Rev 0 to Emergency Operating Procedure,Validation Procedure
ML20207L703
Person / Time
Site: Big Rock Point File:Consumers Energy icon.png
Issue date: 12/30/1986
From:
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To:
Shared Package
ML20207L682 List:
References
PROC-861230-02, NUDOCS 8701120321
Download: ML20207L703 (12)


Text

r-ATT'ACHMEh"I 3 Consumers Power Company Big Rock Point Plant Docket 50-155 EMERGENCY OPERATING PROCEDURE VALIDATION PROCEDURE December 30, 1986 8701120321 861230 PDR ADOCK 050 5

t p

4 11 Pages Rev 0 NL01-RRF12A-PCP

BIG ROCK POINT NUCLEAR PLANT EMERGENCY OPERATION PROCEDURE VALIDATION PROCEDURE 1

EMERGENCY OPERATING PROCEDURE VALIDATION PROCEDURE l

l TABLE OF CONTENTS Section g

1.0 Purpose and Scope

1 2.0 References..............................................

1 3.0 Attachments.............................................

1 4.0 Definitions..............................................I 5.0 Responsibilities........................................

2 6.0 Process for E0P Va11dation..............................

2 7.0 Documentation...........................................

4 i

Rev 0 NL01-RRF12A-PGP

BIG ROCK POINT NUCLEAR PLANT EMERGENCY OPERATION PROCEDURE VALIDATION PROCEDURE

1. 0.

PURPOSE AND SCOPE To guide the administrative process used in validation of the Emergency Operating Procedures (EOPs). Upon completion of the E0P validation program process, a thorough evaluation of the E0Ps for usability and operational correctness will have been conducted.

Deviations in the E0Ps will have been identified, evaluated, and resolved.

This plan provides guidance for E0P validation utilizing the table-top and walk-through methods. It only applies to E0P validation prior to implementation of the E0Ps.

2.0 REFERENCES

2.1 Emergency Operating Procedures Validation Guideline (INPO 83-006) 3.0 ATTACHMENTS 3.1 - E0P Validation Form 3.2 - Table-Top / Walk-Through Scenario Form' 3.3 - Discrepancy Sheet 3.4 - Checklist for Table-Top / Walk-Through Methods of Validation 4.0 DEFINITIONS 4.1 Emergency Operating Procedures (EOPs) - Plant procedures directing operator actions necessary to mitigate consequences of transients and accidents that cause plant parameters to exceed reactor protection setpoints, engineered safety feature setpoints, or other appropriate technical limits.

4.2 Emergency Operating Procedure Guidelines (EPGs) - Guidelines that provide technical bases for the development of E0Ps.

I 4.3 E0P Source Documents - Documents or records upon which E0Ps are based.

4.4 E0P Validation - The evaluation performed to determine that the actions specified in the E0P can be followed by trained operators to manage the emergency conditions in the plant.

j l.

4.5 Scenario - A structural plan of parameter and plant symptom changes that provide operating cues for the conduct of assessment.

1 Rev 0 NL01-RRF12A-PGP

]

E BIG ROCK POINT NUCLEAR PLANT EMERGENCY OPERATION PROCEDURE VALIDATION PROCEDURE 4.6 Table-Top Validation - Method of validation whereby personnel explain and/or discuss procedure action steps for an observer /

reviewer in response to a scenario or as part of an actual industry operating experience review.

4.7 Walk-Through Validation - Method of validation whereby control room operators conduct a step-by-step ersetment of their actions during a scenario for an observer / review team without carrying out the actual control functions. May also include use of a simulator with manipulation of controls and observation of instrumentation.

5.0 RESPONSIBILITIES 5.1 E0P Project Manager - The E0P Project Manager shall be responsible for the following:

A.

Reviewing and approving E0P validation assessments and any discrepancies / resolutions forwarded to him by the E0P Validation and Verification Coordinator.

B.

Resolving any discrepancies which can not be resolved by the E0P Validation and Verification Coordinator.

C.

Ensuring that the E0Ps have received the proper technical, administrative and safety evaluations.

D.

Forwarding recommended E0Ps to the Plant Review Committee.

5.2 E0P Validation and Verification Coordinator - The E0P Validation and Verification Coordinator shall be responsible for the following:

A.

Managing the validation program and ensuring its smooth coordination with the E0P training program conducted by the Nuclear Operations Training Department (NOTD).

B.

