ML20207K008

From kanterella
Jump to navigation Jump to search
Public Version of Revised Emergency Plan Implementing Procedures,Including Rev 0 to HP/O/B/1009/04 Re Environ Monitoring for Emergency Conditions within 10 Mile Radius.W/ 860107 Release Memo
ML20207K008
Person / Time
Site: Catawba  Duke Energy icon.png
Issue date: 11/12/1986
From:
DUKE POWER CO.
To:
Shared Package
ML20207K004 List:
References
PROC-861112-02, NUDOCS 8701090124
Download: ML20207K008 (87)


Text

.. ..., ' ~

..a r ;. :;~ '- '

.* : U . - p.. ,.:e ^. . ~ . t

< [*_.--. .Y.plL y,(hl,{YjQd; ', , ' ~ , O) _ -?hf ' 54'

- ~ . ,

. . $.z .

) ', ~

/

Form 34731 (3-84) (1) ID No. BP/0/B/1009/04

,m DUKE POWER COMPANY -

Change (s) ' 0 to

( PROCEDURE PROCESS RECORD D incorporated PR_EPARATION (2) STATION caemuba (3) PROCEDURE TITLE Environmental Monitoring for. Emergency Conditions Within the Ten Mile Radius of Catawba Nuclear Station (4) PREPARED BY #8> E'*#I C DATE I8 l18 III.

. (5) REVIEWED BY DATE # A Cross. Disciplinary Review By N/R (6) TEMPORARY APPROVAL (If Necessary)

By (SRO) Date

, By M

  • Cate (7) APPROVED BY W DATE /

/ / /

(8) MISCELLANEOUS

~

( Reviewed / Approved By Date

\'

Reviewed / Approved By Date CO_MPLETION , .

(9) DATE(S) PERFORMED (10) PROCEDURE COMPLETION VERIFICATION O Yes O N/A Check lists and/or blanks properly initialed, signed, osted or filled in N/A or N/R, as appropriate?

O Yes O N/A Listed enclosures attached?

O Yes O N/A Data sheets attached, completed, dated and signed?

O Yes O N/A Charts, graphs, etc. attached and properly dated, identified and marked?

  • O Yes O N/A Acceptance crtteria met?

1 VERIFIED BY DATE (11) PROCEDURE COMPLETION APPROVED l DATE i (12) REMARKS l

l m.-

y";,m : : g:

.--_..,,1

)

G701090124 061208 PDR ADOCK 05000413 F PDR

(, . .. _' , , .c

~;;,.

a ; :.- ~ . .  :

x--

r.;sy$,=l..p-ML%

y r Y %, ;-.; ,." ;;. f r;nnt*-G

-I

& c.o

%,; ." - ~ D.D .k .;C

  • Y
  • C .* * .r. 9 7

~

.. . & . ' : c ._. .~ ....-.

t i

+ .

.f~~ -

HP/0/B/1009/04 DUKE POWER COMPANY CATAWBA NUCLEAR STATION - - - --

ENVIRONMENTAL MONITORING FOR EMERGENCY CONDITIONS WITHIN THE - ---

TEN MILE RADIUS OF CATAWBA NUCLEAR STATION

~

~

.___ I . 0 PURPOSE'

.n.--

-- ~~

To provide a method for identifying gaseous plumes or liquid effluent, and- . - . -

~ ~ ~ ~ ~

obtaining field data indicative of the radiation exposure to the general ---

public following'a suspected uncontrolled release of radioactivity. This procedure shall also be implemented by the Crisis Management Center once

- -~

~it is activated.

2.0 REFERENCES

. ~2.1 HP/0/B/1000/06 Emergency Equipment Functional Check and Inventory

2. 2 - HP/0/B/1002/12 Radiological Environmental Sample Collection

~

2.3

~-

HP/0/B/1003/05 Operating and Calibration Procedure: Eberline Model PIC-6A Portable Ion Chamber r --

2.4 HP/0/B/1003/12 Operating and Calibration Procedure Eberline Model -

-- ({ ' E-520 Portable Beta-Gamma Geiger Counter

. ~. 2.5~ ~HP/0/B/1003/17~0peration and Calibration Procedure: Canberra Series

- 10 Portable MCA 2.6 HP/0/B/1003/31 Operation and Calibration: Eberline Model E140N -

Portable Count Rate Meter ,

~

2.7 HP/0/B/1009/16 Distribution of Potassius Iodide Tablets in the Event of a Radiciodine Release 2.8 HP/0/B/1009/19 Emergency Radio System Operations, Maintenance and i Communications '

3.0 LIMITS AND PRECAUTIONS 3.1 The Field Monitoring Teams (FMT) should park vehicles completely off the road when sampling and use vehicle emergency flashers while stopped.

- - ~ - ~ ~

3.2 ' Five (5) FMTs and one (1) helicopter team (if necessary) shall be formed as follows:

- - ^

Team Call Signs,~ Number of Members Transportation Alpha 2 Land Vehicle l Bravo 2 Land Vehicle Charlie 2 Land Vehicle Delta 2 Land Vehicle Echo 1 Helicopter Foxtrot 2 (Onsite Team) n '

} [' - ._.

..&,g

[h_.f,hf*ll&. m Q~f__ },\'.

_: f.' __

[Y .

d HP/0/B/1009/04, Page 2 of 7 ~

( 3.3-s Each FMT shall use particulate masks and protective clothing whenever activity justifies it or when directed by the Field Monitcring Coordinator (FMC).

3.4 If the team members are expected to be exposed to I-131 in excess of

~

70 MPC (6.1 x 10 7 pCi/ml), and directed by the FMC, each team member should ingest a tablet of potassium iodide per Reference 2.7.

3.5 Environmental sampling during emergency conditions shall not -

replace, but rather supplement normal environmental monitoring.

3.6 Minimum labeling requirements'for all samples are as follows:

3.6.1 Date and time.

3.6.2 Location.

l 3.6.3 Volume of the sample (if applicable).

3.6.4 Name of person sampling.

3.7 Each FMT shall maintain open radio communications with the FMC per

~

Reference 2.8. If a radio becomes inoperable telephoue the following:

3.7.1 FMC in the TSC at 831-8182 (Lake Wylie/ Charlotte).

f.*

( '

3.7.2 Station PBX Operator at 831-2282 (Lake Wylie/ Charlotte). .

861-0331 (Gaston County), 324-3128 (Rock Hill / Fort Mill),

and request ext. 2598 for FMC.

3.8 If any equipment becomes inoperable, notify the FMC and wait for '

further instructions.

3.9 Annual training in the use of this procedure and the associated equip-ment and instrumentation shall be conducted and documented on TSR-10.

3.10 Portable MCA's shall be picked up at the Health Physics Counting Room

- when directed by the FMC or Reserve Personnel / Personnel Monitoring (RPPM) ,

Leader. Ensure that the dewars are adequately filled per Reference 2.5.

i 3.11 Ensure that portable survey instrumentation is on and monitored during transport to all sampling locations.

3.12 When returning kits to the Emergency Kit Storage Room, perform an equipment inventory check using the Environmental Survey Kit Checklist (Reference 2.1). Note deviations and forward to the Respiratory / Instrument Calibration Supervisor.

$ e

%g l

Q .. y : . ;c;..c. -x, :,.p~ m:.xg.;;gn:q:gggymygy:,q...p-i: , ' c a gn.; ..i: ;7 , .ny, : :c;;y:

- : . .v:" mm.pn.ww:.~:r* Key > -

e- .

3 .

HP/0/B/1009/04 Page 3 of 7 -

t 4.0 PROCEDURE 4.1 Activation 4.1.1 ,Upon notification and. assembly, FMT Foxtrot will obtain a portable radio, a site map and portable survey instruments from the EP Instrument Issue Area.

4.1.1.1 Team Foxtrot will then~be dispatched, as per -

~~ ._,.~ ~ ~ ~ the FMC, up to the exclusion area boundary fenha at the estimated plume location.

~

. . . . 4 4.1.2

~ ~

The remaining FMT members shall:

4.1.2.1 Report to the Emergency Kit Storage Room in the

, Temporary Administration Building to get Environmental Survey Rits. .

4.1.2.2 Ensure the tamper seal on the Environmental Survey kits have not been broken and inventory any that have (Reference 2.1).

4.1.2.3 Immediately place batteries in the portable survey instruments and make a cosmunication check with FMC, using the portable FM radios and the radio in the vans.

4.1.2.3.1 Perform a battery check and survey s

the area for higher than background radiation levels.

, 4.1.2.3.2 Report any 4.bove background radiation levels to the FMC. As advised by the FMC, move to a low background area to complete source checks.

'.. 4.1.2.4 Source check survey instruments and portable MCA

. , for proper operation (References 2.3, 2.4, 2.5,

, 2.6) if applicable. -

4

~

4.1.2.4.1 Turn the E140N Count Rate Meter on -

and continuously monitor the

~

audible. signal while locating and i

tracking the plume. -!

,  : I 4.1.2.5 Don TLD, high and low range dosimetry, and fill t I

out dose cards.

  • 4.1.2.6 Ensure the Portable Power Generator is .

operational and the gas can is fully fueled .

j ,. , (Reference 2.1).

I

]Jf.fp'W' .

J{. g (({ .

j { .'f.

i "i  ; 'g , _ ~ ,, ,

~~ ~ ,

HP/0/B/1009/04

. Page 4 of 7

  • g(

, 4.1.2.7 Obtain emergency vehicles as directed in -2

Enclosure 5.9.

, 4.-l.2.8 Each FMT will be' dispatched as per the FMC.

._ 4.1.2.9 The radio operator in the TSC shall complete Radio Operators Log Field Monitoring Data Sheet (Enclosure 5.4), with the appropriate

~

information.

4.2 Locating and Tracking the Plume

, . 4.2.1 At the assigned survey point, the FNr shall' perform a -

general area Beta-Gamma survey. This method should be used to locate center and width of plume.

e

4.2.1.1 Record date, time, location and dose rate (ar/hr) on the Field Monitorihg Data Sheet

. (Enclosure 5.5).

4.2.2 If survey results are less than or equal to expected background, call in the results to the DiC and wait for .

i further instructions.

4.2.3 If survey results are greater than background, take i

protective actions as necessary. Then, if directed, take an air sample (volume should be > lo s al) equipped with a Silver Zeolite Cartridge and particulate filter.

4.2.3.1 Insert cartridge with arrow pointing in.

t .

4.2.3.2 Insert filter paper with smooth side facing out.

4.2.3.3 Calculate required sample time per Enclosure 5.6.

4.2.3.4 Place the electrical generator (gas powered or mounted generator in the vans) in service and start the air sampler ensuring the sampler is i approximately two feet above the ground or

, higher.

4.2.3.4.1 Gas power generators should be kept from wet areas and handle with electrical gloves contained in the environmental monitoring kit.

t 4.2.3.4.2 Mounted electrical generation located in the emergency vans should be operate 4 as follows to.

t

  • 4.2.3.4.2.1 Ensure the engine

. of the van is running before energizing the generator.

j[' %N#!e WNieFdetssist.nEZ4.WWFMisfiN@27-Nb'

! - T~

HP/0/B/1009/,04

, Page 5 of 7

, (_ - -

A. -

4.2.3.4.2.2 Ensure the engine 2

is running gontinuously if the generator is being used.

4.2.3.4.3 Ensure all sampling equipment is

.I .

_ a . .-

off the. roadway for safety

- . reasons. .

- '- ~

' , 4.2.3.5 When air sampling is complete, place the Silver ,, 7.

2eolite Cartridge in a thin plastic. bag " "

(baggie) for analysis. For transporting 5or storage place this into a labeled " zip-lock"

__ bag.

4.2.3.6 Place filter in a separate poly bag and label.

j 4.2.3.7 As directed by the FMC, transport the completed sample to a vehicle that is carrying a Canberra Series - 10 Portable NCA for analysis per

. Reference 2.5.

4.2.3.8 Ensure the correct information is ann'otated on the Field Monitoring Team Work Sheet for Determining Iodine Activity (Enclosure 5.7).

.,~ . ,

4.2.3.9 Wait for further instructions from the FMC.

4.3 Special Sampling, as directed:

'4.3.1 When sampling away from the emergency vehicles and no one '  !

. is present to monitor the radio do the following:

4.3.1.1 For the emergency vans, ensure the exterior speaker is on and volume turned up. Switch

' located near the radio monitor on the right side of the drivers seat.

4.3.1.2 For other Station vehicle or personnel vehicles, carry the portamoble radio to the sampling location.

4.3.2 All sampling outside of Auxiliary, Service and Turbine Buildings should be done in conjunction with Operations

, . Support Center (OSC) personnel.

4.3.3 Take smears and place them in separate poly bags, label and retain for later analysis. -

4.3.4 Count smears on E140N and record on Field Monitoring Data Sheet (Enclosure 5.5). Call in results to FMC.

i 4.3.5 Collect water sample (s) as per Reference 2.2 and retain for later analysis. .

I

~ . _ _ . _ . . .

..*q

- :. ; a., *u. /, {s

. ..c.$j..z:. ,: .n'y'.w ,.,..gg.a:wyw

? n '}_49"%g.Q g g.pgggQ,.Q pm.w%),q&g&Jll yga .

.t-r r. w. w. ;c. g;e. .; ~ - s

. ,n -gv- g ., ~. w p, n . -

t;.. .* -

- -~ -.

l

. . I a , , i 6

HP/0/B/1009/04

  • l Page 6 of 7 l 1

/

(- '4.3.6 Place TLD's in the environment as per Reference 2.2.

9 4.3.7 Retrieve and replace air sample (s) and/or TLD's that are already located in the environment as per Reference 2.2.

Locations are listed in Enclosure 5.1. Retaisi sample (s) for later analysis. -

4'.3.8 Collect broad leaf vegetation sample (s) as per Reference 2.2 and retain for later analysis. .

i NOTE: Leaves in the shape of needles, i.e. pine or

, spruce needles, are not considered to be broad

( leaf vegetation.

4.3.9 Collect shoreline sediment. sample (s) as per Reference 2.2
. and retain for later analysis.

t I

, 4.3.10 Collect milk sample (s) as per Reference 2.2 and retain i for later analysis. Locations are lis'ted in Sample Enclosure 5.2.

4.4 Contamination Control Considerations 4.4.1 Don Anti-Cs inside the vehicle before leaving the vehicle. , ,

( .

(, 4.4:2 Paper Anti-Cs should.bg used over cloth Anti-Cs and

. ,I discarded before re-entering the vehicle. -

4.4.3 sOnce a release has occurred, vehicle windows should be '

} . closed with ventil'ation off (unless filtration or recirculation is available on the ventilation) to minimize contamination until the plume area is identified.

r Depending on weather conditions (extreme he'at or cold),

j this may not be possible.

4. 5' Turnover i

i 4.5.1 Each FMT shall be relieved as directed by the FMC.

~

4.5.2 Inform the relief Flff on the status of the following: ,

.. 4.5.2.1 Radiation surveys and dose rates in the plume -

area.

4.5.2.2 Kit Invento n consumed.

. 4.5.2.3 Equipment operating status.

$ 4.5.2.4 Any sampling problems.

. . 4.5.2.5 Plant status information. I N.

i 4

1

T -  ;. v.~ g .2 .3 . ,._ - w : .

..z. ,  ;;;,y6.r.-x un <.. . . = . + - . g? y:~-;... - -e-------- .

' *. *.
  • y; e: :p:vif%,>:3%,;.g,ygp:g:,s:;;;3gy5;s-;.q1':?n.&;J5 g7,74.g . - c y..g?O qj m - _ . ; . .-

HP/0/B/1009/04 Page 7 of 7 '

(.

  • x_ 4.5.3 Direct the relief FMT to don TLD's and pocket dosimetry and

, fill out dose cards.

4.5.4 Return all samples to the Emergency Kit Storage Room as directed by the FMC.

4.5.5 Turn in all data sheets to the FMC or his designee.

. 5.0 ENCLOSURES

_ 5.1 Air Sampler, TLD, and W'ater Sample Locations

~~

5.2 Milk Sample Locations

, 5.3 Predetermined Sampling Locations 5.4 Sample of Radio Operators Log Field Monitoring Survey Data 5.5 Sample of Field Monitoring Data Sheet 5.6 Sample Time Required For Minimum Sample Volume - --

5.7 Sample of Field Monitoring Team Work Sheet For Determining Iodine Activity y[b- 5.8 TSC Field Monitoring Organization -

5.9 Emergency Vehicles'

_t-B

/~ .

t

  • . ..... ---..,,. . . - - - . - . . - - , ~ - ~ - - . . . - . . - . ~ . - ~ - - - - . ~ - - - - -

r- -

'Tl _hl.' [ .k .?~khkh5fhifNh.fh'.,hf;fh fh*; kf.f. :Yk,b i~. _j, -

Page 1 of 9 DUKE POWER COMPANY

( CATAWBA NUCLEAR STATION

)

(~ HP/0/B/1009/04

)

. ENCLOSURE 5.1 1

[ _. .

AIR SAMPLER, TLD, AND WATER SAMPLE LOCATIONS -

I l

AIR SAMPLE LOCATIONS (NEED KEY, CPD-1)

..-._=

ZONE & RADIUS (Mi) No. ,

DESCRIPTION

~

' ' ~ A0 1 1 Hwy. 274-N for .5 miles, right on Liberty Hill Rd. for .4 miles to fork in road, right -= -

at fork for 1.1 miles to end of road (TLD &

Air CNS #200, need key).

I A0 1 5 Left exiting Steam Production entrance on Concord Rd. for 1.2 miles, left on Old Concord Rd. for .3 miles, right on Acacia

." Rd. for .3 miles, left on Crepe Myrtle Rd.

., for .7 miles, left on Blue Bird Ln. for .1 miles to end (TLD & Air CNS #201, need key).

I A0 1 26 Location at the base of Catawba Nuclear i h". .

' " Station Meterological Tower (TLD & Air CNS #205, need key).

~

'. B1 3 1 Hwy. 49-N for 8 miles, right Hwy. 160 for "

2.8 miles, right on Gold Hill Rd. (98) at Tega Cay sign for 1.2 miles, right on gravel road into Duke Power Company substation (TLD

& Air CNS #212, need key).

. C2 10 j

5 Hwy. 274-S for 5.1 miles, left Hwy.161 for 1.3 miles, right on Rawlinson Rd. (56) for 1.8 miles, left on Hwy. 5 for 1.6 miles, right on Heckle Blvd. (901) for 3.3 miles to end of road, left on Hwy. 72 for 1.2 i miles, right on dirt road across from i

Wayne's Auto Service. Go .1 miles to Duke i Power Company substation on left (TLD & Air CNS #217, need key).

A0 1 1 Hwy. 274-N for .5 miles, right on Liberty Hill Rd. for .4 miles to fork in road, right at fork for 1.1 miles to end of road (TLD &

Air CNS #200, need key).

)

J

,. .,, -#---. - . * * = * - y e. - -

C

.]$ ~kh$fbibk f ff?$.fh f $$khh f hhh khh$hf- hbj- {h.- ($

.  ?.' ? {.

\

o ,

Page 2 of 9 ,

DUKE P0hT.R COMPANY l

~ , .

CATAWBA NUCEAR STATION

^

~

HP/0/B/1009/04 l

. ENCLOSURE 5.1  !

AIR SAMPLER, TLD, AND WATER SAMP2 LOCATIONS -

1

_. - AIR SAMPLE LOCATIONS (NEED REY, CPD-1) --,

~

ZONE & RADINS (Mi) No. DESCRIPTION ' - - - ~

A0 1 5 Left exiting Steam Production entrance on

' ~ ~

Concord Rd. for 1.2 miles, left on Old Concord Rd. for .3 miles, right on Acacia Rd. for .3 miles, left on Crepe Myrtle Rd.

for .7 miles, left on Blue Bird Ln. for,1 --

miles to end (TLD & Air CNS #201, need key).

A0 1 ~8 Left exiting Steam Production entrance'on Concord Rd. for 1.2 miles, left on Old Concord Rd. for .3 miles,'right on Acacia -

, Rdl fok '.3.' ailes,'left on Crepe Myrtle Rd.

j

, Go .3 miles to first drive on right -past -

Paradise Pl., TLD across road'(TLD CNS c

  • (202).

(e?

A0 '

1

' 11 Left exiting Steam Production entrance- on Concord Rd., for 1.2 miles, left on Old Concord Rd. for .3 miles, right on Acacia '

Rd. for .3 miles, left on Crepe Myrtle Rd.

for .2 miles. TLD is on left in curve (TLD CNS #223).

