Forwards Safety Insp Repts 50-266/86-21 & 50-301/86-18 on 860926-1211 & Notice of Violation
ML20207L798
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 01/07/1987
From: Hehl C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Fay C
WISCONSIN ELECTRIC POWER CO.
Shared Package
ML20207L803 List:
References
NUDOCS 8701120352
Download: ML20207L798 (2)


See also: IR 05000266/1986021

Text

__

.-

z, :

JAN 6 71937

Docket No. 50-266

Docket No.' 50-301

~ Wisconsin Electric Power' Company

ATTN:

Mr. C. W. Fay'

Vice President

Nuclear' Power Department

231 West Michigan, Room 308

Milwaukee, WI 53201

Gentlemen:

,

~

This refers to the routine safety inspection conducted by Messrs. R. Mendez

and F..A. Maura cf this office on September 26 through December 11, 1986, of

activities at Point Beach Power Station, Units 1 and 2, authorized by Operating

Licenses No. DRP-24 and No. DRP-27 and to the discussion of our findings with

Mr. J. Zach at the conclusion of the inspection.

-(

The enclosed copy of our inspection report identifies areas examined during

i

the inspection. -Within these areas, the inspection consisted of a selective

' examination of procedures and representative records, observations, and

{

interviews.with personnel.

During this inspection, certain of your activities appeared to be in violation

of NRC requirements, as specified in the enclosed Notice.

A written response

is required.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy

- of this letter and the enclosed inspection report will be placed in the

NRC Public Docunient Room.

The responses directed by this letter and the accompanying Notice are not

subject to the clearance procedures of the Office of Management and Budget as

required by!the Paperwork Reduction Act of 1980, PL 96-511.

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

C 7 IIchl

Ok66

Meinal Signed BT

0

D

Charles W. Hehl, Chief

Operations Branch

<

!

Enclosures:

Inspection Reports

No. 50-266/86021(DRS); and

No. 50-301/86018(DRS)

See Attached Distribution

rib

RIII

RIII

R

R I

N%t

Q

Chip

W

.

Mendez/mnj

Maura

Ring

De ayette

Hehl

W[

\\

jfo l (&

,

_

_ _ _ __ ___ - - - - _

9

- e.

Wisconsin Electric Power Company

2

JAN 0 71987

Distribution

- cc'w/ enclosure:

J. J. Zach, Plant Manager

DCS/RSB (RIDS)

Licensing Fee Management Branch

Resident Inspector, RIII

- John J. Duffy, Chief

Boiler Section

Mary Lou Munts, Chairperson

Wisconsin Public Service

Commission

Collette Blum-Meister (SLO),

WI Div. of Emergency Government

.

@