not be fnimical to the coramon g

defense and serurity or

  • ,0 the h?alth and safety of the public; and E.

The issuance c/ tais diacod1ent is in xcw/ dance with 10 CFR Part 51 of the Comission's repuietir,cs and all applicable requirenents

[

have been satisfied.

l 4

?.

Accordi gty, Parrgrgh J,r of Facility 0parating License No. OPR-35 l

is hereby arrn.ird to utd et, fo?lon.

3.F Fire,_Pretect On l

f The licensee may proceed with &nd is required to camplete the modifications identified in Paragraphs 3.1.1 through I

3.1.19 of the NRC's Fire Protection Safety Evaluation (SE),

I dated December 21, 1978 for the f acility.

The Safety i

Evaluation is supplemented by Amendment No.123 dated l

October 13, 1988, as it releses to fire barrier ratings, j

These riedifications will be completed in accordance with the schedule in Table 3.1.

l I

I G91018CO38 891013 PDR ADOCK 05000293 l

P FDC

2 i

In addition, the licensee shall submit the additional information identifiec in Table 3.2 of this SE in accordance with the schedule contained therein.

In the event these j

dates for submittal cannot be met, the licensee shall submit a report, explaining the circumstances, together j

with a revised schedule.

The licensee is required to implement the administrative controls identified in Section 6 of the SE.

The administrative j

controls shall be in effect by December 31, 1978.

3.

This license amendment is effective as of the date of its issuance, i

l FOR THE NUCLEAR REGULATORY COMMISSION j

1 f

1 Richard H. Wessman, Director Project Directorate I-3 Division of Reactor Projects I/II l

f Date af b: 1ance: October 13, 1983 4