qqd
.
DEC 2 91986
Docket Nos. 50-424, 50-425
License Nos. CPPR-108, CPPR-109
Georgia, Power Company
ATTN:@ President
r. J. H. Miller, Jr.
P. O. Box 4545
Atlanta, GA 30302
Eientlemen:
S JBJECT: NRC INSPECTION REPORT NOS. 50-424/86-129 AND 50-425/86-59
This refers to the Nuclear Regulatory Commission (NRC) inspection conducted by
W. P. Kleincarge on December 1-5, 1986.
The inspection included a review of
activities authorized. for your Vogtle facility.
At the conclusion of the
l
inspection, the findings were discussed with those members of your staff
I
identified in the enclosed inspection report.
.
Areas examined during the inspection are identified in the report. Within these
areas, the inspection consisted of selective examinations of procedures and
representative records, interviews with personnel, and observation of activities
in progress.
dithin the scope of the inspection, no violations or deviations were identified.
Your attention is invited to unresolved item identified in the inspection report.
This matter will be pursued during future inspections.
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,
Title 10, Code of Federal Regulations, a copy of this letter and its enclosure
will be placed in the NRC Public Document Room.
Should you have any questions concerning this letter, please contact us.
Sincerely,
% k . PAhs
M Virgil L. Brownlee, Chief
Reactor Projects Branch 3
Division of Reactor Projects
Enclosure:
NRC Inspection Report
cc w/ enc 1:
(See page 2)
8701090507 861229
ADOOK 05000424
o
PDR.
.I {
I col
m .
-
.
DEC 2 9 5
Georgia Power Company
2
w/ encl:
VJ. P. O'Reilly, Senior Vice President
/ Nuclear Operations
v'R. E. Conway, Senior Vice President &
/ roject Director
P
i
v0. O. Foster, Vice President, Project
/ Support
vP. D. Rice, Vice President, Project
J. Engineering
H. Pinson, Vice President, Project
Construction
J. T. Beckham, Vice President,
Plant Hatch
/R.A. Thomas,VicePresident,
Licensing
/D.S. Read,GeneralManager,
[.QualityAssurance
W. Hayes, Vogtle Quality
i
d.AssuranceManager
C. Ramsey, Manager -
,
Readiness Review
/G. B. Bockhold, General Manager,
,
Nuclear Operations
f
M.. Gucwa, Manager, Nuclear Safety
,
and Licensing
/M.H.Googe, Project
Construction Manager
/
y E. D. Groover, Quality
ssurance Site Manager -
Construction
. A. Bailey, Project Licensing
/ Manager
VG. F. Trowbridge, Esq., Shaw,
j Pittman, Potts and Trowbridge
J . W. Churchill, Esq., Shaw,
I.Pittman,PottsandTrowbridge
L. Blake, Jr. , Esq. , Shaw,
Pittman, Potts and Trowbridge
/J.E. Joiner,Troutman, Sanders,
j Lockerman and Ashmore
/J. G. Ledbetter, Commissioner,
Department of Human Resources
/C.H. Badger,OfficeofPlanning
j and Budget
v/D. Kirkland, III, Counsel,
Office of the Consumer's Utility
/ Council
VD. Feig, Georgians Against
Nuclear Energy
(cc w/enci cont'd - see page 3)
--
,
.
-
, .
DEC 2 91986
Georgia Power Company
3
c/w/ enc 1 cont'd
,
W. B. Margulies, Esq., Chairman,
Atomic Safety and Licensing Board
/ anel
P
vDr. O. H. Paris, Administrative Judge
' Atomic Safety and Licensing Board
Panel
. A. Linenberger, Jr., Administrative Judge
Atomic Safety and Licensing Board
>
Panel
- )ccw/ encl:
'
v . Reis, OGC
M. Hill, IE
. Miller, NRR
. Brach, ED0
Sinkule, RII
. Christnot,.RII
RC Resident Inspector
Document Control Desk
State of Georgia
t
1
4
l
4
!
\\
\\
gp)
R'l
RK
RI
R
{plake
He dt
MVSinkule
Wis
o e:
V
{S/86
12/ /86
_12/J /86
12/g
6
-. .
.-
-
-.
_
_ . - .