ML20207L041
| ML20207L041 | |
| Person / Time | |
|---|---|
| Site: | Vogtle |
| Issue date: | 07/16/1986 |
| From: | Brownlee V NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | John Miller GEORGIA POWER CO. |
| Shared Package | |
| ML20207L043 | List: |
| References | |
| NUDOCS 8607300175 | |
| Download: ML20207L041 (3) | |
See also: IR 05000424/1986057
Text
1
l
,
IJ(
.
,
JUL 161996
Docket No. 50-424
License No. CPPR-108
Georgia Power Company
VATTN: Mr. J. H. Miller, Jr.
President
P. O. Box 4545
Atlanta, GA 30302
Gentlemen:
SUBJECT: NRC INSPECTION REPORT N0. 50-424/86-57
This refers to the Nuclear Regulatory Commission (NRC) inspection conducted by
Larry Nicholson on June 23 - 27, 1986.
The inspection included a review of
activities authorized for your Vogtle 1 facility.
At the conclusion of the
inspection, the findings were discussed with those members of your staff
identified in the enclosed inspection report.
Areas examined during the inspection are identified in the report. Within these
areas, the inspection consisted of selective examinations of procedures and
representative records, interviews with personnel, and observation of activities
in progress.
Within the scope of the inspection, no violations or deviations were identified.
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,
Title 10, Code of Federal Regulations, a copy of this letter and its enclosure
will be placed in the NRC Public Document Room.
Should you have any questions concerning this letter, please contact us.
Sincerely,
l5l
Virg il L. Brownlee, Chief
Reactor Projects Branch 3
Division of Reactor Projects
i
Enclosure:
NRC Inspection Report
cc w/ enc 1:
(See page 2)
1
8607300175 860716
ADOCK 05000424
G
l
7e </
L
'[
I
s
3
-.
JUL 161MS
.
.
Georgia Power Company
2
cc w/ enc 1:
f.P.O'Reilly,SeniorVicePresident,
Nuclear Operations
@.'E.Conway,SeniorVicePresident&
Project Director
LAI. O. Foster, Vice President, Project
Support
% 0. Rice, Vice President, Projcct
Engineering
lAf. H. Pinson, Vice President, Project
~ Construction
J . T. Beckham, Vice President &
General Manager - Operations
vR. A. Thomas, Vice President,
Licensing
J. S. Read, General Manager,
(2. Quality Assurance
W. Hayes, Vogtle Quality
Assurance Manager
v W. C. Ramsey, Manager -
Readiness Review
vG. B. Bockhold, General Manager,
Nuclear Operations
t. Gucwa, Manager, Nuclear Safety
p
and Licensing
/M. H. Googe, Project
Construction Manager
f.D. Groover, Quality
Assurance Site Manager -
, Construction
VJ. A. Bailey, Project Licensing
l
Manager
l
p8'. F. Trowbridge, Esq. , Shaw,
,Pittman, Potts and Trowbridge
'
W . W. Churchill, Esq., Shaw,
Pittman, Potts and Trowbridge
vE. L. Blake, Jr., Esq., Shaw,
Pittman, Potts and Trowbridge
L4. E. Joiner, Troutman, Sanders,
Lockerman and Ashmore
\\(. G. Ledbetter, Comissioner,
Department of Human Resources
k H. Badger, Office of Planning
l
(.andBudget
Kirkland, III, Counsel,
Office of the Consumer's Utility
Council
l
D. C. Teper, Georgians Against
Nuclear Energy
(cc w/ encl cont'd - see page 3)
u-
,
-
,
JUL 161986
.
Georgia Power Company
3
(cc w/ encl cont'd)
f B. Margulies, Esq., Chairman,
Atomic Safety and Licensing Board
Panel
v Dr. O. H. Paris, Administrative Judge
Atomic Safety and Licensing Board
Panel
f. A. Linenberger, Jr., Administrative Judge
Atomic Safety and Licensing Board
Panel
). P. Garde, Citizens Clinic, Director
Government Accountability Project
i
bec w/ encl:
i
LE. Reis. GS0
vW. M. Hill, IE
N. Miller, NRR
fW. Brach, ED0
J[f. Sinkule, RII
Christnot RII
@RCResidentInspector
Document Control Desk
State of Georgia
rig
RII
RI
LENicholson:er
ARHerdt
07/{/86
07
86
07/jd/86
'/
/
.