I:- --

---A0- - -- 14 Left exiting Steam Production entrance on Concord Rd. for 1.2 miles, left on Old i Concord Rd. for .3 miles, right on Acacia Rd. for .2 miles. TLD is on right side of road (TLD CNS #224).

_ A0 1 .

17 Left exiting Steam Production entrance on Concord Rd. for 1.1 miles to first transmission tower on left after bridge (TLD CNS #225).

A0 1 20 Left exiting Steam Production entrance on Concord Rd. for .7 miles. TLD on left just

, past fence (TLD CNS #226).

9 9

  • -*m**-w*=* ** *-"
  • F . .

,. '"YY. Y

~

$hh hfhh.h .f:fhI-h f h h'fY. , t; Yfi' $ h f .' h .-

i

  • Page 3 of 9

~~

DUKE POWER COMPANY ,

(i CATAWBA NUCLEAR STATION HP/0/B/1009/04

.; , ENCLOSURE 5.1 1

. AIR SAMPLER, TLD, AND WATER SAMPLE LOCATIONS

_ .. . AIR SAMPLE LOCATIONS (NEED EEY, CPD-1) ~

t ZONE & RADIUS (Mi) No. ,

DESCRIPTION - -

1_ A0 1 23 Left exiting Steam Production entrance on 4

Concord Rd. for .4 miles. TLD on left at beginning of guardrail posts (TLD CNS #204).

j A1 4 2 Hwy. 49-N for 6.5 miles to the intersection

' - '-~

of Pleasant Hill Rd. (1109). TLD is'on the - -

transmission tower on left (TLD CNS #232).

j Al 4 4 Hwy. 49-N for 6.5 miles, right on Pleasant Hill Rd. (1109) for .5 miles, right on

' Youngblood Rd. (1102) for .6 miles, left on Zoar Rd. (1105) for .4 miles, right on t i (-- Thomas Rd. (1104) for .1 miles. TLD is

. v __ _ . _ . _ _ . . _ . . - .

behind second house on. -- -

B1 3 1 Hwy. 49-N for 8 miles, right on Hwy.160 for 2.8 miles, right on Gold Hill Rd. (98) '

j at Tega Cay sign for 1.2 miles, right on gravel road into Duke Power Company

. substation (TLD & Air CNS #212, need key).  !

s' i

. . ; - B l. . 4 ._ 3 Hwy. 49-N for 8 miles, right on Hwy.160 for 3.9 miles, right on Dan Rd. (99) for 1

1.9 miles to last gravel road on right in sharp curve before Lake Wylie Dam, left t_ _ l through fence for .2 miles to substation, j TLD on right of inner substation fence-(TLD-

CNS #235).

B2 4 2 Hwy. 49-N for 8 miles, right on Hwy.160 for 2.8 miles to the Home Federal Savings

~~

~~~ ~ ~~ and Loan on left side of road. TLD on -

barbed wire fence approximately 50 yds.

F behind bank (TLD CNS #234).

- _ . - - - - _ . _ __]

b e

I

' * *' ., l

..w..

. -- [jlig((',. 3Sf.M_ .5

, [

$.f.jfh$fy3f[;k'hrf;hhkkfff- [ ifs,I- i

!.h h SN b ?: I I_-

. i Page 4 of 9 ,

DUKE POWER COMPANY .

(~- CATAWBA NUCLEAR STATION s

' HP/0/B/1009/04 i . , ENCLOSURE 5.1

38 AIR SAMPLER, TLD, AND WATER SAMPLE LOCATIONS i
  • AIR SAMPLE LOCATIONS (NEED KEY, CPD-1) ..

a_ _ _ _ . _

ZONE & RADIUS (MI) No. DESCRIPTION -

B2 7 6 Hwy. 49-N for 8 miles, right on Hwy. 160

. for 7.1 miles, right on Lee St. for .1 miles, left on Self St. for approximately

' 100 yds. TLD at Fort Hill Municipal-Water--

Supply on right behind Springs Mill (TLD CNS #247, Water CNS #213).

B2 8 1 Hwy. 49-N for 10 miles, right on Carowinds---

Blvd. (1441) for 1.3 miles, left on Choate Circle for .3 miles, TLD is on the inside of fence left of the guardhouse (TLD CNS

  1. 246).

r-( '- A0 1 26 Location at the base of Catawba Nuclear Station Meterological Tower (TLD & Air.CNS. _ __

  1. 205, need key).

A0 1 29 Left exiting Steam Production entrance on i Concord Rd. for .1 miles. TLD at Shady Shore Dr. on right corner of.

A0 1 32 Right exiting Steam Production entrance on t

Concord Rd. for .1 miles. TLD is on right

  • side of entrance to Valelake Rd. (TLD CNS
  1. 228).

-~

A0 1 35 Right exiting Steam Production entrance on Concord Rd. for. 4 miles. TLD on top-of hill on right at the intersection of Catawba Nuclear Station Construction entrance (TLD CNS #206).

_-. _.~

"4

, . _ . , , - . , -- . -- . . - , - - - , n 7-

r W

,~,p,-' (* , a$YI]S.?.

iC .u ..k;.?SWQ o_ 2.- - i'W225.y;lg.

smeww. Yp"lM

,;.. .;>QgCR.Q.,;WC.

.., jMy _

' 'p u.D.??9.

. 9; f, _ p: :~

  • ^5' i, . '

Page 5 of 9 ,

DUKE POWER COMPANY .

j l (/^ CATAWBA NUCLEAR STATION EP/0/B/1009/04

. ENCLOSURE 5.1

. AIR SAMPLER, TLD, AND WATER SAMPLE LOCATIONS

, _ AIR SAMPLE LOCATIONS (NEED KEY, CPD-1)

. ZONE & RADIUS (Mi) No. ,

DESCRIPTION ~~ ~

AO -1 38 Go through Construction Maintenance Dept.

(Central) Main Gate for approx. 50 ft. ,

, left on Alternate 1 for approx. 200 ft, to stop sign, left on gravel road for .1

miles, left into rebar yard for .7 miles on j gravel road to end at chain link fence.

3

- - ~ ~

Follow chain link fence in a northerly - - - - - - -

] direction for approx. 300 yds. TLD is hanging on fence (TLD CNS #229). ~

A0 41

, 1 Hwy. 274-N for .5 miles, right on Liberty i

Hill Rd. for .4 miles to fork in road, right at fork for .4 miles. TLD on fence ----

on right (TLD CNS #207).

i A0 1 44 Hwy. 274-N for .5 miles, right on Liberty

  • ~~ ~ ~ ~ ~ '~ ~ ~ Hill Rd. for .4 miles to fork in road,- --- --- - - -

right at fork for 1 mile to large rock pile " ~

at fence. TLD is on fence (TLD CNS #222).

A0 1 45 Left exiting Steam Production entrance on-r'~- "-' ~ ~ ~ ~ ~ -

Concord Rd. for 1.2 miles, left on Old Concord Rd. for 1.4 miles to end of rosa.

TLD is on fence on the left side (TLD CNS '

  1. 203).

~' ~~

Cl~ ~~- 4 -- ~ ~ ~-- 1 Hwy. 274-S for 3.8 miles, left on Mt.

i Gallant Rd. (195) for 5.2 miles, left on India Hook Rd. (30) for .9 miles to the S.C. Wildlife Resources Dept. on left (TLD CNS #236).

~~~~ ~Cl- ~-~4~ ~ ~

^

3 Hwy. 274-S for 3.8 miles, left on Mt.

Gallant Rd. (195) for 3 miles, right on Homestead Rd. (657) for 2.5 miles to end of

./ road. TLD is straight across at

("~ intersection of Twin Lakes Rd. (TLD CNS

  1. 237).

t a

~

c q n.

... .  :. : s"- n; >w- .-

p:n:;;7 w:ww.v 3', y- :g*::.s: -; .y ;ww' .+.:7;y- Q'2.j&.gQsy[m$ps,ig;;.g.pfily.;fyj=9;g ,s g .p'gg , , .<_m.

,g  ; :.7,:

~ :..g.;- ~.gi-A;

_ s;

__f .

q T'.um~ ;.--1

,1 . . '

o -

Page 6 of 9 .

DUKE POWER COMPANY ,

, ('~' CATAWBA NUCLEAR STATION

(, HP/0/B/1009/04

. ENCLOSURE 5.1

, AIR SAMPLER, TLD, AND WATER SAMPLE 1.0 CATIONS AIR SAMPLE LOCATIONS (NEED REY, CPD-1)

, ZONE & RADIUS (Mi) No. DESCRIPTION 5 - -- '

  • C1, 4 5 Hwy. 274-S for 3.8 miles, left on Mt.

' ' Gallant Rd. (195) for 1.3 miles, right on West Oak Dr. (962) for 1.2 miles to end at fork. TLD on left at fence. (TLD CNS #238).

C2 7 3 Hwy. 274-S for 9.2 miles, right on Herlong

- Ave. for .3 miles to Piedmont Medical Center emergency entrance to back of

+ - -

hospital. TLD on fence at back right corner of Liquid Oxygen storage area (TLD CNS #248).

i i

p C2 8 6 Hwy. 274-S for 5.1 miles, left on Hwy.161 s

v____ ._ _ for 1.3 miles, right on Rawlinson Rd._-(56)_ ____

f6r 1.8 miles, left on Hwy. 5 for .5 miles

  • to Rock Hill Career Development Center on right. TLD on transmission tower in front of' building (TLD CNS #249). ~

C2 10 5 Hwy. 274-S for 5.1 miles, left on Hwy.161 for 1.3 miles, right on Rawlinson Rd. (56) for 1.8 miles, left on Hwy. 5 for 1.6

' -~ miles, right on Heckle Blvd. (901) for 3.3 miles to end of road, left on Hwy. 72 for 1.2 miles, right on dirt road across from Wayne's Auto Service. Go .1 miles to Duke -

Power Company substation on left (TLD & Air CNS #217, need key).

D1 4 2 Hwy. 274-S for 1.2 miles, right on Campbell Rd. (80) for 2.3 miles, left on.

D1 -

5 1: Hwy. 274-S for 5 miles to Carter Lumber e Co. TLD on fence near gate (TLD CNS #239).

F

, . 8 9

4 as 7 y- . p. - _ . , . . . _ _ _ ..,-,,,,..% + . , . ,

U' -. ..

, i f- $$ khhhhh,h$ha. k f{f.5k$f .?$; b;N '. Y 3 . . ,

l , Page 7 of 9 ,

l '

DUKE POWER COMPANY '

1 CATAWBA NUCLEAR STATION

{~.- HP/0/B/1009/04 i . ENCLOSURE 5.1 i

AIR SAMPLER, TLD, AND WATER SAMPLE LOCATIONS *

~

_h . AIR SAMPLE LOCATIONS (NEED REY, CPD-1) "

j ZONE & RADIUS (Mi) No. '

, DESCRIPTION

.' D1 5 .

4 Hwy. 274-S for 1.2 miles, right on Campbell' 4

  • Rd. (80) for 3 miles. TLD on left at beginnin~g of fence (TLD CNS #241).

~ ~ ' '

~I D2 ~10' ~ 4 Hwy. 274-S for 1.2 miles, right on Campbell j Rd. (80) for 3.4 miles, left on Hwy. 49-S

, for 5.2 miles, left on North Congress St.

i (64) for .7 miles, left on Hwy. 5 for .2 miles to Duke Power Company Appliance Center on left. TLD on fence in back (TLD CNS #250).

r- El 5 2 Hwy. 49-S for 3 miles, right on Paraham Rd.

4

(' (54) for .7 miles to transmission tower on left after bridge (TLD CNS #242).

1 El 5 3 '

Hwy. 274-N for 2.1 miles, left on Hwy. 55

~- for 2.3 miles, left on Kingsburry Rd.-(114) for .4 miles to transmission tower on left

]'

(TLD CNS #243).

.i

! 10 2

. E2 Hwy. 274-N for 2.1 miles, left on Hwy. 55

l. for 7.4 miles to Duke Power Company Appliance Center on left. TLD on fence in l

back of building (TLD CNS #251).

. F1 4 1 Hwy. 274-N for 2.1 miles, left on Hwy.-55 g_____.._. _.

for 1.5 miles to Bethel School. TLD on side of small building in back (TLD CNS

  1. 244).

F1 4 3 Hwy. 274-N for 3.4 miles, left on Glenvista Rd. to Crowders Creek boat landing. TLD to east of parking lot (TLD CNS #245). - - - - - - -

f .

J, ~~v -~

m .

-'.. h.k .

7 .

. h ,

f ;r '

. /

4 d * ,

Page 8 of 9

- l

.- DUEF. POWER COMPANY i b CATAWBA NUCLEAR STATION 1 i D- HP/0/B/1009/04

.i ENCLOSURE 5.1  !

^ ~

J AIR SAMPLER, TLD, AND WATER SAMPLE IdCATIONS -

U _ -

AIR SAMPLE LOCATIONS (NEED EEY, CPD-1) -

j .

' ~

__.1 ZONE & RADIUS (Mi) No. , DESCRIPTION u- : - - - - -

- F1 :4 . 4 Hwy. 274-N for 3.1 miles to River Hills

. Plantation rear entrance at Hamilton's

, Ferry Rd. TLD behind green building on right corner (TLD CNS #230). -

F1 . 4 6 Hwy. 49-N for 4.1 miles to River Hills j Plantation entrance guardhouse (TLD CNS
  1. 231).
  • ~

,~

A0 1 ,

46 Left exiting Steam Production entrance on

'. Concord Rd. for .7 miles. Turn lef t--just -- --

after canal bridge. Go to pier (Water CNS

[. .

  1. 208, need key).

A1 4 6 Hwy. 49-N for 5.6 miles, left at Camp --

, Steere sign after crossing Bus *.er Boyd Bridge for .7 miles to end of road (Water ,

! CNS #215).

't

_ B1 4 5 Hwy. 49-N for 8 miles, right on Hwy.--I'^

for 3.9 miles, right on Das Rd. (99) for l 1.6 miles, left on Gray Rock Rd. (251) for

.7 miles to Lake Wylie Dam. Walk through plant to upstream side of the das (Water l CNS #211).

B1- 4 -

6 Hwy. 49-N for 8 miles, right on Hwy. 160 for 3.9 miles, right on Das Rd. (99) for 1.6 miles, left on Gray Rock Rd. (251) for

.7 miles to Lake Wylie Dam. Go to river 7._. _.._ _ . . _ _ . _ access on downstream side of dam. -

B2 7 6 Hwy. 49-N for 8 miles, right on. Hwy. 160

, ,. for 7.1 miles, right on Lee St. for .1 miles, left on Self St. for approximately

i. - (__.-

100 yds. TLD at Fort Mill Municipal Water Supply on right behind Springs Mill (TLD CNS #247, Water CNS #213).

t

.f I .

. -. }

. I '- 5 '

1

"+

4 s s

Page 9 of 9 -

1 DUKE POWER COMPANY .

[ CATAWBA NUCLEAR STATION j n, . HP/0/B/1009/04 1

- ENCLOSURE 5.1 i n AIR SAMPLER, TLD, AND WATER SAMPLE LOCATIONS-h.

. AIR SAMPLE LOCATIONS (NEED REY, CPD-1) 2 y _ __ . . . - . _ . . - - - . --

^{. ZONE & RADIUS (Mi) No. DESCRIPTION - -

j _ _. = .. . = - -

3

~

C2 7 2 Hwy. 274-S for 3.8 miles, left on Mt. .

-j Gallant Rd. (195) for 8.5 miles to the intersection of Cherry Rd. Go to Rock Hill

, Municipal Water Supply across intersection

{~

on left (Water CNS #214). _ , _ _ _ _ _ _ , _

1 I C2 7 8 Hwy. 274-S for 3.8 miles, left on Mt.

l Gallant Rd. (195) for 7.6 miles, left on

=^j Hwy.161 for 1.1 miles, left on Hwy. 21 for

.4 miles, left on Grier McGuire Rd. 'f6r .5 miles to end of road. *

', (~ F3 14 4 Hwy. 274-N for 5 miles, right on Pole t,

Branch Rd. (279) for 2.8 miles, right on Hwy. 273 for 7.2 miles into Belmont,- rfght i

on Catawba St. for .6 miles, left at next light for .2 miles to Belmont Municipal j ~

Water Supply (Water CNS #218). '

.i 9

e a

I t -

l i

1 e l I

A 1

I l

1 i -

L __ _ -

f. f}bh?hYkWE h$$N $ kh'$ h
.

k?. *>

?. ' 5 - _

. , I

{ Page 1 of 1 l , DUKE POWER COMPANY .

  • {

! CATAWBA NUCLEAR STATION HP/0/B/1009/04 1, '

' .ENCLOSuaE 5.2

MILK SAMPLE LOCATIONS l '

ZONE & RADIUS (Mi) MILK DESCRIPTION i .

~i- ' D1 6 M Hwy. 274-S for 5.1 miles, right on Hwy.161 j for 2.1 miles, left on Rd.1080 for -.5 i miles to Pursley Dairy. _

8

  • Hwy. 274-S for 5.1 miles, right on Hwy.161

, ' r-- ---- D2 M

~

for 4.7 miles, left at Scism Dairy and

~ !. Equipment Co. (CASE sign).

, ~E2 6 H Hwy. 274-N for 2.1 miles, left on Hwy. 55 for 3.3 miles, left on Clinton Dairy Rd. to e . .- -

end of road. --- - -

! F1 3 M Hwy. 274-N for 2.2 miles, right on Lake

! Wylie Rd. (1099) for .1 miles to first

house on left (Ingram Richmond residence).

~

F2 7 M Hwy. 274-N for 2.1 miles, left on Hwy. 55 for 3 miles, right on Paraham Rd. (54). for--

1.5 miles, left on Hwy. 557 for 1 mile.

~

Barnett Dairy on left.

k'-

D1 7' M Hwy. 274-S for 5.1 miles, left on Hwy.16'1

' for .1 miles, right on Adnah Church Rd.

~ (81) for 1.4 miles. Woods Dairy is on the '

. left.

1 -- - - F2 13 -- - M Hwy. 274-N for 2.1 miles, left on Hwy. 55

' for 9.5 miles through Clover, S.C., right on Lloyd White Rd. (148) for 2.3 miles ,

left on Crowders Creek Rd. (1103) for 1.3 miles, right on Sparrow Springs Rd. (1125) for .5 miles. Oates Dairy is on the left.

e e

i I

m.

e

n .

h h k bfh kh h h /kkh $ ,

5  ? i.

Page 1 of 13 j . -

DUKE POWER COMPANY ,

CATAWBA NUCLEAR STATION

' EP/0/B/1009/04

. ENCLOSURE 5.3 PREDETERMINED SAMPLING LOCATIONS 1

ZONE & RADIUS (Mi) No. DESCRIPTION -- --

t .

4 A0 1 1 Hwy. 274-N for .5 miles, right on Liberty Hill Rd. for .4 miles to fork in road, right at fork for 1.1 miles to end of road

,(TLD & Air CNS # 200, need key). ,

A0 1 2 Hwy. 274-N for 2.2 miles, right on Lake .

._ Wylie Rd. (1099) for 2.2 miles to fork in road, right at fork onto Commodore Pl. for

.2 miles, left on Tioga Rd. for .3 miles to 4

! end of road.

i

! A0 2 3 Hwy. 274-N for 2.2 miles, right on Lake i Wylie Rd. (1099) for 2.2 miles to fork in i road where pavement ends.

l A0 2 4 Hwy. 49-N for 6.5 miles, right on Pleasant i Hill Rd. (1109) for .5 miles, right on

! Youngblood Rd. (1102) for 3 miles to fork

' in road, left at fork for .6 miles to end (7 at Catawba Yacht Club.

(

A0 1 5 Left exiting Steam Production entrance on Concord Rd. for 1.2 miles, left on Old a'

Concord Rd. for .3 miles, right on Acacia Rd.' for .3 miles, left on Crepe Myrtle Rd.

for .7 miles, left on Blue Bird Ln. for .1 miles to end (TLD & Air CNS #201, need key).

', A0 1 6 Hwy. 49-N for 6.5 miles, right on Pleasant Hill Rd. (1109) for .5 miles, right on

( Youngblood Rd. (1102) for 2.8 miles, left n .

on Snug Harbor Rd. (1357) for .5 miles,

  • right on Kalabash Rd. for .3 miles, right

, on Cozy Cove Rd. (1434) for .5 miles to end.

AD 2 7 Hwy. 49-N for 6.5 miles, right <"1 Pleasant Hill Rd. (1109) for .5 miles, right on

, Youngblood Rd. (1102) for 2.8 miles to the intersection of Snug Harbor Rd. (1357).