Selecting the validation method or methods.

C.

Reviewing E0P validation assessments and any discrepancies /

resolutions forwarded to him by observer / review personnel.

D.

Resolving any discrepancies identified by observer / review personnel, E0P Project Manager, or the Plant Review Committee.

E.

Forwarding recommended resolutions and procedure changes to the E0P Project Manger.

2 Rev 0 NL01-RRF12A-PGP

r BIG ROCK POINT NUCLEAR PLANT EMERGENCY OPERATION PROCEDURE VALIDATION PROCEDURE 6.0 PROCESS FOR E0P VALIDATION The E0P validation process can be described by the three phases of preparation, assessment, and resolution.

6.1 Preparation - The validation process will use the applicable evaluation criteria presented in Table 1, and the scenario to be used will be recorded on the appropriate scenario form.

(Table-Top / Walk-Through Scenario Form, Attachment 2 or similar form).

The designated observer / reviewer will be responsible for the following:

A.

Using and completing the E0P Validation Form (Attachment 1) or similar form.

B.

Reviewing the scope of the validation designated by the operations supervisor or his representative.

C.

Developing or modifying scenarios to support the scope of validating and filling out the Table-Top / Walk-Through Scenario Form (Attachment 2) or similar form.

D.

Modifying / selecting the developed evaluation criteria to support the scope of validation.

E.

Selecting operators that are representative of the training level expected of all the operators.

F.

Selecting the needed resources.

6.2 Assessment - The designated observer / reviewer will perform the following duties:

A.

Brief the operator on the scope of validation and how the assessment will be conducted.

B.

Follow the developed or modified scenario by first giving the plant initial conditions and then give the changing plant parameters as talking or walking through the procedures.

C.

Stop the talk-through or walk-through assessment for discussion of any identified discrepancies.

D.

Conduct a debriefing with the operators as soon as possible after each walk-through assessment, using the following sequence:

brief the participants on the purpose and objectives for debriefing 3

Rev 0 NL01-RRF12A-PGP

BIG ROCK POINT NUCLEAR PLANT EMERGENCY OPERATION PROCEDURE VALIDATION PROCEDURE have operators present problems and discrepancies which they had identified during assessment have operators provide possible reasons for problems present other problems and discrepancies identified during assessment have operators describe possible reasons for the other problems i

summarize the findings of the debriefing for the operators.

E.

Record discrepancies and comments on the Discrepancy Sheet (Attachment 3) or similar form.

6.3 Resolution - The designated observer / reviewer will* perform the following duties:

A.

Review comments and discrepancies.

B.

Describe any proposed resolutions on the Discrepancy Sheet (Attachment 3) or similar form.

C.

Submit the validation package to the E0P Validation and Verification Coordinator.

The E0P Validation and Verification Coordinator will perform the following duties:

A.

Review proposed resolutions with appropriate staff.

B.

Select resolutions for incorporation in the E0Ps.

i C.

Forward the revised E0Ps to the E0P Project Manager for i

review.

7.0 DOCUMENTATION The documented items needed to provide a history of the validation program are the completed Validation Form. Scenario Form (s) if needed, and Discrepancy Sheet (s) if needed. These items will be maintained as a validation package in the Document i

Control Center (DCC) in accordance with Big Rock Manual, Volume i

1, Chapter 11.

l j

All E0P validation documentation which has been approved by the PRC is to be submitted to DCC by the E0P Project Manager.

i 4

Rev 0 NL01-RRF12A-PGP

BIG ROCK POINT NUCLEAR PLANT EHERGENCY GPERATING PROCEDURE VALIDATION PROCEDURE E0P VALIDATION FORM Page of EOP

Title:

E0P Number:

Revision:

Scope of Validation:

Validation Mehtod or Methods to be Used:

Evaluation Criterie Used:

Designated Observer / Reviewer (s):

Preparation Completed on _,,

By:

Assessment Completed on By:

Operator (s) Involved:

Qualification:

(SRO, RO, Other) i

[

i i

I i

Resolution Completed on By:

i l

E0P Validation and Verification Coordinator Review Dater E0P Project Manager Review Dater i

t i

I Rev 0 NLO1-RRF12C-PGP 4

1

,e e..

---c=-.-,_

.-,-,---.-,,,m.-.-+-----e-..--

.--..,e

= - -.

