Forwards Insp Rept 50-424/86-68 on 860616-20 & 0707-18 Re Readiness Review Module 18A, Hvac. HVAC Sys Acceptable & Complies W/Regulatory Requirements,Except for Items Identified in Rept
ML20207L825
Person / Time
Site: Vogtle Southern Nuclear icon.png
Issue date: 01/05/1987
From: Grace J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: John Miller
GEORGIA POWER CO.
Shared Package
ML20207L827 List:
References
NUDOCS 8701120359
Download: ML20207L825 (3)


See also: IR 05000424/1986068

Text

,

e

.

JAN 0 51987

Docket No. 50-424

License No. CPPR-108 .

G rgia Power Company

N: Mr. J. H. Miller, Jr.

President

P. O. Box 4545

Atlanta, GA 30302

Gentlemen:

SUBJECT: NRC REVIEW 0F V0GTLE READINESS REVIEWS MODULE N0. 18A, HEATING,

VENTILATION AND AIR CONDITIONING - REPORT NO. 424/86-68

The NRC has completed a detailed review, inspection, and verification of the

subject Module which you submitted to the NRC on November 1,1985. Periodic

inspections were conducted at the Vogtle site and the resultant findings were

discussed with members of your staff at the conclusion of these inspections.

Technical reviews were conducted primarily in NRC Bethesda offices and the

findings from these reviews have also been discussed with your staff.

Areas contained in the module, which were reviewed, examined, and verified, are

identified in the enclosed report. Within these areas, the inspection and

verification consisted of selected examinations of procedures and representative

records, discussions with personnel, observations of activities in progress, and

review of your licensing commitments.

The results of Module No.18A reviews and inspections are summarized into the

categories of deficiencies, violations, deviations inspector followup, and

unresolved items. Your attention is invited to these matters which will be

pursued during future licensing reviews and inspections.

Based upon the NRC review and inspection of those activities identified in the

module, we have determined that heating ventilation and air conditioning systems

at Vogtle Unit No. I are acceptable and complies with applicable regulatory

requirements with the exception of those items or areas identified in the report.

This decision is based on information currently available to the inspectors and

reviewers . Should information subsequently become available which was not

considered during this review or which conflicts with earlier information, it

will be evaluated to determine what effect it may have on the above conclusion.

8701120359 870105

PDR

O ADOCK 05000424

PDR

'\\ ZEol

--- --. -

_ _

-- ,

M

-

.

.

JAN 0 51987

Georgia Power Company 2

Should you have any questions concerning this letter, please contact us.

Sincerely,

Co hx ATI

&c J. Nelson Grace

Regional Administrator

Enclosure:

Inspection Report No. 50-424/86-68

[ccw/ encl: Senior Vice President

. P. O'Reilly,

Nuclear Operations

g E. Conway, Senior Vice President &

Jroject Director

W. O. Foster, Vice President, Project

Support

Z D. Rice, Vice President, Project

Engineering

LR. H. Pinson, Vice President, Project

fonstruction

(f. T. Beckham, Vice President &

General Manager - Operations

[JV. A. Thomas, Vice President,

Licensing

i S. Read, General Manager,

Quality Assurance

% W. Hayes, Vogtle Quality

Assurance Manager

/ C. Ramsey, Manager -

adiness Review

. B. Bockhold, General Manager,

Nuclear Operations

g Gucwa, Manager, Nuclear Safety

and Licensing

4. H. Googe, Project

, Jonstruction Manager

Hi. D. Groover, Quality

Assurance Site Manager -

Gonstruction

7. A. Bailey, Project Licensing

Manager

g F. Trowbridge, Esq., Shaw,

Pittman, Potts and Trowbridge

(cc w/encls cont'd - see page 3)

,._

3

-

.

.

JAtl 0 51987

Georgia Power Company 3

(cp w/ encl cont'd)

7. W. Churchill, Esq., Shaw,

) Pittman, Potts and Tronbridge

y L. Blake, Jr., Esq., Shaw,

. Jittman, Potts and Trowbridge

W. E. Joiner, Troutman, Sanders,

Lockerman and Ashmore'

pH G. Ledbetter, Commissioner,

Department of Human Resources

LC/ H. Badger, Office of Planning

and Budget

g Kirkland, III, Counsel,

Office of the Consumer's Utility

/ Council

(4). C. Teper, Georgians Against

.. )(uclear Energy

LK. B. Margulies, Esq., Chairman,

Atomic Safety and Licensing Board

Janel

(Er. O. H. Paris, Administrative Judge

Atomic Safety and Licensing Board

anel

. A. Linenberger, Jr., Administrative Judge

Atomic Safety and Licensing Board

Panel

B. P. Garde, Citizens Clinic, Director

Government Accountability Project

bec w/ encl:

tE. Reis, 0GC

'W. M. Hill, IE

W. Miller, NRR

M rach, OGC

  1. Sinkule, RII

C Christnot, RII

W C Resident Inspector

Document Control Desk

State of Georgia

I

I h RII. RII 4 RII RII

RI

WE r J ake

W

ARHerdt

Q

Pan iera

hVS

MSinkuleXrnst

Q

( /8 14/86 1 dab /86 10/0/86 15/,g/86 12/71/86

2.>

RII g RII

VBrownlee rwa TMNovak BGrimes EChristenbury

11/ /86 19/ /86

Id/p/86 9 86 19/ /86

1

L L t I