A0 1 8 Left exiting Steam Production entrance on Concord Rd. for 1.2 miles, left on Old r

Concord Rd. for .3 miles, right on Acacia s

Rd. for .3 miles, left on Crepe Myrtle Rd.

Go .3 miles to first drive on right past

, . Paradise Pl., TLD across road (TLD CNS j ( #202).

A0 1 9 Hwy 49-N for 6.5 miles, right on Pleasant Hill Rd. (1109) for .5 miles.

.i, -

0 O a

e9e y-

c > .

  • ?k$$ h_? fl $. _$ h b $h k b$ hk- $ k $ ' h 'kk h.Y . -  ?-

, i Page 2 of 13, DUEE POWER COMPANY .

/' CATAWBA NUCLEAR STATION I

  • HP/0/B/1009/04

, ENCLOSURE 5.3 j PREDETERMINED SAMPLING LOCATIONS ZONE & RADIUS (Mi) No. DESCRIPTION - - -

... right on Youngblood Rd. (1102) for 2.3

._ miles, left on Snug Harbor Rd. (1357) for

, ,, 1.3 miles to end of road.

A0 2 10 ' Hwy. 49-N for 6.5 miles, right on Pleasant-Hill Rd. (1109) for .5 miles, right on Youngblood Rd. (1102) for 2.8 miles, left i

on Snug Harbor Rd. (1357) for 1.3 miles, left on Crosshavens Dr. for ,3 miles to end a -

of road.

t

) A0 1 11 Left exiting Steam Production entrance on

' Concord Rd. for 1.2 miles, left on Old Concord Rd. for .3 miles, right on Acacia Rd. for .3 miles, left on Crepe Myrtle Rd.

for .2 miles. TLD is on left in curve (TLD g CNS #223).

A0 1 12 Hwy.49-Nfor6.5 miles,rigittonPleasant

( Hill Rd. (1109) for .5 miles, right on

(~ Youngblood Rd. (1102) for 1.6 miles, left

' on McKee Rd. (1100) for 1.2 miles, right on Bankhead Rd. for 1.2 miles to end of road.

" A0 2 13 Hwy. 49-N for 6.5 miles, right on Pleasant "

Hill Rd. (1109) for .5 miles, right on Youngblood Rd. (1102) for 1.6 miles, left on McKee Rd. (1100) for 1.2 miles, right on Bankhead Rd. for .4 miles to the intersection of Bessbrook Rd.

~ A0 1 14 Left exiting Steam Production entrance on

. Concord Rd. for 1.2 miles, left on Old Concord Rd. for .3 miles, right on Acacia Rd. for .2 miles. ILD is on right side of road (TLD CNS #224).

9 A0 1 a 15 Left exiting Steam Production entrance on Concord Rd. for 1.3 miles, left on i Kingfisher Dr. for 1.8 miles to Commodore Yacht Club.

A0 1 16 Left exiting Steam Production entrance on Concord Rd. for 1.3 miles where pavement ends.

(,

A0

~

1 17 Left exiting Steam Production entrance on

' Concord Rd. for 1.1 miles to first transmission tower on left after bridge (TLD.CNS #225).

, ~ ,

.i

  1. CN~D55)' [h[lE$NNE6hh[hNhhikhhk hhbb Nhb _

k . $ .hk s o i ,

Page 3 of 13 i .

DUKE POWER COMPANY .

i r C'ATAWBA NUCLEAR STATION i

g EP/0/B/1009/04

, . ENCLOSURE 5.3 1

PREDETERMINED SAMPLING LOCATIONS 1
ZONE & RADIUS (Mi) No. DESCRIPTION q._ . _ . . . _ . _..

i A0 1 18 Left exiting Steam Production entrar.ce on Concord Rd. for 1.7 miles, right on 4

Sandlapper Rd. for .2 miles. Stop at

transmission tower.

j' A0 2 19 Hwy. 274-S for 1.6 miles, left on Allison

, Creek Rd. (1081) for 3 miles to end of

pavement.

] A0 1 20 Left exiting Steam Production entrance on u

i

. Concord Rd. for .7 miles. TLD on left just

j past fence (TLD CNS #226).

I  !

1 i A0 1 21 Hwy. 274-S for 1.6 miles, left on Allison l . Creek Rd. (1081) for 1.7 miles, left on Spratt Rd. to end. (Beware of dogs).

l A0 2 22 Hwy. 274-S for 1.6 miles, left on Allison j l Creek Rd. (1081) for 1.6 miles to j 5 f

intersection of Bardale Rd.

i (

l  ; " A0 1 23 Left exiting Steam Production entrance on i

Concord Rd. for .4 miles. TLD on left at beginning of guardrail posts (TLD CNS #204).

1 A0 1 24 Hwy.- 274-S for 1.6 miles, left on Allison Creek Rd. (1081) for 1.7 miles, left at.

Spratt Rd. for .1 miles, left on Morrison Rd., right at first 2 forks then left at

, . next fork to end for a total of .5 miles.

A0 2 25 Hwy. 274-S for 1.6 miles, left on Allison I

Creek Rd. (1081) for 1.7 miles to j intersection of Spratt Rd.

s A0 1 26 Location at the base of Catawba Nuclear

~

Station Meterological Tower (TLD & Air CNS

  1. 205, need key).

4 i A0 1 27 Right exiting Steam Production entrance on i Concord Rd. for .1 miles, left on Valelake l '. Rd. for .1 miles to fork in road, left at

fork for .5 miles to end of road.

A0 2 28 Hwy. 274-S for 1.6 miles, left on Allison

] , Creek Rd. (1081) for 1 mile to intersection j ,

( of Colina Rd.

9 E

l 4 .

--7

': .:E 'Sl&$ f5$5.?$ $b hb?h{hh.$ YI $ 0 h? h \ h N h 5 $ h h N{ k h{$$kk. '

5 o .

1 Page 4 of 13 i *

' DUKE POWER COMPANY ,

CATAWBA NUCLEAR STATION j HP/0/B/1009/04

, ENCLOSURE 5.3 4 PREDETER!iINED SAMPLING LOCATIONS ZONE & RADIUS (Mi) No. DESCRIPTION -- --

~

~

, A0 1 ,

29 Left exiting Steam Production entrance on  !

Concord Rd. for .1 miles. TLD at Shady Shore Dr. on right corner of Bethel

.c , Community Clubhouse sign (TLD CNS #227).

, A0 1 _

30 Right exiting Steam Production entrance on ~

' Concord Rd. for .1 miles, left on Valelake i

Rd. for .1 miles to fork in road, right at fork for .5 miles to end of road.

j A0 2' 31 Hwy. 274-S for 1.1 miles to the intersection of Campbell Rd. (80).

A0 1 32 Right exiting Steam Production entrance on Concord Rd. for .1 miles. TLD is on right side of entrance to Valelake Rd. (TLD CNS
  1. 228).

~

A0 1 33 Right exiting Steam Production entrance on

' r Concord Rd. for 1 mile, left on Pine Point 0

Dr. for .5 miles.

A0 2 34 Hwy. 274-S for .7 miles to Big Allison

~ Creek Bridge.

A0 1 35 Right exiting Steam Production entrance on Concord Rd. for .4 miles. TLD on top of hill on right at the intersection of Catawba Nuclear Station Construction entrance (TLD CNS #206).

A0 1 36 Right exiting Steam Production entrance on Concord Rd. for .9 miles. Stop at entrance to transmission lines.

A0 2 37 Hwy. 274-N for .5 miles, right on Liberty Hill Rd. for .3 miles, left on Fremont Rd.

for .2 miles to-end of road.

=

A0 1 38 i Go through Construction Maintenance Dept. 1 (Central) Main Gate for approximately 50 '

ft., left on Alternate 1 for approximately 200 ft. to stop sign, left on gravel road l for .1 miles, left into rebar yard for .7

. I miles on gravel road to end at chain link fence. Follow chain link fence in a

( northerly direction for approximately 300 yards. TLD is hanging on fence (TLD CNS ,

  1. 229). I

N:', * ~ l$)55Ykh$

Y?hh$h?lkbh h $hh h hhhh$ $$kY$ k' $? *!'Y5 :*

i

, e Page 5 of 13,

' DUKE POWER COMPANT .

CATAWBA NUCLEAR STATION I (C .

HP/0/B/1009/04

. ENCLOSURE 5.3

-! N i PREDETERMINED SAMPLING LOCATIONS ZONE & RADIUS (Mi) No. DESCRIPTION - - - -

A0 39

. 1 Hwy. 274-N for .5 miles, right on Liberty -

f Hill Rd. for .4 miles to fork in road, right at fork for. 3 miles to third

, transmission tower on right.

, . A0 .

~~

L . 40 Right exiting Steam Production entrance on Concord Rd. for 1.3 miles, right on Hwy.

274-N for 1 mile, i ~

A0 41

~: 1 Hwy. 274-N for .5 miles, right on Liberty Hill Rd. for .4 miles to forh in road, right at fork for .4 miles. TLD on fence I on right (TLD CNS #207).

4

A0 1 42 Hwy. 274-N for .5 miles, right on Liberty Hill Rd. for .4 miles to fork in road, right at fork for .8 miles to softball field entrance.

t A0 2 43 Hwy. 274-N for 2.2 miles , right on Lake

[;--

Wylie Rd. (1099) for 1.9 miles, right on Beaver Creek Trail for .3 miles to end of road.

J l A0 1 44 "

' Hwy. 274-N for .5 miles, right on Liberty Hill Rd. for .4 miles to fork in road, i ' right at fork for 1 mile to large rock pile at fence. TLD is on fence (TLD CNS #222).

A0 1 45 Left exiting Steam Production entrance on Concord Rd. for 1.2 miles, left on Old

~~ Concord Rd. for 1.4 miles to end of road.

TLD is on fence on the left side (TLD CNS

  1. 203).

i A0 1 46 Left exiting Steam Production entrance on i

Concord Rd. for .7 miles. Turn left just

' after canal bridge. Go to pier (Water CNS

  1. 208, need key).

Al 3 1 Hwy. 49-N for 4.8.itles to the N.C. side of Buster Boyd Bridge.

A1 4 2 Hwy. 49-N for 6.5 miles to the intersection of Pleasant Hill Rd. (1109). TLD is on the

(. transmission tower on left (TLD CNS #232).

j

.-._.Y, -_- -_. _ , ..,_ ..__ -._. -, _ _ - , ,_ ,

,khk$h5.N Nh. .hb. hNb_[h'$bh

. - [h hkf r [ h. b

[ Page 6 of 13 DUKE POWER COMPANY .

f. CATAWBA NUCLEAR STATION

.. (

  • HP/0/B/1009/04

} , ENCLOSURE 5.3 j PREDETERMINED SAMPLING LOCATIONS l .

ZONE & RADIUS (Mi) No. DESCRIPTION " .--~

. . A1 5 _: 3 Hwy. 49-N for 7.8 miles to Steele Creek A

_. Volunteer Fire Department on right.

t Al' _ . 4' 4 Hwy. 49-N for 6.5 miles, right on Pleasant

, Hill Rd. (1109) for .5 miles, right on

j .

, Youngblood Rd. (1102) for .6 miles, left on'

Zoar Rd. (1105) for .4 miles, right on
Thomas Rd. (1104) for .1 miles. TLD is
behind second house on right in pines (TLD j j CNS #233).
a

! j A1 5 5 Hwy. 49-N for 6.5 miles, right on Pleasant j j . Hill Rd. (1109) for .5 miles, right on j Youngblood Rd. (1102) for .3 miles, left on Hamilton Rd. (1106) for .7 miles to the intersection of Hwy. 160.

~

A1 4 6 Hwy. 49-F for 5.6 miles, left at Camp Steere sign after crossing Buster Boyd j

(1 .

Bridge for .7 miles to end of rosd'(Water i

,' \Q, CNS #215).

i A2 10 1 Hwy. 49-N for 11.4 miles to Westinghouse Blid. Go 1 mile past Westinghouse Blvd. to ,,

j Roberts Systems 8500 on left. ~

A3 10 1 Hwy. 49-N for 10 miles, right on Carowinds Blvd. (1441) for 3 miles, left on Hwy. 51 1

for 2.1 miles to Sugar Creek Bridge.

. B1 3 1 Hwy. 49-N for 8 miles, right on Hwy.160 for 2.8 miles, right on Gold Hill Rd.- (98) at Tega Cay sign for 1.2 miles, right on gravel road into Duke Power Company substation (TLD & Air CNS #212, need key).

B1

~ ~ ~

2 -2 Hwy. 49-N for 6.5 miles, right on Pleasant

~ ~ ' ~ ~ ~ -

Hill Rd. (1109) for .5 miles, right on l Youngblood Rd. (1102) for 1.6 miles, left on McKee Rd. (1100) for 1.2 miles, left on Bankhead Rd. for .4 miles, left on Bessbrook Rd. for .8 miles to end of road.

i i

h

. W[25j/hf.. .

. m - e,-a .~ .w O$ 4.N. E T -t,MI.Nkh. 5 p.-

U y.gsi. ppd m. '

hp.g'4WWM$;1*4?%5;,6Ekgg;uw&..p: w .wwe;OMNeeM i .

l Page 7 of 13, DUKE POWER COMPANY

- (f , CATAWBA NUCLEAR STATION j kr. HP/0/B/1009/04 j . ENCLOSURE 5.3

. PREDETERMINED SAMPLING LOCATIONS t
  • j ZONE & RADIUS (Mi) No. DESCRIPTION -e -

c-B1 4; _m, 3 Hwy. 49-N for 8 miles, right on Hwy. 160

__ for 3.9 miles, right on Das Rd. (99) for

~

4 1.9 miles to last gravel road on right in j - - --

m , sharp curve before Lake Wylie Dam, left '

through fence for .2 miles to substation.

TLD on right of inner substation (TLD CNS 1

  1. 235).

! 4 B1 2 -

Hwy. 49-N for 8 miles, right on Hwy. 160

') for 2.8 miles, right on Gold Hill Rd. (98) i at Tega Cay sign. Enter Tega Cay following i Tega Cay Dr. for 2.6 miles, right on Windjammer Dr. for .6 miles to circle, i right at circle for .2 miles, left on Kiwi Point for .2 miles to end of road.

j B1 4 5 Hwy. 49-N for 8 miles, right on Hwy.160 for 3.9 miles, right on Dan Rd. (99) for j -

1.6 miles, left on Gray Rock Rd. (251) for j jf'.. . .7 miles to Lake Wylie Dam. Walk through i i; plant to upstream side of the das (Water

_ _ _ _ . . . CNS #211). --- ----

B1 4 6 Hwy,. 49-N for 8 miles, right on Hwy. 160 for 3.9 miles, right on Das Rd. (99) for 1.6 miles, left on Gray Rock Rd. (251) for

$ ~__ . _ _ .__.._.

.7 miles to Lake Wylie Dam. Go to river - - -- - - - - --

. access on downstream side of dam.

t t

. B2 8 3 1 Hwy. 49-N for 10 miles, right on Carowinds Blvd. (1441) for 1.3 miles, left on-Choate Circle for .3 miles. TLD is on the inside 1 -

of fence left of the guardhouse (TLD CNS i #246).

B2 4 2 Hwy. 49-N for 8 miles, right on Hwy. 160 for 2.8 miles to the Home Federal Savings and Loan on left side of road. TLD on barbed wire fence approximately 50 yds.

behind bank (TLD CNS #234).

B2 5 3 Hwy. 49-N for 8 miles, right on Hwy.160 for 2.8 miles, left on Gold Eill Rd. (98) for 1 mile, stop at the intersection of i -] .

, Whitley Rd.

x- i e

j $ .

i  ;

- ^ ^

3 _

.? v $ c...c:. - -m ew r~ s jgjg v' **yig.'

  • ~ 8, '$yilh.3, s g $:

.p.9?l.???@?"(kWerm+yj;qg,gg';mp&;ggqfi,lpy;,g,?wugau~ec gM g. g-g4fi&6yyjffi- .c r:y3?;.sn:v.' '

Page 8 of 13, j' '

DUKE POWER COMPANY CATAWBA NUCLEAR STATION

. I f

.Y HP/0/B/1009/04

. ENCLOSURE 5.3 j

PREDETERMINED SAMPLING LOCATIONS ZONE & RADIUS (Mi) No. DESCRIPTION - . _ . -

l B2 10 4 Hwy. 49-N for 10 miles, right on Carowinds  !

Blvd. (1441) for 3 miles, left on Hwy. 51 l for 3 miles, right on Hwy. 521 (Polk St.)

,for 2.9 miles, right on Dorman Rd. for 1.1 miles, stop at the state line.

[~ B2 ' 5 5 Hwy. 49-N for 8 miles, right on Hwy.160 i

for 5.6 miles,'right on Sutton Rd. (49) for L 1.1 miles to the intersection of Gray Rock Rd. (251).

i i B2 7 6 Hwy. 49-N for 8 miles, right on Hwy.160 i for 7.1 miles, right on Lee St. for .1 miles, left on Self St. for approximately i

100 yds. TLD at Fort Mill Municipal Water Supply on right behind Springs Mill (TLD 1

,CNS #247, Water CNS #213).

t

, B2 10 7 Hwy. 49-N for 8 miles, right on Hwy. 160

?' for 10 miles through Fort Mill to the Sugar

{1 Creek Bridge.

C1 4 1 Hwy. 274-S for 3.8 miles, left on Mt.

Gallant Rd. (195) for 5.2 miles, left on ~

1 India Hook Rd. (30) for .9 miles to the

' S.C. Wildlife Resources Dept. on left (TLD CNS #236).

Cl - - - Hwy.274-Sfor3.8 miles,leftonMtI

- 2 Gallant Rd. (195) for 5.6 miles to Red Burketts Body Shop on right.

. ~

C1 4 3 Hwy. 274-S for 3.8 miles, left on Mt.

Gallant Rd. (195) for 3 miles, right on Homestead Rd. (657) for 2.5 miles to end of road. TLD is straight across at -

i intersection of Twin Lake Rd. (TLD CNS

  1. 237).

C1 5 4 Hwy. 274-S for 3.8 miles, left on Mt.

' Gallant Rd. (195) for 3 miles, right on Homestead Rd. (657) for 2.5 miles to end of road.

.C1 4 5 Hwy. 274-S for 3.8 miles, left on Mt.

'~ Gallant Rd. (195) for 1.3 miles, right on West Oak Dr. (962) for 1.2 miles to end at fork. TLD on left at fence (TLD CNS #238).

1 4

. , _ _ _ , , , . m , , _ . _ - . ,

S$.h*hk, k}k f5}f?. h h :h h ,,fk h i{5 g fh h h .h h ;h ?,{f h h f ,ff$ $ N f]fk?ff f h ?

4 ,

I Page 9 of 13, Il _ .

DUKE POWER COMPANY

[.'

CATAWBA NU. CLEAR STATION

! k HP/0/B/1009/04

. ENCLOSURE 5.3 j!

PREDETERMINED SAMPLING LON TIONS .

l _

ZONE & RADIUS (MI) No. DESCRIPTION " -

I C1 5 6 Hwy. 274-S for 5.1 miles, left on Hwy.161 for 2.2 miles to fork in road, left at fork for .1 miles, S.C. National Guard Armory on

,left side of road.

1 C1 5 7 Hwy. 274-S for 5 miles to Carter Lumber-4 j Company.

1

.l j C2 10 1 Hwy. 274-S for 5.1 miles, left on Hwy.161 l for 2.2 miles to fork in road, left at fork j on Celanese Rd. (50) for 8.2 miles to the j intersection of Springdale Rd.

C2 7 2 Hwy. 274-S for 3.8 miles, left on Mt.

j Gallant Rd. (195) for 8.5 miles to the i intersection of Cherry Rd. Go to Rock Hill i

Municipal Water Supply across intersection on left (Water CNS #214).

, (@?':-

C2 7 3 Hwy. 274-S for 9.2 miles, right on Herlong 4

__ .__. . _ _ _ _ _ _ Ave. for .3 miles to Piedmont Medical- -

Center emergency entrance to back of hospital. TLD on fence at back right.

I corner of Liquid Oxygen storage area (TLD

. j CNS #248).

C2 10 4 Hwy 274-S for 5.1 miles, left on Hwy.161 for 5.7 miles, right on Mt. Gallant Rd.

(195) for 1.5 miles, right on Hwy.21-121

, Bypass for 2 miles to the Fast Fare on left  ;

3 at the intersection of Springsteen Rd.

I. C2 10 5 Hwy. 274-S for 5.1 miles, left on Hwy.161 l for 1.3 miles, right on Rawlinson Rd. (56) for 1.8 miles, left on Hwy. 5 for 1.6

.I .

miles, right on Heckle Blvd. (901) for 3.3 j _

miles to end of road, left on Hwy. 72 for j 1.2 miles, right on dirt road across from

Wayne's Auto Service. Go .1 miles to Duke j Power Company substation on left (TLD & Air

) CNS #217, need key).