,---,.--ve-mw--r--,-.----,

,,,m--m---

BIG ROCK POINT NUCLEAR PLANT EMERGENCY OPERATING PROCEDURE VALIDATION PROCEDURE TABLE-TOP / WALK-THROUGH SCENARIO FORM Procedure No:

Title:

Date:

Purpose:

Scenario

Description:

Initial Plant Conditions:

Rev 0 NL01-RRF12D-PCP

BIG ROCK POINT NUCLEAR PLANT EMERGENCY CPERATING PROCEDURE VALIDATION PROCEDURE DISCREPANCY SHEET NUMBER E0P:

REV STEP NUMBER:

DISCREPANCY:

EVALUATOR:

DATE:

RESOLUTION:

E0P VALIDATION AND VERIFICATION COORDINATOR:

DATE:

E0P PROJECT MANAGER DATE:

REV 0 NLO1-RRF12E-PGP

?

I BIG ROCK POINT NUCLEAR PLANT EMERGENCY OPERATING PROCEDURE Page 1 of 3 VALIDATION PROCEDURE TABLE 1 EVALUATION CRITERIA 3

Applicable to:

I.

USABILITY T-T W-T A.

LEVEL OF DETAIL X

X 1.

Is there sufficient information to perform the specified actions at each step?

X X

2.

Are the alternatives adequately described at each decision point?

X X

3.

Are the labeling, abbreviations, and location information as provided in the E0P sufficient to enable the operator to find the needed equipment?

X X

4.

Is the E0P missing information needed to manage the emergency condition?

X X

5.

Are the cont!ngency actions sufficient to address the symptoms?

X X

6.

Are the titler and numbers sufficiently descriptive to enable the operator to find referenced and branched procedures?

B.

UNDERSTANDABILITY X

X 1.

Is the E0P easy to read?

X X

2.

Are the figures and tables easy to read with accuracy?

X X

3.

Can the values on figures and charts be easily determined?

Legend:

X - applicable to the validation method 0 - not applicable to the validation method T-T - table-top validation method W-T - walk-through validation method Rev 0 NL01-RRF12B-PGP

r-BIG ROCK POINT NUCLEAR PLANT EMERGENCY OPERATING PROCEDURE Page 2 of 3 VALIDATION PROCEDURE T-T W-T X

X 4.

Are caution and note statements readily understandable?

X X

5.

Are the E0P steps readily understandable?

II.

OPERATIONAL CORRECTNESS A.

PLANT COMPATIBILITY 0

X 1.

Can the actions specified in the procedure be performed in the designated sequence?

X X

2.

Are there alternate success paths that are not included in the E0Ps?

O X

3.

Can the information from the plant instrumen-tation be obtained, as specified by the E0P?

O O

4.

Are the plant symptoms specified by the E0P adequate to enable the operator to select the applicable E0P?

O O

5.

Are the E0P entry conditions appropriate for the plant symptoms displayed to the operator?

O X

6.

Is information or equipment not specified in the E0P required to accomplish the task?

O O

7.

Do the plant responses agree with the E0P basis?

O X

8.

Are the instrument readings and tolerances stated in the E0P consistent with the instrument values displayed on the instruments?

O X

9.

Is the E0P physically compatible with the work situation (too bulky to hold, binding i

would not allow them to lay flat in work space, no place to lay the E0Ps down to use)?

O X

10. Are the instrument readings and tolerances specified by the E0P for remotely located l

instruments accurate?

i i

l Rev 0 NLO1-RRF12B-PGP l

L

r BIG ROCK POINT NL' CLEAR PLANT EMERGENCY OPERATING PROCEDURE Page 3 of 3 VALIDATION PROCEDURE T-T W-T B.

OPERATOR COMPATIBILITY 0

X 1.

If time intervals are specified, can the procedure action steps be performed on the plant within or at the designated time intervals?

O X

2.

Can the procedure action steps be performed by the operating shift?

O X

3.

If specific actions are assigned to individual shift personnel, does the E0P adequately aid I

in the coordination of actions among shift personnel where necessary?

O X

4.

Can the operating shift follow the designated action step sequences?

O X

5.

Can the particular steps or sets of steps be readily located when required?

O X

6.

Can procedure exit point be returned to without omitting steps when raquired?

X X

7.

Can procedure branches be entered at the correct point?

X X

8.

Are E0P exit points specified adequately?

l l

t i

I Rev 0

(

NL01-RRF12B-PGP

.-