! C2 8 6 Hwy. 274-S for 5.1 miles, left on Hwy.161 for 1.3 miles, right on Rawlinson Rd. (56) i

}

t for 1.8 miles, left on Hwy. 5 for .5 miles

_, to Rock Hill Career Development Center on right. TLD on transmission tower in front of building (TLD CNS #249).

1 y y- - -w---w cm-- w---- ,, ~-' -

, .h .

5 , hb -

M .h k. f. k '[

Page 10 of 13 l l ... DURE POWER COMPANY .

I  : CATAWBA NUCLEAR STATION l, , HP/0/B/1009/04 ENCLOSURE 5.3 f

1 .

PREDETERMINED SAMPLING LOCATIONS i

t ZONE & RADIUS (Mi) No. DESCRIPTION ._; _

. C2 10 7 Hwy. 274-S for 5.1 miles, left on Hwy.161 for .1 miles, right on Adnah Church Rd.

i l . (81) for 2.9 miles, right on Hwy. 5 for .2

miles, left on Eastview Rd. (102) for 3.2

. . miles, right on Hwy.~322 for .1 miles, left

. on Falls Rd. for .9 miles to the J 3 intersection of Oak Park Rd. (103).

1

C2- 7---8 Hwy. P4-S for 3.8 miles, left on Mt.
i Gallant Rd. (195) for 7.6 miles, left on Hwy.161 for 1.1 miles, left on Hwy. 21 for

.4 miles, left on Grier McGuire Rd. for .5

'. miles to end of road.

D1 5 1 Hwy. 274-S for 5 miles to Carter Lumber

) '

, Company. TLD on fence near gate (TLD CNS *

  1. 239).

1i [.q. .

D1 4 2 Hwy. 274-S for 1.2 miles, right on Campbell Rd. (80) for 2.3 miles, left on Paraham Rd.

(54) for 1.5 miles to transmission tower on

, right. TLD on power pole (TLD CNS #240).

  • ~

D1 5 3 Huy.' 274-S for 1.2 miles, right on Campbell i

Rd. (80) for 2.3 miles, left on Paraham Rd.

(54) for .6 miles, right on Harper Rd.

, .(815) for 1.4 miles to Allison Creek Bridge.

D1 5 4 Hwy. 274-S for 1.2 miles, right on Campbell Rd. (80) for 3 miles. TLD on left at beginning of fence (TLD CNS #241).

t D2 10 1 Hwy. 274-S for 5.1 miles, left on Hwy.161 for .1 miles, right on Adnah Church Rd.

l _ (81) for 2.9 miles, right on Hwy. 5 for .2 miles, left on Eastview Rd. (102) for 1 mile, right on Holland Rd. (157) for .7 miles, right on Turkey Fara Rd. (1172) for 1.2 miles, left on Russell Rd. (536) for .2 miles.

~

, [. .

.h f,b hf hf h. f $1 .

'd

- 5-

. j .

, i 4 o i

} Page 11 of 13  !

i DUKE POWER COMPANY .

l CATAWBA NUCLEAR STATION I

, HP/0/B/1009/04

. ENCLOSURE 5.3 '

jl PREDETERMINED SAMPLING LOCATIONS I l

l ZONE & RADIUS (Mi) No. DESCRIPTION - '

I

.. D2 10 2 Hwy. 274-S for 5.1 miles, left on-Hwy.161- l for .1 miles, right on Adnah Church Rd.

(81) for 2.9 miles, right on Hwy. 5 for .3

~, miles, left on Billy Wilson Rd. (1451) for

j. . _

2.2 miles, right on Turkey Farm Rd. (1172)

for .8 miles, left on Benfield Rd. for .3
miles to Fishing Creek Bridge.

2 j D2 10 3 Hwy. 274-S for 1.2 miles, right on Campbell 4

Rd. (80) for 3.4 miles, left on Hwy. 49-S

{ for 5 miles. Stop at Pantry on left.

D2 10 4 Hwy. 274-S for 1.2 miles, right on Campbell i

, ___ ______ . _ _ - _ . ~ ~ Rd. (80) for 3.4 miles, left on Hwy.-49-S for 5.2 miles, left on North Congress St.

j -

(64) for .7 miles, left on Hwy. 5 for .2 miles to Duke Power Company Appliance t

Center on left. TLD on fence in back (TLD CNS #250).

j s_. D2 10 5 Hwy. 274-S for 1.2 miles, right on Campbell Rd. (80) for 3.4 miles, left on Hwy. 49-S for 1.7 miles, right on Old Limestone Rd.

, (172) for 4.3 miles to end of road. ...

, ~

El 5 1 Hwy. 274-S for 1.2 miles, right on Campbell i

Rd. (80) for 3.4 miles to the. intersection of Hwy. 49.

El 5 2 Hwy. 49-S for 3 miles, right on Paraham Rd.

(54) for .7 miles to transmission tower on

..,___ __ _ _ . _ _ _ _ left after bridge (TLD CNS #242). -

El 5 3 Hwy. 274-N for 2.1 miles, left on-Hwy. 55 for 2.3 miles, left on Kingsburry Rd. (114) 3 for .4 miles to transmission tower on left 1

, (TLD CNS #243).- .

l 1

I El 5 4 Hwy. 274-N for 2.1 miles, left on Hwy. 55 i

! for 2.3 miles to the intersection of Kingsburry Rd. (114).

E2 5 1 Hwy. 274-S for 1.2 miles, right on Campbell Rd. (80) for 2.3 miles, rie.ht on Parahan Rd. (54) for .9 miles to the intersection of Dr. Nichols Rd. (819).

4 t *

- ,1

14.jl)$$

(hhN$hb.fh. Ihhk h f IIh Ik f$ $ .

Page 12 of 13 DUKE POWER C0hPANY CATAWBA NUCLEAR STATION (O HP/0/B/1009/04

  • . ENCLOSURE 5.3 l ,

PREDETERMINED SAMPLING LOCATIONS 1 , ZONE & RADIUS (Mi) No. DESCRIPTION E2 10 2 Hwy. 274-N for 2.1 miles, left on Hwy. 55 for 7.4 miles to Duke Power Company l Appliance Center on left. TLD on fence in i

,i back of building (TLD CNS #251).

4~

i E2 10 3 Hwy. 274-N for 2.1 miles, left on Hwy. 55 .

for 7.3 miles to the Pantry on left at the intersection of Hwy. 321, (behind Pantry).

b F1 4 1 Hwy. 274-N for 2.1 miles, left on Hwy. 55 for 1.5 miles to Bethel School. TLD on side

, . ~o f small building in back (TLD CNS #244).

F1 5 2 Hwy. 274-N for 2.1 miles, left on Hwy. 55 for 1.5 miles, right on Bethel School Rd.

(152) for 1 mile to the intersection of Holland Dr.

l

(- F1 4 3 Hwy. 274-N for 3.4 miles, left on Glenvista j t.: ,

I *' Rd. to Crowders Creek boat landing. - TLD to east of parking lot (TLD CNS #245).

F1 4 4 Hwy. 274-N for 3.1 miles to River Hills Pla~ntation rear entrance at Hamilton's..__.l _

Ferry Rd. TLD behind green building on right corner (TLD CNS #230).

F1 5 5 Hwy. 49-N for 2.9 miles to Sherer Memorial Presbyterian Church parking lot on left.

F1 4 6 Hwy. 49-N for 4.1 miles to River Hills

~

Plantation entrance guardhouse (TLD CNS

  1. 231).

F1 5 7 Hwy. 49-N for 3.6 miles, left on Montgomery Rd. for 1 mile. Stop in horseshoe curve j near lake.

F2 10 1 Hwy. 274-N for 4.2 miles, left on Hwy. 557 for 2.2 miles, right on Ridge Rd. (27) for 5 miles to Bowling Green Presbyterian.____ _ __

Church.

,F2 5 2 Hwy. 274-N for 4.2 miles, left on Hwy. 557 for .6 miles to Pine Grove Baptist Church.

D

____.,.._,c. ._ - m _c, _ _ . _ _ _ _ . , , . _ _ _ - _ _ . -

- _ ,7 . - _ . _ . _. . _ _ _ _ _

.:v. :: , z.; - v .cy . .. . .w .. .n .~.. m s . ,:u.v.wa y;. g.,<.y.y,mn...a,+, .;.e ,.y.. c m.aym c.

, . r. v.. , ,. . . . .

?ff f $?5 {:.k?.h_! ~?r,kk bhh$$. 5.$N'll*h$$Q &~~$$5.r$h Sif.h'f' :.'R?i.'h.5;f **l ' bl ' '

d

! Page 13 of 13 .

DUKE POWER COMPANY .

'- [

CATAWBA NUCLEAR STATION  !

, HP/0/B/1009/04 .

. ENCLOSURE 5.3 PREDETERMINED SAMPLING LOCATIONS .

1 ZONE & RADIUS (Mi) No. DESCRIPTION --- - - - - ~

, F3 10 1 Hwy. 274-N for 4.2 miles, left on ' Hwy. 557 for .9 miles, right on Oakridge Rd.'(435) j _ at Bethel Fire Dept. for 5.4 miles to the

{ __ ._ .

, intersection of Hwy. 274 (in N.C.)

8 F3 10 2 Hwy. 274-N for 5 miles, right on P' ole I

Branch Rd. (279) for 5.8 miles to i Friendship Baptist Church on left.

)~~~~ F3 10 ~ '~~'~~~ 3 Hwy. 274-N for 5 miles, right on Pole i Branch Rd. (279) for 2.8 miles, right on

} Hwy. 273 for 3 miles to Allen Steam Plant Bridge.

. F3 14 4 Hwy. 274-N for 5 miles, right on Pole Branch Rd. (279) for 2.8 miles, right on -

Hwy. 273 for 7.2 miles into Belmont, right on Catawba St. for .6 miles, left at next light for .2 miles to Belmont Municipal f, Water Supply (Water CNS #218).

c-4B

  • (

e e

I

  • e. g.=w = m -

a,_%g I

.--._ . . + . . . _ .

4J, ~rWMSINgi.gM.yWMgsg@sNyggggggg:k;pg.gypqgqq:

s.

E 1 .

k i i h .

s 1 .

t < .

I l k . .u ; _

g-3 J

E' ]

a a w

5 i j

t  ; .

i f

9

. a -

8 l

. 11 .

m c'.. ,

g i

~ .

.i illi g 3

4, 2

l .

y .

i l

Jl 1 i A

E 1

1

' a t

i

_ _ _ , - . . . , - . ,_.--.m- - - - - - . . . - , - . . , , - . _ , ,. _ . _ _

- a. v . g u.,.m.- ge x r, wp.n yye y

<.xc >w .c- .. n e n...

a ~.-c. <s.. . ..m. ..__;

, ;:.n,-w .,,+yr;~ .e. g.;,g . n~.

s .v:. rsycy a.

.sq. .:.,.-wy

. . .<l...,M_,r.;t.nty

- -. .,. . r.. -n ..%y;p. w,Asw.,._. .L

.y2 ,m~

<.g;

.v.p .nw.%.r;e,._.

c_x ,. .rv_ . ,4.;:.:m.

.* u. v..,ew

. ,> --. .,<p.--

M%,gw, . ;, , -.a&

h
- s .

e

s. .

I .

i l' .

Page 1 of 1 1

  • 1 $

i ..

DUEE POWER COMPANY . .

l ' 7?  ;

, CATAWBA NUCLEAR STATION HP/0/B/1009/04

.ENCICSURE 5.5

. FIELD MONITORING DATA SHEET -

4

] Date Team Members / Call Sign -

/ Inst. Type /No. /

i g,,

j Sample I,ocation Time Survey Taken Dose Rate (aR/hr) Activity (CCPH) i e

(*

a" a

e up6%

h we e

.4 4

1 3, - -... . ..

J

~f.

4

+

i .

=

TN "-

    • he etNe j t i

4 A

i l ~T.

. s: ..;

-- ~ ~ ~ - --- -- - -.

g -  ?

i T

9

.I, t a f

e my m i

i l

,_ J 1

  • 4 5 '

y= ae- Se-- _ mew 2 -

,_ _ _ _ _ _ . . . _ . - _ . ~

4 1

~

.h E t 9

1

- , , . , , . - ..-,~m__,-,

.-:e.. . > ..p-

. _ ctya . ..v?.Q-M;,;.<;g.n.ggs c.m.e.l'1.g&m$.

.. w i: ,

..  % p :%.:-vf gww.- gggJyy,,yp%yst:.MY

.?en.:. u. --  ;? ,4.D'.??3*'9"p?.f.";Wliiq%

Ts.%.#a.fim en w * ':- Am*>9: c ~

..~ o .

Page 1 of I c

DUKE POWER COMPANY .

'h CATAWBA NUCLEAR STATION

_ ./' HP/0/B/1009/04

?' .

. ENCLOSURE 5.6

i. SAMPLE TIME REQUIRED FOR MINIMUM SAMPLE VOLUME t

FLOW RATE r MINIMUM REQUIRED SAMPLING TIME IN MINUTES _ __

4 . _ - . . .

. Cm LPM

~ .

.5 =

14 . . . . . . . . . . . . . . . . . 71 _

___________1.0 = 28-. . .-. . . . . . . . . . . . . . 36 4

1.5 = 42 . . . . . . . . ... . . . . . . . 24

, j -- - .--.

2.0 = 56 . ... . . . . . . . . . . . . . 18 3 2.5 = 70 . . . . . . . . . . . . . . . . 15 . _ _ _ .

- 3.0 = 84 . . . . . . . . . . . . . . . . . 12

, 3.5 = 99 . . . . . . . . . . . . . . . . . 11 4.0 = 113 . . . . . . . . . . . . . ... . . . 9 . _ _ . _ _ _ _ . .

4.5 = 127 . . . . . . . . . . . . . . . . . .

8" -- ----

. \

_ ~ . . _ _ .

j y- -

J

e. . . ..

~ g

~, -

(.._._-._--.-

.._. - ~<

. i

\ .

f a - .

I NOTE: When estimating time required to get a minimum volume of 1 x lo s

,1__,

if flow rate for the-air sampler in use is not on table, go to next ,

Lower flow rate. The LPM are rounded off to the conservative _' side.

I 5

Example: Air Sampler flow rate = 106 LPH. Minimum time 11 minutes ___._ ____._ -

- . --- -~me- ..---.w k

~' '

_ _. ..-% ._ . ,~

h

m. mees e.-e- 4 *. gis.r a* -.w. m up wM
      • --emM9+_*Nep*h4'-*. eeM mO'

. -.-e.eei s wa-hm-

.4

  • a

. g eee-.- -.-w%s .._

-w.

. . . . _ _ __ n _ --.

w- ,.

-u . > . : o. ... m ;; .a .

ry w,c,, M*:q;:w:9.:w.cem N N b Y7[i' ce:C:*.=  ;

YEEl.'N'k)i[I,f__mole.m'.m....k5 m.

N' .

/.Y.__N k. .h

;a:.-:.c-Qp[:r.. --. __ _-  :. g -- - 1 9 Page 1 of 1 l DUKE POWER COMPANY . f CATAWBA NUCLEAR STATION . HP/0/B/1009/04 ENCLOSURE 5.8 ) TSC FIELD MONITORING ORGANIZATION 4 4 [ POSITION NAME ' BUSINESS PHONE HOME PHONE -l ~ Field Honitoring Coordinators: !t ..t , Primary- ) - j Alternates: l TSC Radio Operators: j Primary: Alternate: f Field Monitoring Teams: 4 1 !. All Health Physics personnel with Field Monitoring Training. i \ e i e e e. J . . . . ,e hi ! l ~ .i t 1 1 1 l l 1 l l , l l [ .. l t _ _-_ __ _ - . - . - - - . - - - - - - - - ~ - - - - - - - - - - - - - - - - - - - - - - , *bbh$ f : ?)NfEhhhh,h$hh$.$-$$._hh.Ehh_$h$'hl / h :h k? $ flh Page 1 of 1 i DUEE POWER COMPANY CATAWBA NUCLEAR STATION HP/0/B/1009/04 1 ENCLOSURE 5.9 EMERGENCY VEHICLES - o 2 s _ . i - . --=- 5.9.1 - ' The two designated emergency vehicles are the I&E and Health Physics vans. The two vehicles are to be obtained (as directed by the FMC) by-doing the". j following. 1 ] . 5.9.1.1 I&E Van '# #~ 4 , 5.9.1.1.1 Obtain keys from the emergency kit. +. l I i

  • 5.S.1.1.2 If the vehicle is off-site request the RfC to contact '

the< vehicle by TSC radio, have the vehicle to ret' urn' l to site famadiately and obtain use when it returns. p { 5.9.1.2 Health Physics Van - s I - 5.9.1.2.1 Obtain keys from the emergency kit. - 5.9.1.2.2 If the vehicle is off-site request the RfC to i; contact the vehicle by TSC radio, have the -- vehicle return to site immediately and obtain e use when it returns. a.. 5.9.2 Obtain any other Station vehicle (if available) as directed by the FMC. 1' 5.9.3 Voluntary use of personnel vehicles is another alternative that may be , considered but should be a last option. 1 4 ) I 4 s a $ l 1 1 4 l 1 \ L - - _ . - -- - -- -- --- - '- - 7- .s .. '~,.,' - . x... . . .e- -- . . . . = . _ .e 3. b.*. . % .. . * ;,. 2(

  • '.,_h-' -

Form h4731 (R9-86) (1) 30 No. HP/0/B/1009/17

  • DUKE POWER COMPANY n s) o to PROCEDURE PROCESS RECORD Incorporated C.. , REPARATION

~ ~ ~ 5 (2) STATION Catawba Nuclear Station (3) PROCEDURE TITLE Post-Accident Containment Air Sampling Systes . ) l (4) PREPARED BY hb k DATE  !  !\!N l ] (5) REVIEWED BY ~ A DATE / / Cross-Diteiplinary Review By '/ / // N/R . (6) TEMPORARY APPROVAL (if Necessary) l/ By (SRO) DATE By DATE .,, (7) APPROVED BY M DATE '*

(8) MISCELLANEOUS

, Reviewed / Approved By DATE {, (. Reviewed / Approved By DATE (9) COMMENTS (For procedure reissue indicate whether additional changes,other than previously approved changes, are included. Attach additional pages,if necessary.) ADDITIONAL CHANGES INCLUDED. O Yes ONo , (10) COMPARED WITH CONTROL COPY DATE COMPLETION (11) DATE(S) PERFORMED (12) PROCEDURE COMPLETION VERIFICATION O Yes O N/A Check lists and/or tilanks properly initialed, signed, dated or filled in N/A or N/R, as appropriate? O Yes O N/A Listed enclosures attached? O Yes.O N/A Data sheets attached, completed, dated and signed? Oyes O N/A Charts, graphs, etc. attached and properfy dated, identified and marked? Oyes O N/A Acceptance criteria met? ~ VERIFIED BY DATE (13) PROCEDURE COMPLETION APPROVED DATE l' L (14) REMARKS (Attach additional pages,if necessary.) - r .?. y ... :c,~- . 3 , v .  ;, y . , -

  • * %y _c.+~;

_ . , .y ~, _ =' ._ ; r e - - , -- - - - . , y ;. [ '; [?. 7;{s 'ti[T C ' _ . - l-+C f y n -[ , 9 ~ ,- }. _ ~~ v- '__~ . .~ ~~ y~ - ! 4.~ 1 s" . s HP/0/B/1009/17 ._ .____ _ ______ _.-. - - - DUKE POWER COMPANY ' CATAWBA NUCLEAR STATION ~~ " t - - - - -- POST-ACCIDENT CONTAINMENT AIR SAMPLING SYSTEM 1.0 PURPOSE ._,_-_- ..=_.-.--._. -- - ! To describe a method for obtaining a containment air sample af ter a i ~~ nuclear-reactor-accident using the Nuclear Post-Accident Containment --~ ~ Air Sampling System (PACS). .

2.0 REFERENCES

1

! 2.1 HP/0/B/1000/06, Emergency Equipment Functional Check and Inventory i ', 2.2 HP/0/B/1009/06, Alternative Methods for Determining Dose Rate -' ~ -~ - - " - - - - - - -

Within the Reactor Building L- 2.3 CP/0/B/8800/13, Chemistry Procedure for the Preparation of ' ' - ~ ~~~

Thiosulfate Solution for Post Accident Gas Sampling 2.4 OP/1/A/6450/10, Containment Hydrogen Control Systems

f ,, 2.5 OP/2/A/6450/10, Containment Hydrogen Control Systems I 2.6 RP/0/B/5000/12, Control of Assessment and Repair Teams

,. 2.7 Duke Power Company Nuclear Station Post-Accident Containment Air .

Sampling System II Manual, File No.: CNM-1210.09-0218001 l l

i 2.8 NuReg-0737 II.B.3 Post-Accident Sampling Capability 2.9 Post-Accident Containment Air Sampling System - Qualifications, File-No . : -- CN-134.10 l

3.0 LIMITS AND PRECAUTIONS t

i 3.1 Exposure from the samples have th'e potential to be very high; therefore, appropriate surveillance and control of personnel shall be provided by Health Physics when taking samples. Entry and exit route to sample panel and control panel area are to be determined ~

by Health Physics surveys.

3.2 The Recire Pump shall never be used at any pressure other than 0" of i

,Hg .

l s , . . --

r

'1 x . . - . .- . .- . - - - ~ . . . .

, N ..N.L N '* %$y,. 2yf,l.,

t: 2../- wl' di; T + S. -: ? Q: # *;>.f:[i l ..-Q l.l Q.$,-i ('-

. . $. $ $ Q HP/0/B/1009/17 Page 2 of 3 .

i 3.3 Noving the Selector switch (#9) from one mode to another stops all current system operations. Depressing the Activate pushbutton (#10) starts operation of the newly selected mode.

'~-

3.3.1 Numbers within parentheses (ex. #9) are locations on Enclosure 5.6 and on the control panel.

3.3.2 (SP) to the left of the enclosure step number requires a. ).

_ person to go to the' sample panel.

i "

-3.4 The Radiation Monitor (#3) on the control panel should provide

^ .

. background levels of radiation prior to, during, and after sampling, and an indication of cone ==ination within the system or panel for progressive samples. .

- . =

3.5 If the needle of the Radiation Monitor (#3) exceeds the upper end of the meter scale while the lower scale (mR/hr) is being used, immediately turn the selector knob to the higher scale (R/hr).

3.6 If the Radiation Monitor (#3) reading cannot be reduced below

' 10 R/hr do not return to the pample panel, but contact the Reserve Personnel / Personnel Monitoring Leader (RPPM) immediately for further instructions.

4 d

3.7 If problems with the Radiation Monitor (#3) are evident (e.g. no indication of radiation on the meter), notify the RPPM and rely on

(_'

Health Physics surveys to determine access to the sample panel.

3.8 If thiosulfate comes in contact with the skin during preparation, transferal or dilution, wash the affected area as soon as possible with soap and lukewarm water. Consult station nurse for further -

instructions.

  • 3.8.1 Do not use NA0H solution and/or t. odium thiosulfate crystals (Na:S2 03 -5H 2 O) if the expiration dates on their labels have been exceeded.

3.8.2 Chemistry should prepare NA0H solution and sodium thiosulfate crystals (Na2 S203-5Hz) per Reference 2.3.

=

,. 3.9 Dispose of contaminated syringes, septums, rubber gloves, etc. , in appropriate radioactive waste receptacles.

- 3.10 Individuals that have been trained on this procedure are the individuals-qualified to use this procedure. Individuals shall be trained and tested every six (6) months and documented in Reference 2.9.

l

. -- a 3.11 Due to the nature of this procedure, a Working Copy shall be used

. . to ensure compliance.

4.0 PROCEDURE 4.1 Follow steps on the RPPM PACS Checklist (Enclosure 5.1).

{O P l

- _ _ .___ -..-._ .._ _ __ _ m . _ _ __ _ ____ _

.> .e.~

%a ; ,?: --
,~ , 7:e --

- ' ':"gdhY'R4:%IW

-: ~ m mb~f;g ;- UY-Y::, w:  : ...

'-F::;;w

  • "W -l:,.Q..q:.M Q% > % .~ ,;: 7 1^'."

.S'** SfiQQ

,HP/// 0 B 1009/17 Page'3 of 3 e

1 .

l .

/ 4.2 Follow steps on Post-Accident Containment Air Sampling Set-Up 1

(Enclosure 5.2). -

1 .

. 4.3 Folldw steps on Taking Post-Accident Containmenf. Air Samples

! (Enclosure 5.3) and complete Post-AccMent Containment Air Sample Data Sheet (Enclosure 5.4) for each containment air sample. request.

~, "'-,' ~ 4.3.1 - If applicable, determine containment' dose rate,per

, Reference 2.2.

4.4 Ensure'the isotopic analysis of each containment air s' ample and

~ ~

~.

j

~ '~

its associated Enclosure 5.4 are submitted to the Station Health -.

Physicist. --

4.5 Follow steps on Post-Accident Containment Air Sampling Shut-Down (Enclosure 5.5). -

4.6 File enclosures and associated calculations in the Health Physics t

Satellite Master File.

] 4.7 Connect 'an appropriate- transfer container and drain the sump by turning the Key Lock switch (#48) to Susp Pump. Accompanying power j lig'it should illuminate.

i  ; ,

4.8 Reinventory OSC kit after use per Reference 2.1.

' (,y

, t- 5.0 ENCLOSURES 5.1 RPPM PACS Checklist 5.2 Post-Accident Containment Air Sampling Set-Up 5.3 Taking Post-Accident Containment Air Samples 5.4 Sample of Post-Accident Containment Air Sample Data Sheet 5.5 Post-Accident Containment Air Sampling Shut-Down 1

5.6 Post-Accident Containment Air Sampling Control Panel (PACP) Diagraa

~

5.7 Post-Accident Containment Air Sampling Sample Panel (PASP) Diagraa 5.8 _ Location of PACP and PASP -

i

(- .

1 (

- ~- .

w-

k

. $._.h_.s. A _'.h  ? h_.h_h$Y$N?N$5'bh.RNTf m i _

.f::- _b_ f _'_$'

~

-"'5f' . .$ hf Page 1 of 2 DUKE POWER COMPANY CATAWBA NUCLEAR STATION

f. - HP/0/B/1009/17 j (. ENCLOSURE 5.1 4 RPPM PACS CHECKLIST t

b

\

. Date/ Time / Unit -

i ..:. .

J Check. Action lj  : .

5.1.1 After completion of Team Personnel Lists of . Reference 2.6, j select at less,t one qualified individual based on PACS training and MSA training (refer to Reference 2.9, Health .'

), ,

Physics file 134.10-4 or the OSC Health Physics Notebook).

j Select another individual to accompany the other. Consider: -

1 .

- Age 3 - Accumulated exposure -

3 - Sex

{ - Ability to carry 100 lbs. together

- Respiratory printout 5.1.2 Consider the following for the PACS:

$ I- ---

' . MSA SCBA's

- Operable breathing air hookups

- Throat mikes

- Portable instruments (PIC-6A, Teletector)

I{ {;;, - High range dosimetry ;_ _

- Extremity dosimetry

- To and from route to PACS

,, EMF-2 Control,Roon readout ,

EMF-1 Control Room readout

, - Flashlight

, - Radios

- Control Points

. 5.1.3 Request assistance in acquiring needed equipment from the Technical Support Center (TSC). i

l. 5.1.4 Prepare Counting Room to receive sample. Consider: l b

- RCZ setup 2

- Shielding

- Disposal of sample - ... -

, - MCA setup

- Personnel

- Dosimetry (high, extremity)

.i.1.5 If necessary, complete dose extension forms.

5.1.6 Obtain a High Radiation Area key.

s 5.1.7 Have equipment prepared for conditions at PACS. Consider:

- Taping wheels on porta-pig

- Bagging loose items b l

,- 1 t

j u.. , . . . , . .e, 3, ep.v ;rr .gc. . ,,;-: . , ,> . ~ . -  : : \;'; e-' . . . . , n - - > > c.

, ,:...ml4 .-R. _.T_ . h.l_N_ . *m -lG C. _M.

'isdlL_ Q* - l A .iL& **.Y'-Y_ ':&:- '

u:... ' ' W,

.. ,iD/~':"'<~?::;g*:

~ '

ci* 46

, t ,

J' '

~ -

Page 2 of 2 ,

CATAWBA NUCLEAR STATION

' HP/0/B/1009/17

. ENCLCSURE 5.1 H

RPPM PACS CHECKLIST i

' Check

  • Action

[ 5.1.8 Inform selected individuals of precautions, Safety and Health Physics concerns and then have them obtain the_

sample. ,

. . ~5.1.9' ~ ~ Remain in contact with the technicians throughout the

, sampling. They should report problems and data as they get them.

. 5.1.10 Complete Enclosure 5.4 and route to Counting Room before

! the analysis takes place.

t 4 - . - -

4 i  ! .

)

p'"

?  ; -

a r.

.P 1

e g.

I e

8

~

, ' I s

8 e

1

< l l

1

=

6 b

1

5 d ~:,,:x , ' ~ . .:.~.  ;-V

, j *.3.fwn-lrcjybc:t.7 Q.MY- j[ L;":pg'q$ . .f:j# ^:i ,

Q;:"A h .T'?-:n:.v' m *.?c i: m ,;y' t'v~*'iQ.L:.,.

4 ^ '-<Y..5:n

'. i: . 'l 5-'  :=-:' . o

f a M I -

Page 1 of 2 l DUKE POWER COMPANY -

f- CATAWBA NUCLEAR STATION

,( EP/0/B/1009/17
  • i . ENCLOSURE 5.2 POST-ACCIDENT CONTAINMENT AIR SAMPLING SET-UP ,

2  :

! Date/ Time / Unit Check , . . _ . ..

Action _ _ _

~ ~~ ~

~5.2.1 Inform the Sh,ift Supervisor that gas sampling will be i

performed and that one Hydrogen Analyzer will need to be

t. .

., inoperable during sampling. Request that Operations _.

; complete the setup Section for Post-Accident Containment

~,

i Alir Sampling of procedure OP/1/A/6450/10 or OP/2/A/6450/10 (see Reference 2.4 or 2.5).

i l 5.2.2 'AfternotificationthatOperationshascompletedEe~ PACS Setup Section, obtain~the Post-Accident Containment Air

' Sampling Equipment located in the OSC Emergency Kit.

i The equipment should be the following:

Quantity Item i

1 - Post-Accident Control Panel (PACP) Key l 2 - 500 ml Nalgene bottle labeled "2.42 x 10~8M NaOH" j ,- 2 - vials of .3 gm Na:S 203 - 5H 0

2 l

t

.=.

- 500 ml Nalgene bottle labeled " Iodine Sample" l 2 100 ml gas bomb 2 - 60 ml Nalgene bottle - labeled " Iodine Sample" j , 1 - Stop watch ,

Prepare thiosulfate solution by adding one vial of 5.2.3

' Na 52 03 -5H2 O to one bottle of Na0H. Shake vigorously until all of the crystals are dissolved. Relabel as

{l " Thiosulfate".

(

t 5.2.4 Verify that the Selector switch (#9) is in the Off position.

^4 5.2.5 ' Move the System Purae toggle switch (#20) to the Normal l position.

l 5.2.6 Move the Gas Purae toggle, switch (#16) to the center

} position.

J , 5.2.7 Move the Refill toggle switch (#24) to the _Off (down) l position.

5.2.8 Turn Key Lock switch (#48) to Power On. Accompanying power light should illuminate.

5.2.9 Turn the Radiation Monitor (#3) On_ by moving the toggle switch (located below the meter) to the U2 position.

A...

I 1

.,...-' ~ . - - g -Ia <.; i.b:) J.3 .~ -

^

~

w . .

.- ;:- c : ..!

, :e ;2 ll.!y,~~ M :.i* y y. .': p hg y1.g~ g r.V 4 *:~~r..'.,t,. :-?f; s :+:r: ~ *^

, ;- * ; c;. , =: - -a ;. .f.:" a

- ~ -s~ ~.x- 'u '? w:':.~ - J w." ~

Page 2 of 2 DUKE POWER COMPANY e CATAWBA NUCLEAR STATION

(.

HP/0/B/1009/17 ENCI,OSURE 5.2

POST-ACCIDENT CONTAINMENT AIR SAMPLING SET-UP l
  • Check -

Action  :

5.2.10 Turn the Radiation Monitor (#3) selector to BATT and verify that the needle is in the " red test region" on the right z.

, ._ end of the scale. If reading is below the test region,' .

. rely on Health Physics surveys to determine access to the sample panel.

5.2.11' Select the appropriate rate so that the needle is on the i meter scale by first turning the selector knob to higher scale (R/hr) and, if necessary, to the lower scale (aR/hr).

! (SP) 5.2.12 Open all four (4) service valves DI, VI, N2 and TS by turning handles one-quarter turn counterclockwise. The DI, VI, and Ng valves are located on the outside upper left side of.the sample panel, and the TS valve is located on top of the sample panel.

i l

5 4

s-L

-- ~~..

h

, o. M -..-

4 .

. a e

I

.P t

(

L 0

....s.em - * - . ~ . , - - . , ~ e

_ . _ - _ _ _ . . - . . , . ~ ~ , - . - - - , - - - - --++--e --r - - ---c- - ' -

w,.,._.,..,.--....-.,.,7_ . . .

. r. , - ...

.. , . . .y -+m.

. %_M_ .$}.9;.?. &5.. . Rf.!.$_ %%y.,g - _ Mc_. .KC.W w.,y?C.. .?$_%-

. .' 4* '@^
____R$u ': C:GWl - 's '

' 3 &'. . i ' I4 y . * , % . _

j , ,

Page 1 of 4 I DUKE POWER COMPANY

' r CATAWBA NUCLEAR STATION (i. HP/0/B/1009/17 j ENCLOSURE 5.3 j TAKING POST-ACCIDENT CONTAINMENT AIR SAMPLES s

Date/ Time / Unit

~

Check -

Action (SP) 5.3.1 Pour thiosulfate solution into the thiosulfate tank, located on top of the sample panel. Leave the cap off

. of the thiosulfate tank after transferring the thiosulfate -

1 solution (Refer to Section 5.2.3 for preparing more solution).

I

) (SP) 5.3.2 Attach an " Iodine Sample" bottle to the, sample panel by

, inserting the plastic hose into the bottle located on the lower left side of the panel. Disconnect the quick connect connector on the lower side of the sample panel

? and replace with a gas bomb.

l 5.3.3 Turn Key Lock switch (#48) to On.

t'~- 5.3.4 Turn Selector switch (#9) to System Purae.

5.3.5 Depress Activate pushbutton (#10).

, 5.3.6 Depress Evac pushbutton (#17) (Evac light should ,

illuminate) and watch the vacuum gauge (#6) drop to

-25" of Hz.

5.3.7 When the vacuum gauge (#6) reaches -25" of Eg, depress the Stop pushbutton (#19).

. 5.3.8 Press down the Gas Purge toggle switch (#16) and watch the vacuum gauge (#6) swiftly rise to +5" of Hg.

. 5.3.9 When the vacuum gauge (#6) reaches +5" of.Ha, return toggle switch (#16) to center position and depress the Stop pushbutton (#19).

5.3.10 Depress the Evac pushbutton (#17) and watch the vacuum
gauge (#6) drop to 0" of Ha.

I 5.3.11 When vacuum gauge (#6) reaches 0" of Ha, depress the Stop pushbutton (#19).

5 5.3.12 Depress Pump pushbutton (#18) and wait for thirty (30) y seconds.

\. .

5.3.13 Depress Stop pushbutton (#19). l 5.3.14 Press up the Gas Purre toggle switch (#16) and wait three (3) minutes.  ;

i I

7_ - -

($hm__

m h.I. , _ _ _ - .h . f. k -

e - - -

khk

_k -  :

6 z .f. ,

i 1 , ' ' .

4 1

Page 2 of 4 '

] DUKE POWER COMPANY i

i . CATAWBA NUCI. EAR STATION i (~ HP/0/B/1009/17

', ( '

ENCLOSURE 5.3 '

, i TAKING POST-ACCIDENT CONTAINHENT AIR SAMPLES i

. 1 Check Action

! --) ~~

. 5.3.15 Return the toggle switch (#16) to the center position.

's t

5.3.16 Turn Selector switch (#9) to Solution Chanseout. ~

t 5.3.17 Record the Radiation Monitor (#3) reading as a background

  • }
u. reference: R/hr -

y .

! j 5.1.18. Depress Activate pushbutton (#10). ,

j 5.3.1'9 Depress Flush pushbutton (#22) and hold five (5) seconds.

, s

i 5.3.20 . Depress h pushbutton (#23) and hold ten (10) seconds. '

i l- 5.3.21 Depress M pushbutton (#21) and hold for thirty (30) ,

seconds.

i i 5.3.22 Nove the Refill toggle switch (#24) to ON (up) position ,

l; and wait two (2) minutes and then move the toggle. switch

back to the off (down) position.

l (: , . . _

N 5.3.23 Turn Selector switch (#9) to Dilution Volume Evacuation.

> a' .-

l 5.3.24 Depress the Activate pushbutton (#10) and watch the vacuum

, , gauge (#6) drop to -25" of Ha. _ _ .

i 5.3.25 When the vacuum gauge (#6) reaches -25" of Ha, turn

, Selector switch (#9) to Sample Recire. ~

.t l 5.3.26 Depress Activate pushbutton (#10) and wait for five (5) l minutes.

$ 5.3.27 Record sample line temperature reading (#4): 'C e

5.3.28 Record sample inlet line pressure (psig) reading (#5): ,

! psig k '

5.3.29 Depress Sarmle pushbutton (fil) and wait for ten (10) 1

.. seconds. . _ _ . _ _

^~

i 5.3.30 Depress Trap pushbutton (#12) and wait for thirty (30) seconds.

I 5.3.31 Enter time of sample trap: (ex. 1355) 5.3.32 Turn Selector switch (#9) to Sample Dilution.

.i 5.3.33 Depress Activate pushbutton (#10).

) 5.3.34 Depress Slow pushbutton (#13) and watch the vacuum gauge (#6)

rise to 0" of Hz.

l .

1 e

, $hk!?l- h ft$f!Y$5Y h k N*I'*hk I -ll _

NY -

f N* N }

Page 3 of 4

  • DUKE POWER COMPANT .

CATAWBA NUCI. EAR STATION g EP/0/B/1009/17

( ENCI,0SURE 5.3 TAKING POST-ACCIDENT CONTAINMENT AIR SAMPLES 38 Check Action

, ~

5.3.35 When the vacuun gauge (#6) reaches 0" of Et, depress __the Stop pushbutton (#14).

s 2-5.3.36 Depress the Recire pushbutton (#15) and wait for five (5) minutes. '

(SP) 5.3.37 Disconnect the quick connect on the gas bomb outlet side, wait five (5) seconds and disconnect the gas bomb. _

l u Replace the quick connect connector.

I '

5.3.38 1 . Depress the Stop pushbutton (#14).

5.3.39 Turn Selector switch (#9) to Solution Chanacout.

5.3.40 Depress Activate pushbutton (#10).

~~

, ,' 5.3.41 Depress the TS Sample pushbutton (#25).

  • 5.3.42 Depress and hold the Emp_ty t pushbutton (#21) for five (5) 4 7 minutes. Thiosulfate should transfer into the TS sample 1 l bottle, w . _

5.3.43 Depress P3 pushbutton (#23) and hold thirty (30) seconds.

~

5.3.44 Depress TS Sample' Grab pushbutton (#26).

l j 5.3.45 Turn Selector switch (#9) to System Purne.

~

5.3.46 Depress Activate pushbutton (#10).

, 5.3.47 Repeat steps 5.3.6 through 5.3.15 as needed until no

~~ noticeable decrease is observed on the Radiation Monitor

-- - (#3) from one purge to the next. Check blank in steps 1

5.3.6 through 5.3.15 each time the step is perforue_d_,._

j 5.3.48 Record the Radiation Monitor (#3) reading: R/Hr 5.3.49 Turn Key Lock switch (#48) to Off.

~ ~ ~

(SP) 5.3.50 Disconnect and tightly cap the " Iodine Sample" bott1_e.

e e

4

_ _" _ _ . T l. ,

- , - - - ~ ~ ~ ~ ~ = - ' ' ' - '~ ' * ' ' ' ' ~ ~ ' ~ ' ' ' ' ' ~ ' ~~ ~~

- + ; -- ' ' e . . qw =., -. s ~~ . 1.& . , x . -

.u.  : .Q p., ~.;.y ..;;.., ~j e - V v...~4--

4 99A"s.g4.,j :. Y_.iyg g.;,j,prpf:.:p>;!"l1,:Ar;9".o..g;g;:.; gfca:

T. y ')y;-

a

.; ; . . , n ;.-? y ,, " .;,. a@g

! . Page 4 of 4 r

, DUKE POWER COMPANT

. CATAWBA NUCLEAR STATION 4 ( EP/0/B/1009/17 i

4

( '

ENCIDSURE 5.3 a TAKING POST-ACCIDENT CONTAINMENT AIR SAMPLES i .

j . Check Action t

3.3.51 Determine the Thiosulfate Sample Volume (TSV) and record 4

this value as TSV: el "

i.

j. . . . 5.3.52 Using standard chemistry laboratory techniques and under a sample hood, transfer 50 ml of the " lodine Sample
  • into the -

60 ml Nalgene bottle. Contact Radwaste Chemistry for i

. L.

instructi'ns o on disposal of excess sample.

) '

4 1

5.3.53 Place the 60 al " Iodine Sample" bottle and the gas bomb  ;

I d

into a shielded container as needed.

j l 5.3.54 Using a monitoring instrument (such as the R02A or.PIC-6A)

! ( _ _ _

take a contact dose rate reading on the top of the gas j i bomb and on the side of the " Iodine Sample" bottle:

a 1

R/hr gas bomb, R/hr " Iodine Sample" i

i I

?

4 5.3.55 Transfer the " Iodine Sample" and gas bomb to the Realth Physics Counting Room for isotopic analysis.

I  !

t.

1  : - -

i i

~

i

~-n .

1 I

( ._ ._ ,

h i

J .

4 5

1

! s i

4 6 I 4

e

g Ji i z ~ c. n - . . w ,..c g :,- a z . n . . ..c

y. C~ -' W ~r.." ' w %;ng p y.f5'%qv'J'\

. .w c., .m. , . 5y,~;k,pg;'v p y. $A 4;,,-

  • y ~ l~ ? "w- J.-+:,',' :. :~: . . .S * * . -*f4:t :; ;.;;},' *.~=::.Q

?_

^

Page 1 of 1 DUKE POWER COMPANY CATAWBA NUCLEAR STATION HP/0/B/1009/17

-( ENCLOSURE 5.4 SAMPLE OF POST-ACCIDENT CONTAINMENT AIR SAMPLE DATA SHEET Date/ Time: / Unit

') -

Prepared By: Emergency - Drill y - . .. .

(Circle One)

I . First Ra'diation Monitor Reading from 5.3.17 R/hr .o Sample Line Temperature from 5.3.27 *C Sample Inlet Line Pressure from 5.3.28 psig Sample Trap Time from 5.3.31

+ Second Radiation Monitor Reading from 5.3.48 R/hr

< Contact reading on gas bomb from 5.3.55 R/hr (Top)

Contact reading on " Iodine Sample" bottle from 5.3.55 R/hr (Side) i Containment Sample Volume --

293'K (14.7 psig + psis)

CSV = 1.4 al X _ _ .

} (273*C + 'C)'K 14.7 psig

= al at standard temperature and pressure

, Section volume of CSV trapped in " Iodine Sample" bottle -- ,

50 ml X 1.0101 = al SVI= al (CSV) X al (TSV) where: 50 mi sample size + Thiosulfate Sample Volume from 5.3.51

) e 1.0101 = 1 + .99, thiosulfate is 99% efficient for removing

, iodine Section volume of CSV trapped in gas bomb --

SVg= al (CSO X .009 m al

~

where: .009 = 100 al gas bomb + 11194 al vo1ume of dilution Station Health Physicist Date

)

  • w
o. s- -

eene.e, e e .es- . o - ww w +.oo.ee....s~-.-- ~-. .

. > . - - . . i, . c. .- -

. tis.p.y[; i  : s . "E.MSICW.;@M*:IN[~d

~,,- . .re;3 ;.y o za.%,NYM'*thD.; '.lif-WhW,fi. .:: 1.m g {.f

~M.
,:';'p:
~;;;;.

U: ."-N 05.t:.. ."" 'A -.m Sf/N ,+ih---'

l '

s

,Page l'of 1 ,

' ~

DUKE POWER COMPANY CATAWBA NUCLEAR STATION l  ; /~ -

EP/0/B/1009/I7 I

l s_

ENCLOSURE 5.5 l

, POST-ACCIDENT CONTAINMENT AIR SAMPLING SHUTDOWN I

4 Date/ Time / Unit - - -- -

Check Action

.i .

{ _. _ 5.5.1 MTurn Selector , switch (#9) to off.

~ '

~;

i; _ _ 5.5.2  : Turn Radiation Monitor (#3) Off. .

~ '-'

, _ . . . _ (SP) 5.5.3 Replace the top to th,e TS tank.

j turning handles one-quarter turn clockwise.

t 5.5.5 Request that Operations complete the Shutdown Section for Post-Accident Containment Air Sampling of procedure

. OP/1/A/6450/10 or OP/2/A/6450/10 (see Reference 2.4 or 2.5).

1 _.. _ ._ . _

_ _ 5.5.6 Notify Shift Supervisor of sampling completion and that

! the Na Analyzer used during sampling is not required for 1 s, sampling. 1 I

' { *.. :; . .:-

s. -

u

  • e .

2

.b e.

. _ . - .-..--m.

s * *'*

_=3 8

9 6

J

~

m- , .

/ 9 I

p 9

['

., N ( N $ $ $kb $ h N h h 5 h _h

-MbNkN 'bik$[ hikk. N f hh UShhh[f 1

t 1

Page 1 of 1 DUKE POWER COMPANY CATAWBA NUCLEAR STATION ,

( HP/0/B/1009/17

- N' ENCLOSURE 5.6

POST-ACCIDENT CONTAINMENT AIR SAMPLING CONTROL PANEL (PACP) DIAGRAM
1. - -

6 J

- ~ ~

(

.?

~

.i

'j t q __ - -mwm 1

I

-- m. .. -

~

l $$-.O 220 -

5:;O 24 O '5 O inertgas racire 9 se fr- 2 2,O - o00 1 - -- - .;

m m,0,bo,ao too J.

.i

== -.

r meram me.me i

3 5 ' C -- 2, o 23 0 -

fuset fuse 2 2 , 24 ,,,;

. a ma meias , , , _

OO ,

'o = 'ow 5 b j

27 o 2..._. o ,

l ett <> >

j l l

4, .

4g i RADIATIO *( *a, __

l -

MONITOR y O

E e

t s

4 e

6

  • + =. w &Nwoo a=cacpo .pt ve. + e --+s - - - - - -

. - - . . .. ;, e :.r , -s., - . = x ;:- y'. .:1; % ;.. - . .....c.,. . . .

y .: .

aw - ~ .a s ,...%....--

~;:~e TA.$_'6. ~,Y.-%V_?.$

gtUfT,.

_ .pVBUf=~. cy,-

-r'r% W,w;jT.

M["*9  ;@.'

f.

. . ,#"c?'T4,:

-$' - >;.O*!.;.

~

' ~~

_- i _~

I'^ *r F*+.. ..

" # N' 0 4 5-i 4

j ' '

Page 1 of 3 ,

DUKE POWER COMPANY CATAWBA NUCLEAR STATION HP/0/B/1009/17

'. '/- '

\-

ENCLOSURE 5.7

POST-ACCIDENTCONTAINMENTAIRSAMPLINGSAMPLEPANEL(PASP)DIAq#"

it i

i

! O -

i i

1 l l

\,/

,t j _ . _ _ - . _ _ _ . . _ . _ _ _ . . . _ . . . '

s ,.

1 t M i

l O 0 0- ~

j 08 2885 le .~

4 water air Inlet Inlet inlet I

) O O O ' __

08 1885 88 2 water alr valve j welwevelve O O

, e**Plo semple i telet outlet -

_ . _- . front -

.L_

i %7.

s .

O

  • T3 e*wle O I'#' O 75 O O T1

. Inlet eutget .

6 o-V a

e' -. ,

1m 8

e om.e

.%. e I

h e

e - .e -..~..-.,,._,q

\

1

.1 s

4 s

..r;,g - w- q:.y-e--s w.i + e ; .-: . . ,7 :: : ?.

. :.y:Om.

. 3.4.iX d*[8[di-74 -^ NY_It '7.i YN'*.2..25"*N1Is,s ?"GU.Y'N' q-2. EC. =? . . ;.u.: 1 ..' ' O " O[ *g:.,

' ' ', ? . , . ' s; i.. 4

',7N";. ...

t

s i

? ,

  • 1

~Page 1 of I  !

DUKE POWER COMPANY '

CATAWBA NUCLEAR STATION i

,r HP/0/B/1009/17 l g,

ENCLOSURE 5.8 '

i LOCATION OF PACP AND PASP l

1  : 88 i 1 1

l 1-..-_.-_.

4

?, .

l t

~'

1 )  :

I . Rx.#1 l

I

. ~

j - -

I.

4 L -

(  !

o i

L '

23a N Unit 1 PASP i '

i a N Unit 1 PACP ,

a

? .'~ 200

'1 b.

,,,,,, Unit 2 PACP p 24e Unit 2 PASP 3 _

~r "*

L '.

M

~ I

Rx.w2 1 i

I 1 l 1 . .

1 2 i

I

'I O

I I

e o 6

b I

b 1

, , , _ _ _ . _ _ _ . -._,.________.__,...,_-_,_-.-._.,_,m.,___,,__

I  ; 'Y h bh b. f h 'b t

Form 34731 (R346) *

(1) ID No.IE /0/B/1000/06 DUKE POWER COMPANY Change (s)_0 to

(__ PROCEDURE PROCESS RECORD 8

' Incorporated

, PREPARATION (2) STATION Catawba Nuclear 4 (3) PROCEDURE TITLE Energenev Equipinent Functional Check And Inventory I (4) PREPARED BY- -

8 o ') DATE 11-22-86 (5) REVIEWED BY DATE M' -N Cross Disciplinary Review By N/R yM (6) TEMPORARY APPROVAL (if Necessary) l l By (SRO) DATE

. By

  • DATE (7) APPROVED BY a* DATE 1

(8) MISCELLANEOUS V i Reviewed / Approved By DATE Reviewed / Approved By DATE (9)' COMMENTS (For procedure reissue indicate whether additional changes, other than previously approved changes, are included.

Attach additional pages,if necessary.) ' ADDITIONAL CHANGES INCLUDED. Oyes ONo

(10) COMPARED WITH CONTROL COPY DATE COMPLETION (11) DATE(S) PERFORMED 1

i

(12) PROCEDURE COMPLETION VERIFICATION I

i O Yes O N/A Check lists and/or blanks properly initiated, signed, dated or filled in N/A or N/R, as appropriate? '

O Yes O N/A Listed enclosures attached?

O Yes O N/A Data sheets attached, completed, dated and signed?

l Oyes O N/A Charts, graphs, etc. attached and properly dated, identified and marked?

0Yes O N/A Acceptance criteria met?

VERIFIED BY DATE 1

~.'13) PROCEDURE COMPLETION APPROVED DATE (14) REMARKS (Attach additional pages,if necessary.)

$$$!!$h_$$$bkNY? kE hhk-b?b khkk!l.$ h:b '5Y? kh5

' I 5

i

(~

' \.[

HP/0/B/1000/06 .

5 DOEE POWER COMPANT .

-.E . _ . _ . _ CATAWBA NUCLEAR STATION -- - - - - = _-

j j _' EMERGENCY EQUIPMENT FUNCTIONAL CEECE AND INVENT 0RT

?

_3g _._ .._1.0 _ PURPOSE _ _ . . . . . . _ _ _ .

- ~ ~

~~'~~^-~~~~~;-

A s

d_ .

. _ _ , _. .To 'proyide for the_ availability and readiness of Emergency Equipment.

~ ~ ~ 7~

_L.

2.0 REFERENCES

~

~ ~ - -

.i

~

I 2.1 ._RP/0/B/1005/.08;. Respirator Quality Assurance '-~'

. j j  ; 2.2 EP/0/B/1009/19; Emergency Radio System Operations, j { Maintenance and Communicationa 4

I 2.3 Catawba Nuclear Station Directive 2.11.13 _ . _ _ _ . _ _ .

if(

2.4 Catawba Nuclear Station Directive 3.2.2 . . - - .

{ . . _ .

i 2.5 Catawba Nuclear Station Directive 3.3.3 i

J 2.6 Catawba Nuclear Station Emergency Plan j g r~

~~

t 2.7 Catawba Nuclear Station Technical Specifications 6.3.1 ft}_.-

, 2.8 Duke Power Company Radio Operator's Manual r ,

~-

L 2.9 Maintenance of Silver Zeolite Air Sampling Cartridges Letter; I

File: CN-768.01 g.. . . _ . . . _ _ _ _. . . . . ..

3 2.10 10CTR 50 Appendix E -

4 . . .

f 2.11 Technical Manual for Groban. Gasoline Generators ___ _.

. L.-. - . - - . - - - _ - .-

l 2.12 Shelf-life of Health Physics Clothing; File: CN-766.00.

>  ! 3.0 LIMITS AND PRECAtTTIONS i

3.1 Operation of Portable Generators

3.1.1 Avoid operating the unit while hands are wet or whil'e j i standing in water.

, ,, 3.1.2 Generators shall not be started while equipment is plugged t

into generator.

l l 3.1.3 Low voltage rubber gloves should be worn while operating the generators. These gloves are stored with the

! J, _ -

. generators.

j l 3.2 Silver aeolite cartridges shall be discarded if the sesi has been I f broken.

i  ; ,

I

> f l -. _

+..

. h_.,M.. Nkh$Ahd$Abh. - kbIN'YI -

5 '

e .

.EP/0/B/1000/06 Page 2 of 7

.*~

v 3.3 Any radiation monitoring equipment (located in an emergency kit) that

-2 must be removed from service for any reason shall be replaced as soon as possible. -

l 3.4- Any emergency kit used during training or for drill purposes shall be reinventoried as soon as po'ssible. The individual responsible for the training or drill shall be responsible for inventory and : :: ' ~ ~ ~ ~ ~

restocking of all on-site hits.

~-

~

t ..e  :-

3.4.1;;

Off-site kita 'shall be reinventoried as above and a list of deviations shall be given to the Respiratory / Instrument- ..,

Calibration (R/IC) Supervisor. R/IC shall be responsible 1 .

for restocking off-site kits as soon as possible.

3 4.0 PROCEDURE j

4.1 Monthly Emergency Equipment Check / Inventory 4.1.1 Portable Generator Check 4.1.1.1 Portable generators shall be considered

acceptable for use if

4.1.1.1 The oil level is at an acceptable

{ ,_

level per Reference 2.11.

I  : "

r 4.1.1.2 The generator starts and runs for

at least 5 minutes.

a

~

4.1.1.3 The generator stabilizes after a '~

portable air sampler is plugged into each of the generator outlets.

' 4.1.1.2 ' If generator is acceptable, shut off generator *

! - - and remove any excess gasoline from the gas -

4 tank.

4.1.1.3 Document the operability of the generators in

, the appropriate column on the Monthly / Quarterly -

Emergency Equipment check Sheet (Enclosure 5.1). ~ ~

4.1.2 Two-Way Low Band FM Radios 4.1.2.1 1

t The radios shall be considered acceptable for use ift i

. 4.1.2.1.1 Each radio transaits a message to j another radio.

4.1.2.1.2 Each radio receives a message from J

f another radio.

t.

4.1.2.2 Document the operability of the radios is the appropriate area on Enclosure 5.1.

i i

,. .  ?*W SQhi W A $ GQl$5'NKkS M & hd$5 A WSS S % 2. 5..? $ % $ A G- V E $ ?

l, EP/0/B/1000/06

, 'Page 3 of 7 l

!  ; [' s *

(_

I i 4.1.2.3 Inoperable radios shall be removed from service.

t* Contact Toddville Communication Shop Planner g

, for instructions on disposition for repair.

i 4.1.3 Batteries j .

-4.1.3.1 All batteries shall be considered acceptable j --

for use if

)

4 '

4.1,.3.1.1 The battery tester needle indicates 4

" good" when the battery is tested.

4.1.3.1.2

~

The battery appears to be in good

}i - , physical condition (no dents, r j corrosion,etc.).

4

__1

4.1.3.2 Document battery check on Enclosure 5.1.

i a 4.1.4 Portable Survey Instruments 1

B 4.1.4.1 Portable Survey Instruments shall be considered acceptable for use if: ,

4.1.4.1.1 The instrument battery checks.

s .

O ~

/ 4.1.4.1.2 The instrument source checks in

(. ' accordance with the instrument's operation procedure.

4.1.4.1.3 The instrument has no apparent -

physical damage.

4.1.4.1.4 The instrument has been calibrated within 3 months +/- 7 days.

  • 4.1.4.2 Document the instrument's operability on Enclosure 5.1.

, 4.1.5 Portable Air Samplers i

i 4.1.5.1 Air Samplers shall be considered acceptable for j use it 1

4.1.5.1.1 The sampler operates when plugged l into an electrical outlet. 1 l , 4.1.5.1.2 The, calibration.date on the sampler i

c is current.

} .

, 4.1.5.1.3 The sampler has no apparent physical j . ,

damage.

1 l

)

I 4 '

E. _ .__ . . _ . ... _ .

.kk?N? 'N k hkYh5 fA ki k b - _ '.: __,' 'E l .  !

r

,EP/0/B/1000/06 -

i Page 4 of 7

,. f .

t *k , 4.1.5.2 Document the sampler's operability on Enclosure

. 5.1.

l 4.1.6 Respiratory Equipment k

4.1.6.1 Respiratory equipment shall be considered acceptable for use if:

} 4.1.6.1.1 The equipment is in accordance with j - -

.- criteria stated in Reference 2.1.

a

.' 4.1.6.1.2 The Emergency Self-Contained Breathing Apparatus (SCBA) are a

i available at the following locations:

i i

I,ocations Minieue Units i

) Control Room 2 Upper Personnel Estch 2 Iower Personnel Ratch 2 i

Esalth Physics Respiratory Storage Area 3 l j ,

4.1.6.1.3 Six large cylinders of breathing i  ;

air (minimum of six hours used for l

5 people) are located in the a.

Control Room along with 5 airline respirators and associated airline hoses.

i 4.1.6.2 Document operability of respiratory equipment l

, in accordance with Reference 2.1. .

i 4.1 Quarterly Emergency Equipment Inventory / Inspection 4

4.2.1 Emergency equipment kits shall be inventoried quarterly i

5 and after each use using the appropriate Emergency 1 .

Equipment Kit I.ist of Contents (Enclosures 5.4 - 5.13) 4.2.1.1 Consult the Emergency Equipment Kit I.ocation j

Sheet (Enclosure 5.2) for the locations of each kit.

4.2.1.2 Perfore monthly checks as in Steps 4.1.1, 4

4.1.3, 4.1.4, 4.1.5, 4.1.6.

]

  • i 4.2.1.3 The quarterly operability check on two-way low j ,

band radios shall be performed as follows:

4.2.1.3.1 Radios shall be checked from a

! ( point 10 miles from the plant in accordance with Reference 2.8.

1 I i

l .

I i

I

! +

4

^ : == = =

L.- ._-_-.-_,--_ - -. l

.; a.,,.- w,.y > c ; . . .O ; 4 .= - & . .. .. .. w-q. , .;w. m 6 .n1 -N ,.. . . "i4 g.;, f

..  ?.

, ~ %. p:.y.y .p. u. i 5..$f Wik_pu -

e.,yNh;MO. .^K.r,a. :'*e;j ,g 9.W 7Re .E.v& 4.1. . .n.

Q-@me- '

w . .

'. ~

,EP/0/B/1000/06 ,

i .

. Page 5 of 7 -

i .

/* .

V. 4.2.1.3.2 Contact shall be made from the. base li station in the TSC to each of the radios. .

i

j -

4.2.1.3.3 Each of the radios shall make contact with the base station.

u ., ,, _

l .

f -

NOTE: Base Call Sign - ENEB-778 1 i. . ,

, Radio Call Signs - IB36274 3

(Alpha, Bravo, Charlie,

  • Delta, Echo, Foxtrot) 4.2.1.3.4 Document operability of radios on j Enclosure 5.1.
4.2.1.4 . Perform a functional check of the dosimeter

, charger / reader. The charger is acceptable for use if the charger light illuminates.

4.2.1.5 Ensure that the leak and source check dates on j the dosimeters are current.

i-

... 4.2.1.6 Ensure that the TLD's are current. TLD's are j , changed in January and July i 1 month.

l 4.2.1.7 Ensure the Potassium Iodide tablets have not l

. exceeded their expiration date. (Reorder 2-87) j 4.2.1.8 Ensure the seal on the silver zeolite cartridge packet is not broken and the cartridges are not j damaged.

4.2.1.9 Ensure that all procedures are current with the i i

j Control Copy.

l 4.2.1.10 Ensure the flashlight bulb illuminates  !

l properly. l 3  ; 4.2.1.11 Check all protective clothing to ensure it has 1

not exceeded the recommended shelf-life per Enclosure 5.15.

l 4.2.1.12 Ensure that GNR-I canisters have not exceeded

! their expiration date.

e 4.2.1.13 Document any deviations on the Emergency

{ Equipment Deviation Authorization Sheet l

(Enclosure 5.14).

i i l 4

l l

ra - - - . . _.~.~,_.m.o _ , _ ,_._ ,._.. _

m. m..,,_,__,___-._,,,._,_,-._._,.-~_.m_,_.__.____

. [($[4$.'

- M Nf3 h8 [ k_ _ $ [ $ N N i> M [ [,1 [ k. )[ k - k i dI M N N F U[JN3h.h.

i

,HP/0/B/1000/06 ,

Page 6 of 7' fs. 4.2.1.14 The Technician shall sign off Enclosure 5.1 and forward to the Respiratory / Instrument Calibration (R/IC) Supervisor.

. 4.2.2 Weather Information Check 4.2.2.1 Quarterly a call shall be placed to the National Weather Service located in Columbia, SC at 803-794-2330 or 803-794-2593. If these numbers cannot be reached, an alternate number

, in Charlotte (704-399-6000) may be used.

Obtain wind direction, wind speed, and cloud

cover from one of these sources for the vicinity of Catawba Nuclear Station.

. 4.2.2.2 Obtain the same information from the Control Room.

4.2.2.3 Record this information on the Weather Information Form (Enclosure 5.3).

4.3 Deviation Authorization

^

4.3.1 The Station Health Physicist shall be made aware of any l

,. , deviation recorded on Enclosure 5.14.

. 4.3.2 The Station Health Physicist shall have evaluated the consequences the deviation may have upon the capability to respond to an emergency situation.

4.3.3 Enclosure 5.14 shall be used to state the action taken to remedy the deviation, and to state the justification for taking that action.

4.4 Upon completion of this procedure all required documentation will be filed in the Emergency Equipment Functional Check and Inventory

, Log, until the end of the quarter.

4.4.1 At the end o' f the quarter all of the required documentation

?

will be placed in the Health Physics Satellite Master File.

4 4.4.2 Sign off the PT printout and forward as per Reference 2.4.

i 5.0 ENCLOSURES j 5.1 Sample of Monthly / Quarterly Emergency Equipment Check Sheet i

5.2 ' Sample of Emergency Equipment Eit Location Sheet 1

5.3 Sample of Weather Information Form

(' 5.4 Sample of Recovery Kit List of Conta'nts l,

  • f 4
  • i

~

'~,2_, - :_L. ~ ~ ~ ' ' ' ~ .n "r; ~'~

--,. - - - < - - - - - - - - - - - " - - ~ ~

z - ua .a . - - --, + - r- -a - -.

. - n :, . , . . . . . . .- ~. . .-

-v. .  ::v. ..+ ;"

OME

" ke;W;.~ %5;). +. MEN

. ~,, q4pdy Em.: M .$P.->:v, m ;$ P*9.b[.u.cx.i.7'$306:q[y.W. ~? . w. c=; ;':%i' M' I i

' 'b48$fe-

' 'IP/0/B/1000/06

'Page 7 of 7

f. ,

!(, 5.5 Sample of Environmental Survey Kit List of Contents 5.6 Sample of Environmental Survey Kit List .of Contents (Helicopter)

I l 5.7 Sample of Personnel Survey Kit List of Contents -

? .

! 5.8 Sample of Personnel Survey Kit List of Contents (Evacuation j Facility) t ,_

  • 5.9 Sample of. Emergency Medical Kit List of Contents (First Aid Room)

. ~5 .10 Sample of Emergency Medical Eit List ,of Contents (Piedmont Medical 3

Center) t l~ 5.11 Sample of operations Support Center Kit List of Contents

~

5.12 Sample of Technical Support Center Kit List of Contents 5.13 Sample of Fuel Transfer Kit List of Contents i

s.

5.14 Sample of Emergency Equipment Deviation Authorization Sheet

! 5.15 Sample of Recommended Shelf-life for Protective Clothing j j 5.16 Sample of Protected Area Survey Kit List of Contents

' ~ .

a

+

i t

i

-t ,

f I

i B

~

1 .

( .'

s

' = *d t

e

+..:' . . ,T-. . . ~ ,n n ;.. ~ '

. w. , . . :pi 's .. . qa ~', . "

. '. %_,, . , . , n .r$35j'ME. S$Gi$.. SY.:

, . .~ u.;- ,.;'..y'*%**..R.

C'r; -+i.* . uO&:T?r:~- '

m'-$c?!r.* -

i Page 1 of 2

' CATAWSA NUCLEAR STATION .

HONTELY/ QUARTERLY IMERGENCY EQUIPMENT CHECK SMEET f MP/0/8/1000/06

g. ENCLOSURE 5.1 sn i.

N g g ,

>a w z a en w o i

' > - a m -

.e o N< m W e W k

.e .e N m u u <

u 3 f4 -

l  : - e n a w N >

n. w a e z e o - m - m 1

t u m < so o- w v o SIGNATURE /DATE I K=vironmental Survey Kit - A q

l Environmental Survey Kit - S l Environmental Survey Kit - C-

, Knvironmental Survey Kit - D'- '

e Environmental Survey Kit - E ,

- i i Racovery Kit '- Allen

~j - Recovery Kit - Transmission

~

Line Maint.

4 Recovery Kit - Security Pap Area t

~

,. Protected Area Survey Kit f~

i k_ sonnel Survey Kit -Allen Personnel Survey Kit - Transmission Lice Maint. --

i Parsonnel Survey Kit - Security Pap Area Emergency Medical Kit - First Aid .

i Roca i

Emergency Medical Kit - Piedmont Medical Center '

Operations Support Center Kit I

Tschnical Support Center Kit Fuel Transfer Kit e

l

/  :

\

~

S e

I

. . . . . .r..,,.. ., .. .e. a - s . . ,......s:

. .<.. . .c it x

(; - p 5'::..

, t,Alji(.s. .if./[fe%_ %..Qk. :rgt f gd_ tii;P97.$.+#;#S*t.g @f .-

~ ~

.m _. .

w.. .M.f-

- I, . m%y

- 8; W: : :.J

-:- - C ,'

" . 4 < 4M M i

. Page 2 of 2 4

HONTELY/ QUARTERLY EMERGENCY EQUIPMENT

! C CHECK SHEET EP/0/B/1000/06

k n ENCIASURE 5.1 GA30LINE GENERATORS

. .m - - _ . .

Generator Number Comments . Signature /Date_.

_ p . . -_._ . m__ _ _ _ _ . _ - _ _ . _ _ _ . .

___ CHP-3163-SR C

~

.l.___._

4

.CHP-3164 -SR _.____ . ____. ,

' ~ ~ '~' -~

~~~ ~ ~

CHP-3165-SR _ . , _ _ _ . _ .

' - ~ ~ ' ' ~ ~~'~

i' j.

CHP-3167-SR. _ . _

4

~ ~~ ~

.__.___. PORTABLE RADIO TRANSHITTER - RECEIVERS ~ ~ ~

l i ._ l

)

Radio Call Sign Comments Performed At Signature /Date 4 . , _ . _ _ _ . . _ _ . . _.. . _ _ , _ _ _

_ _ __ _ l l 10-Mile On Site ._-.. .

. _ _ . . . ~ .

~ ._ 1

, . . m cucY VAN (H.P.) - - - - - - - -- --- - -

EMERGENCY VAN (I&E) ,

y.___._._ . _ _ _

t 13250-- ~

j 2 BRAVO CHP-3249 -

CHARLIE CHP-3248 -

.2 - - - -

DELTA ~ CHP-3242- --

~ ' ' ~

i __ _.-

ECEC CHP-3247- -

~

FOXTROT- CHP-3243- - -

ALPHA CHP-3252---- -

BRAVO-1 CHP-3244 l

CHARLIE-1 CHP-3245 -

-l

'- - DELTA-1 CHP-3251 ECHO-1 CHP-3246

FOXTkOT-1 CHP-3253 1

.-m.*. - -*

. . vm.. ...w.......

..  :- . w

. . ~ .:. .. .e .. . a w -. .

. .*7.Wl.An.

,+.m..e.- n:.. . .n .2-wz@y  %. c is n, t2 %2*: ~ %. m'n .v.. W.=.? : K - ? ..L -

- J ' :' . " % %.h.-

CATAWBA NUCLEAR STATION EMERGENCY EQUIPMENT I4 CATION SHEET HP/0/B/1000/06

[~

t ENCLOSURE 5'.2

(

KITS LOCATION

-Recovery-Kitar-(4) '

Evacuation Facilities (2)

- ~

Allen Steam Station . .:-

Transmission Line Maintenance Building _

Security Pap Area -

Temp. Admin. Building.._ _. _

m - - . -

. Environmental Survey Kits (Vehicle) (4) Temp. Admin. Building ~~

- -- --Environmental-Survey Kit (Helicopter) (1) Temp. Admin. Building l Protected Area Survey Kit Auxiliary Building, _._ . _ .

Elev. 594 Roon 551 2-- ---

- Personnel Survey Kits- (4)

~~~ ~ ~ ~ ~ ~ ~

Evacuation Facilities (2) Allen Steam Station Transmission Line

~

- ~ ~ ~

Maintenance Building Security Pap Area Temp. Admin. Building Emergency Medical Kit (2)

Aux. Building First Aid Room Piedmont Medical Centef~~'

[ Operations Support Center Kit Operations Support Center

.i r-

~

Technical Suppczt Center Kit Technical Support Center

- - - - - - - -:- . - Fuel Transfer Kit- _ Temp. Admin. Building ~ ~ ~ ~- -

.ep. =* -e.-e -- m a_ _ _ w, e.- we4.D h '- --em. M e

g ---w..w- ...a. ear--%- .-. - .

o- . w o. e.,.,e mow.- - _m, . . , . .,

.p.Mm.ac.e, s+=- +eu. .- .-m.,

4.>=--.mehame

- e

} 9% m - .

b

=am

(

M:- - '.-=r'.......:--U-

  • 'i m ? t-D- '~
a1-x. ~:- ~~.- ~-

.n~-:;,4 'e,L.-~^ ;-:'."'i.:..

N ?.W y : . %v.f: &:::r:LfQ

= E,-li.'.:s.

-- - -i yc* .

~.: ~ - .a .  : . J . ~ '; ~ : w ' : . " ' : . . 1115:-

.m - .

..r i

e h

r. CATAWBA NUCIZAR STATION
hT.ATHER INFORMATION

,. \. EP/0/B/1000/06 j ENCI,0SURE 5.3 i

National Weather Service Control Room ' ~

Wind Directio'n i

Wind Speed _..

Cloud Cover --: .

~

Time ,.

t

'e 4

4 I

~

o' 1

. '( '

a -

Signature /Date s

e.

c' G

.j l

4

.- -. ,,, . - . . _ . , t - - - - . - - ,

W &.~. @;.(?%.ft.#W3.y;7f_RN. ;.QIMy.'M. I(f $U[Q%'. - f $CI ~1 V 5 YM . yNM

. s.FN.,M/> .- - -

CATAWBA NUCLEAR STATION '

RECOVERY KITS LIST OF CONTENTS HP/0/B/1000/06 f ENCLOSURE 5'.4 N

' MINIMUM ITEN AMOUNT List of Contents 1 ... ..

Eberline E-520 w/HP-270 Probe 1 Exempt Source 1 ,,_

Low /High Range Dosimeters (0-500 mR), (0-5R) 2 each'

~~

Dose Cards ~

25 TLD Badges 6

~~

Dosimeter' Charger-'

1 Boundary Ribbon or Rope (50 yd. roll) 1 Masking Tape'(roll) 1 Rain Suita (set) -

2 i Coveralls: Cotton 2 l

Gloves: Cotton (pair) 2 Rubber (pair) 2 i Shoe Covers: Disposable (pair) 2 l Rubber (pair) 2  !

Hoods: Cotton 2 l Poly Bags (Various) '

12 Caution Signs w/ inserts 2  !

Legal Pad 1 i

^[ Instrument / Smear Survey (psd) 1  ;

Pens 2

s, Grease Pencil and refills 1

-~ -' Full ~

Face Respiratior'With GMR-I Canister (or equivalent) 2 First Aid Kit

  • 1

~~

Potassium Iodide Tablets Trans. Line Maint. 275 bottles Security PAP 150 bottles

  • Construction Personnel Area 150 bottles Allen Steam Station 275 bottles KI Dist.ribution Data Sheet 100 Smears (box) 1 NuCon Seears 30 Flashlight 1 Batteries (Size D) 10 Scissors 1 l

1 Medication Envelopes Trans. Line Maint. 100 l Security PAP 60 Construction Personnel Area 60 Allen Steam Station 100

  • Crisis Management Team Phone Directory ** 1 SLED Badges (Personnel and Vehicle esch)** 100 Emergency PJanning Zone Maps ** 3 HP/0/B/1009/16 1

, ' *Any Deviations will be documented on the Emergency Equipment Deviation Authorization Sheet (Sample Enclosure 5.14).

    • These items are found only in the Recovery Kits located at Allen Steam Station and Transmission Line Maintenance Building.

Y

.3 ... , . . - , . . . . . . . . . . - -

.. -. .. . .  : m. .

,}.. . h,.,f,. , .855$*?d$. _ .h. ...4* 5"'A'O W ~5...,...t.-Y'Q20d -@':D'$_I >.'_5 " ' '_ O ^ a.g ? N ~ ~ ' $ ~ % ?'

Page I of 2, CATAWBA NUCLEAR STATION r ENVIRONMENTAL SURVEY EITS LIST OF CONTENTS

- ( HP/0/B/1000/06 ENCLOSURE 5.5 MINIM 21 S ---- --ITEM -- -

  • AMOUET l .:

List of Contents 1 -

I Eberline E-520 w/HP-270 Probe .

I

~~

= -

Eberline E-140N w/HP-210 Probe (or equivalent) 1 Exempt Source 1 -

Portable MCA** 1 -

Eberline PIC 6A 1 Emergency Radio Transmitter / Receiver 1

- Radeco H809V Air Sampler 1 Gasoline Generator (Gasoline in Safety Cabinet) 1 Low /High Range Pocket Dosimeter (0-500 mR), (0-5R) 2 each

Dose Cards 25 * ' ,

TLD Badge 6 Dosimeter Charger , 1 Full Face Respirator With CMR-I Canister (or equivalent) 2

} Potassium Iodide Tablets (bottle) 2 Tyvek Disposable Coveralls 6

,' Tyvek Disposable Hoods 6 s

i <

Coveralls: Cotton 4 i',, Gloves: Cotton (pair) 8 Rubber (pair) (Size 7), (Size 9) 2 each Shoe Covers: Disposable (pair) 4 Rubber (pair) 4 -

Hoods: Cotton 4 .:

Sandwich Bags (box) 1 Poly Bass (Various Sizes) 6

. Masking Tape (roll) 1 l Compass 1 .-4 -

Tweezers 1

) Limnological Sampler 1 -1

! Cubitainers 6 .

i I

I Liter Wide Mouth Bottles 5 -

Stopwatch 1

. Battery Operated Latern 1 a~ .

Flashlight 1 Batteries (Size D) 14 Batteries (9 volt) 4 Batteries (6 volt) 1 Silver Zeolite Filter Cartridges 30 _- .

Particulate Filters

~ 30 -.

Filter Cartridges Labels & Bags 100 Seears (box) 1 '

NuCon Seears 30 Instrument / Smear Survey (pad) 1 Map of Ten Mile Zone Sectors 1

( .

Legal Pad I l Pen 2 Permanent Marker 1

. _ _ , - , - - - v- m. __ __g , , . _ _

. j&~i?&lYN t . . _ _ _ '.?S$b@$5N$hhSNiNh?5?

IW'. : ? O : Y:W x-

^

Y?"

- i' '  !. n- kh

,Page 2 of 2 ,

CATAWBA NUCI. EAR STATION

['~ ENVIRONMENTAL SURVEY KITS LIST OF CONTENTSI

(, HP/0/B/1000/06 ENCLOSURE 5.5 i MINIMEM ITEM

~

  • AMOUNT Hand Spade Grease Pencil and refills
  • 1 1

[~ -

, . Dime Roll 1

~

Scissors 1

'~'..

' Rain Suits 3 Telephone location maps 1

~

Field Monitoring Data Sheet 20 Field Monitoring Work Sheet -

20 KI Tablet Distribution Data Sheet 1 Radio Operator Manual ~"

1 CPD1 Key 1

'. Emergency Response Van Keys (Doors, Ignition & Generator) 1 set SLED Badges (Personal - Vehicle) 4

- Reflective Safety Vests 2 +

HP/0/B/1005/04 1

' HP/0/B/1009/16 1

HP/0/B/1003/17 1

7 HP/0/B/1009/19 1

  • Any Deviations will be documented on the Emergency Equipment Deviation ~

Authorization Sheet (Sample Enclosure 5.14).

    • This Roominstrument is stored and maintained in the Health Physics Counting Area.

O w

i e

$ 'e I

J

, ;,?_955$$, .N$EY N5.5Y_5{$. A?$. h?. '~. ?N_t?'5S*W . l N:^

_ '$ ' - ~Y' !- :NNYb i o i CATAWBA NUCLEAR STATION ' ~

ENVIRONMENTAL SURVEY KITS LIST OF CONTENTS (Helicopter)

IP/0/B/1000/06 r'~ ENCLOSURE 5.'6 f \;;

i i

MINIMUM ITEM AMOUNT .

.L .. . - . - . - . . - .._. . .

~

[ -

List of Contents 1 _$_

i .

--Eberline PIC-6A 1

, ', Eberline E-520 w/HP-270 Probe 1  :

I  ; Exempt Source . 1 ':

7 Low /High' Range Pocket Dosimeter (0-500 mR), (0-5R) 2 each --

i Dose Cards ~

25 .

Field Monitoring Data Sheet 20

'. TLD Badge 6 - -

. Dosimeter Charger 1 j Full Face Respirator with GMR-I Canister (or equivalent) 2 -

,  ; Potassium Iodide Tablets (bottle) 2

!  : EI Distribution Data Sheet 1 -

j Stopwatch 1 1 i Flashlight 1 J -

Batteries (Size D) 10 i Batteries (9 volt) 4 Ear Plugs (pairs) 6

-l Map of Ten Mile Zone Sectors 1 Legal Pa.1 1

/. Pen '

2

, (,,

Rain Suits 2 j Instrument /Saear Survey (pad) 1 Emergency Radio Transmitter / Receiver 1

. FI/C/B/1G09/19 1 -

HP/0/B/1003/04 1 HP/0/B/1009/16 1

~~

k. _

i

  • Any Deviation will be documented on the Emergency Equipment Deviation t

Authorization Sheet (Sample Enclosure 5.14).

e D

.. .y N %.. y:y-- 7 NY-

  • LC%~tl1ty:._

. , . , ,,,.y. .m a lJ y..*l: ~ ~: .p.

-:1ff:;ty-- : ~%m.,

h; ^.

. . , ;. y .

.::s lW_ .2,.

_. '. [

~. ;, : .

8 *

- c. w

. 2 K'.r.- .

Page 1 of 2, CATAWBA NUCLEAR STATION e PERSONNEL SURVEY KITS LIST OF CONTENTS HP/0/B/1000/06 l k ENCLOSURE 5.7

'~' ~'~

MINIMUM

_ _ ITEM._ "

AMOUNT --" --

~.

List of Contents 1 Eberline E-140N w/EP-210 Probe (or equivalent)*** 2 ~ ~ ~ ~ ~...

Sample Slide Tray ***

  • 1 , .

Exempt Source- 1 .

Emergency Radio Transmitter / Receiver ** 1 Radio Operator Manual 1

Low /High Range Dosimeters (0-500 mR/hr), (0-5 R/hr) 2 each Dose Cards 25

- TLD Badges -

2 Dosimeter Charger 1 Full Face Respirator With GMR-I (or equivalent) 2 Potassium Iodine Tablets (bottle) 2 ,

KI Distribution Data Sheet 1 Coveralls: Cotton 6 Gloves: Cotton (pair) 6 Rubber (pair) 6 Shoe Covers: Disposable (pair) 6 Rubber (pair) 6

(, Hoods: Cotton 6 Boundary Ribbon or Rope (50 yd. roll) 1 Caution Signs w/ inserts 4 .

Masking Tape (roll) 1

~

Poly Bags (Various) 6 Smears (box) 1 NuCon Smears 25 Instrument / Smear Survey (pad) 1 Pens 2

Grease Pencil & Refills 1 Legal Pad 1 Scissors 1 Rain Suits 3 Decon Kit 1
1) Rad con
2) Rad Wash
3) Paper Towels
4) Scrub Brush
5) Cotton Swabs
6) Fingsrnail Clippers Phischez (125 al)

~ ~

7)

8) Rersonnal Decontamination Forms

-Batteries (Size D) 10 Station Directive 3.8.3 1 HP/0/B/1004/06 1

. HP/0/B/1009/05 1 0' HP/0/B/1009/16 1 ,

HP/0/B/1009/19** 1 l 1

1

,...-_m _ _ _ __ __ _. _ _ _ _ .

n 'g c-i y . . - = - r- -

.c

-. -x- . . , . - .: .-

- - . . ' ._ s.z.

- >,y%gx, 4_ .tg.r::c,;wp .:-;' n -e

..1 ;

a,:

. _ .c_x_:

.s.

. . . m, .t.rs;%

. o

~ -

e_  : p--. < . _ m..

?. --

v~ r: v. 4gu s.n.c -

' + ,

t d 3

Page 2 of 2  ;

CATAWBA NUCLEAR STATION l PERSONNEL SURVEY KITS LIST OF CONTENTS  !

T HP/0/B/1000/06

(, ENCLOSURE 5.7 i

I

, *Any Deviation will be documented on the Emergency Equipment Deviation ~~ ~ ~ ~ ~ ~

'-+

-- --- Authorization Sheet (Sample Enclosure 5.14).

, ***The Security PAP Area shall have (3) E-140N w/EP-210 Probe or equivalent ~~ ~

I


and Sample - Slide-Tray. l i -

-i- _. , ._

.. 1 i

.)

i 1 i t

i s ..  !

1 i

1 l r

s

,e

, i l a

~

.l 4

a J

-l 1

1 t

s_.

1

. . . . . . . . . ~ . . . -. _. . ..h .,:~'.~ ' wa .

i.D$l$l:*[:C'l'M-, , ,hW... .,l? A ~ ' ' ~i U ' " $;. . , w ..)!-Q j+?-l-( 'O L.

'~ "

"' A '; W t

CATAWBA NUCLEAR STATION PERSONNEL SURVEY KITS LIST OF CONTENTS

' (EVACUATION FACILITY)

HP/0/B/1000/06 c ENCLOSURE 5.8 MINIMUN j ITEM , AMOUNT.

~

4

, List of Contents 1 Eberline E-140N w/HP-210 Probe (or equivalent) 3 Exempt Source '

1 Low /High Range Dosimeters (0-500 mR), (0-5R) 4 each Dose Cards 25 i TLD Badges 4 Dosimeter Charger 1 Potassion Iodide Tablets (bottle) 2 II Tablet Distribution Data, Sheet

  • 1 Medication Envelopes 3 Coveralls: Cotton 6 Gloves: Cotton (pair) 6 Rubber (pair) 6 Shoe Covers: Disposable (pair) 6

, Rubber (pair) 6 Ecods: Cotton 6 Disposable Coveralls 40

, Boundary Ribbon or Rope (50 yd. rell) 1

[.U Caution Signs w/ inserts 4 Masking Tape (roll) 1 Poly Bags (Various) 6 Smears (box) 1 Instrument / Smear Survey (pad) 1 Pens .

2 Grease Pencil & Refills 1 Legal Pad 1 Decon Kit 1

1) Rad Con
2) Rad Wash

, 3) Paper Towels

4) Scrub Brush
5) Cotton Swabs
6) Fingernail Clippers
7) Phischez (125 al)
8) Personnel Decontamination Forms Scissors 1 Station Directive 3.8.3 1 Evacuation Personnel Dose Record 50 j Catawba Nuclear Station Telephone Directory 1 l

Batteries (Size D) 10 1 HP/0/B/1004/06 1  !

EP/0/B/1009/05 1 BP/0/B/1009/16 1 p

  • Any Deviation will be documented on the Emergency Equipment Deviation Authorization Sheet (Sample Enclosure 5.14).

og g

. .. , , , . , , . . . . , . .~ - , . . 'x. , . .. . . '.m ~ -. v.

,'"._.f$..h_ .

\

bi.;.%* ,P.\,;4C-W a -

i. .. . . . . - , . ....- .a.Q:] '- . *GlMi_'Q, r:  :'_* L *:': 6-::[y y , ' %'-

- - i~ ~

,._ u.-:M,%q,__'

9 CATAWBA NUCLEAR STATION EMERGENCY MEDICAL KIT LIST OF CONTENTS

  • TIRST AID ROOM

,e HP/0/B/1000/06

't - ENCLOSURE 5.9 1

a ITEM AMOUNT

~~ - - - -

__m.__ . _ _ _._ _ _.

List of Contents 1

i. Eberline E-140N w/HP-210 Probe (or equivalent) I j~ Exempt Source . 1 -

Poly Bass (various sizes) -

6 -

Seears (box) 1 i NuCon Seears 25 I Coveralls: Cotton 6 j Gloves: Cotton (pair) 6 Rubber (pair) 6

Shoe Covers
Disposable (pair) 6
. Rubber (pair) 6 -
Hoods: Cotton 6

. Rain Suits 2

! Tape, Radicactive Material 1

? Tape, Masking 2" 1

?

Tape, Duct 2" 1

Inr.trument/Sacar Survey (pad) 1 J Pens

' 2 Legal Pad 1

i Caution Signs w/ inserts s_ 3 i Radioactive Material Tags 50 Scissors 1

- Poly for Ambulances (bundles) 3 -

Batteries (Size D) 4 HP/0/B/1004/06 1 HP/0/B/1009/08 1 l Low Range Dosimeters (0-500 mR)' 2 l TLD Badges 2 i

  • Any Deviation will be documented on the Emergency Equipment Deviation

, Authorization Sheet (Sample Enclosure 5.14).

e 4

4 1

  • * * " w e
  • eu.lue -e ==.em.,

. IE N 5 ' M M$$[b'[ N.h $ dI N - _

'hkT k^. Mj.: 5 ;- O .c  :- -

~ I[N 5. '

i CATAWBA NUCLEAR STATION EMERGENCT MEDICAL IITS LIST OF CONTENTS' PIEDMONT MEDICAL CENTER r HP/0/B/1000/06

'; ~

ENCLOSURE 5.10 s .

g MINIMUM ITEM AMOUNT List of Contents 1 Eberline E-520 w/HP-270 Probe 1 Eberline E-140N W/21,0 Probe (or equivalent) 1 Exempt Source 1

- ~ #- - -

Poly Bags (variotis sizes) '

14 Smears (box) 1 NuCon Seears 25 "'-

Tape, Radioactive Material 1

. Tape, Masking 2" 2 Tape, Duct 2" 4 Instrument /Seear Survey (pad) 1 Caution Signs w/ inserts 5

, Rad Rope '

1 TLD Badges 10 Pocket Dosfmetert (0-500mR) 10 -

Dose Cards 15 Dosimeter Charger 1 Radioactive Material Tags 50

('

r

Floor and Vent Covering Disposable Coveralls 25 1

Disposable Shoe cover.s (pairs) 25 Disposable Hoods 10

, - Cubitainers 5 Decon Eit ~

1

1) Rad con
2) Rad Wash
3) Paper Towels *
4) Scrub Brush --
5) Cotton Swabs
6) Fingernail Clippers
7) Phischer (125 al)
8) Personnel Decontamination Forms Cotton Gloves (pairs) 50 Rubber Gloves (pairs) 20 Batteries (Size D) 8 Grease pencils (box) 1 -

Stanchions 4 Trash Receptacle 2 HP/0/B/1004/06 1 HP/0/B/1009/08 1

  • Any Deviation will be docus:ented on the Emergency Equipment Deviation

, Authorization Sheet (Sample Enclosure 5.14).

~m Qp**t-w Cr ec e W %g-O N gy e.De e- gr ww- et e e-+ w e

  • 1

} E 0.z.Jll.;k .[*I:f**.l5h'((lf:h ??k k ?b:- f f

.:w.5v..-- %-

  • E' Y $= ~ . I Y' s

=i< k l i .,

CATAWBA NUCLEAR STATION Page 1 of 2, OPERATIONS SUPPORT CENTER EITS LIST OF CONTENTS ~

HP/0/B/2000/06

, \

~. ENCLOSURE 5.11 i MINIMUM a _. . _ _ _ _ _ _ _ . .

ITEM AMOUNT - --

, List of Contents 1 Coveralls: Cotton

  • 40 - --

j -

Glovesf Cotton ~(pair) 40

{

Rubber (pair) -

40 Shoe Covers: Disposable (pair) -.~

40

. Rubber (pair) .

40

~ '

j Hoods: Cotton

  • 40 Full Face Respirators with GMR-I Canister (or equivalent) 10 Flashlights 11

! Batteries (Size D) 34 Batteries (9 volt) 20 i Eberline PIC 6A 5 RM-14 w/HP-210 Probe 1

} E-140N w/HP-210 Probe. (or equivalent) I j 1xempt Source 1

, Camera (Polaroid) 1 Polaroid Film Paes 2 Masking Tape (Roll)  ?.

Dosimeters (0-100R), (0-SR) 5

, Dose Cards 25

Dosimeter Charger 1

! r Small Sample Bottles or Medication Envelopes 10 4 !; Rain Suits 5 Poly Bags (various sizes) - 50 Radeco E809V Air Sampler 3 Silver Zeolite Filter Cartridges 30 '-

Particulate Filters 30 Filter Cartridge Labels 30 Potassium Iodide Tablets (bottle) 20 KI Distribution Data Sheet 10 HP/0/B/1004/06 1

~

Decon Kit 1

1) Rad Con ~~
2) Rad Wash i
3) Paper Towels
4) Scrub Brush I 4 5) Cotton Swabs '
6) Fingernail Clippers
7) Phischex (125 al)
8) Personnel Decontamination Forms Instrument / Smear Survey (pad) 1 Telephone 2 Post-Accident Containment Air Sampling Equipment Eit 1 Pen (box) 1 Grease Pencil (and refills) (box) 1 Extension Cord (50 ft.) 2

, . Extension Cards (25 ft.) 2 Stopwatch 2 Large Battery Lanterns (with 6 volt batteries) 4 Plant Drawings 1

-...e-e.a = . +e -

s

~~..-.c,.,..n . ,

.. .. * ~:.,--.. .& : . - -

e.l.lu. 5. . 4
..= r -~.

, T ...; O..;r

'..W iti N i f_f:. ? I': g..--:: i. ;*"*):r:

9-:' " .

u. -

~ ' a ^6_k . /

. ~ -'

.._' ! & th J' i

. Page 2 of 2.

CATAWBA NUCLEAR STATION

! ,. OPERATIONS SUPPORT CENTER KITS LIST OF CONTENTS l

t HP/0/B/1000/06 i

c ENCLOSURE 5.11 - - - -

i' a

____y g . . _ _ . _ _ _ MINIMUM - - - - -

~~

, OSC Response Personnel Dose Record Forms 125 l Smears (box) 1 I

i

..* *Any Deviation will be documented on the Emergency Equipment Deviation Authorization Sheet (Sample Enclosure 5.14).

4 1

4 s a

T i

' *~*

g . .

s..

~.-

I e. .

e b

8 l

'3 l

'l l

l 1

( -

~n

  • l l

b a 4

. .hi_Nk$_

n_ _.h_ h. N. Yh'SY'..^+h NY N$$, .'h

'N b - -- .

,?. s.. -

i .

i, h

Page 1 of 2

CATAWBA NUCLEAR STATION

~

TECHNICAL SUPPORT CENTER KIT LIST OF CONTENTS EP/0/B/1000/06 is[ '. - ENCLOSURE 5.12 l

! 3 i ,

. - - - - - - - MININUM - --

ITEM ~~ }~ ~ --~ ~ -~ AMOUNT -.

-)- .----- --

gg,g ,g Contents 1

} Coveralls: Cotton 20

~'" -

l Gloves: Cotton (pair) -

20

. Rubber (pair) '

20 i i Shoe Covers: Disposable (pair) 20

,  ! Rubber (pair) 20 4 j Hoods: Cotton 4

20 Full Face Respirators with GRM-I Canister (or equivalent) 6 Eberline E-520 w/EP-270 Probe 4

1 i Eberline PIC-6A 3 1 E-140N w/HP-210 Probe (or equivalent)

! j' Exempt Source 1

1 i

Radeco R809V Air Sample 1 i Dosimeter (0-100R), (0-!R) -

6 each l Dose Cards 25

?.

Silver Zeolite Filter Cartridges 30 1

t Particulate Filters

  • 30 Filter Cartridge Labels 25 i j Dosimeter Charger 1

j l (,'( Potassium Iodide Tablets (bottle) 25 j l v Boundary Ribbon or Rope (50 yd. roll) 1

, Caution Signs w/ inserts 3 j Rad Tape 2

Smears (box) 1 j

Poly Bass 6 Masking Tape (Roll) 1 Pen I 2 l Leg'al Pad -

1 i

Grease Pencil (and refills) 1 Flashlights 8

,  ; Batteries (Size D) 30

Batteries (9V) 12

' Small Sample Bottles or Medication Envelopes 10 l ,

Rain Suits 6 Decon Kit 1

1) Rad Con
2) Rad Wash

, 3) Paper Towels

4) Scrub Brush

)' 5) Cotton Swabs

6) Fingernail Clippers  ;

i

7) Phischex (125 al)
8) Personnel Decontamination Forms Instrument / Smear Survey (pad) , 1 Request for Exposure Extension Forms 15

[' Plant Drawings 1

' EP/0/B/1009/16 1 HP/0/B/1004/06 1

.J j

  • , i I

........ ~ . . . .. - -

.. . ,....- . a . . .. ., , .w -

- - -. , . : :.c 7 . : .- . - - - - - -^:

E'" $$ *. 'COf S$.; 6#~ n:a$g;= T ' '- :-

j...5,$N,Y:.YI[, hkI9IN.j. .[N8' M. -%

. -.-,b.

  • U "' ' ' ' 4 I" " ** "#' '

f . .. . ,

t Page 2 of 2.

CATAWBA NUCIZAR STATION

,.. TECHNICAL SUPPORT CENTER KIT LIST OF CONTENTS

/

e HP/0/B/1000/06 ENCLOSURE 5.12

  • Any Deviation will be docu ent m de on the Emergency Equipment Deviation s

Authorization Sheet (Sample Enclosure 5.14).

o --%em*w -- w a-.mee. ee-1 u 9

0 0 .

.s W

? e S

e

  • l, e

J e

D i

..M,.,

J ll ..

g &

O #*

4 e

i e

. a t

a 3

i e

i 1

1 i e

_o== -.--=..--e-

, <5;e??ll5 ',h.~ $' mt @~ h 5 Y

  • M-lv.W m., 1 -rr u s:  :.lr.h.E':y'? Y,

~ .

~a-'

W~ ~. - ^']

S W ;c::r..~ -

N5 ;

  • iD.w-mc:*,I v,

,Page 1 of 2 CATAWBA NUCLEAR STATION f~ FUEL TRANSIIR KIT LIST *0F CONTENTS

\ '

HP/0/B/1000/06

ENCLOSURE 5.13 i -

)

j MINIMUM  ;

l ITEM AMOUNT l

! 1 l List of Contents 1

! Shoe Covers:

Disposable (pair)

  • 20 Rubber (pair) 6 l Gloves: Cotton (pair) 20 l i Surgeons (box) 1  !

l Rubber (pair) 6 j j

Coveralls: Disposable 4 '

Cotton 6 Hoods 4

, Wet Suit 2 I l Hard Hat 3

, Full Face Respirators with GMR-I Canister (or equivalent) 2

, Radeco H809V Air Sampler 1 i Eberline E-140N w/HP-210 Probe (or equivalent) 1 -

l Eberline PIC-6A 1 Eberline E-520 w/HP-270 Probe 1 Exempt Source , 1

; Silver Zeolite Cartridges and Particulate Filters 10

- (C, Labels for Filters and Cartridges 10 Potessium Iodide Tablets (Bottle) 30 TLD Badge 5 Low /High Range Dosimeter (0-500 mR), (0-5R) 5 each -

Dose Card ~

25 Dosimeter Charger 1 )

Weather-Proof Caution Signs with Inserts 4 l Radioactive Waste Signs (4" x 6") 12 l Caution: Radiation / Radioactive Material Tags 12 50 yd. Roll of Barricade Tape (Magenta & Yellow) 4 i Step Off Pads 3  !

! Poly Bags 12 i Hand Gardening Spade 1 Wide Mouth Sample Bottles 4

,i Plastic Sample Bottles or Medication Envelopes 12 Kiswipes (box) 2

NuCon Smears 100 Copy of NAC-1 Drawings (Prints) 1 Copy of Loading and Unloading Instructions 1 Duct Tape (Roll) 2 Hasking Tape (1" and 2" Rolls) 1 each Contact Pyrometer with Probe 2 Safety Glasses 5 Binoculars 1

. Tool Kit 1

't Batteries (9 Volt) 4 Flashlights 2 Batteries (Size D) 18 Steno Pad with 2 Mechanical Lead Pencils 1 Pencil Refills 1 e

s -

v

. . . . . . ..:.... , . .. :; ., .. . . c,e p , . . a.

. .,4. . . .- u. . - .  :., ; . -- ;, w~ .

'- N %;;*

~ ~ '~; $.

_.. v.a

.$.?i7 @

  • 4.usRQ4fiQQ~: ':;.: it- ~^ *::) . .. .~:; . ' . f^ '
  • K ;a

.i .O. -

N' g a h

.Page 2 of 2

. CATAWBA NUCLEAR STATION y' .

FUEL TRANSFER KIT LIST'OF CONTENTS

\ HP/0/B/1000/06 ,

ENCLOSURE 5.13 MINIMUM ITEM AMOUNT i Grease Pencils 2 All Purpose Marker '

2

Scotch Tape Roll and Dispenser . 1 Roll of Dimes 1 Gasoline Generator (Gasoline Stored in Safety Cabinet) 1 Instrument / Smear Survey (pad) 1 HP/0/B/1009/16 1 4

1 1

j l

  • Any Deviation will be documented on the Emergency Equipment Deviation "

Authorization Sheet (Sample Enclosure 5.14).

l 4

1 Y- l 4

1 4

. . . . . ~ . . _ . _ . . _ . ._..~....a4 .. . , . . . . . . . ~ . . . . . . - . . . J,' .

.s ^ -

,  !?"

CATAWBANUCLEAS, 1ATION HP/3/5/1000/06 '

, J,7j Enclosure 5.14 ' *-

ENERGENCY EQUIPMENT DEVIATION AUTHORIZATION SHEET 'f;

)

  • 3 ,5

' O,'. $

ACTION TAKEN TO

'e DEVIATI0tl DESCRIPTION ~ KIT REMEDY DEVIATION ACTION JUSTIFICATION SIGNATURE DATE ,'s W o

1

.r ' y,,

, ..,1.

\' .

. {;; y l

t %,l 4; *

= . > :: ,

i

'h ;.

j ' .,< .

i I .

t s; L..

4 8 . , .

C' f

N 't 1,-

! 1 ,

1 3

t l.'

lfIC Sup3rvisor Date ',

!:ction Health Physicist Date I'; '

l i 473 f

,' f

,. . i .. .. .: . , m . e . . . . . n . .. ._ . -.

, -..e..

c- ...

. ..- . a '. w .e. ? '*; ', . . . ., d4

- .' '-L 2- w. : . w

".: _- Q ',~*. ' \ '.w'--J.st ~.. . _ ' _ . , _ _ .

r 2

.IP/0/B/1000/06 ,

ENCLOSURE 5.15 CATAWBA NUCLEAR STATION RECOMMENDED SHELF-LIFE FOR PROTECTIVE CLOTHING s

Cotton Goods: 4 years .

Tyvek Goods: 4 years Duraguard Goods: 4 years Rubber overshoes 4 years Vinyl Gl'ves: o 6 months Latex Gloves: 6 months PVC goods: 1 year NOTE: If the date marked on the protective clothing exceeds the allowable shelf-life, remove the protective clothing fron the emergency kit.

I t

i d

J s l

I s I

l

._.:^_ .-. . :" -

.,....~C' _ - . . '::= - -~~'Y__. ' '_L . _:' "-' =

~-~~---.

_,. . '  :. .*. .s.., .

.2 , . . '. . , . ~ ~

e J ^t i~' "~ NJ!'$. #ASE.'5,'$^.IYY;:. -, r . . .0 * ?A? ~ ' ' T ?' ~

3_ ' -

~

- ~

w:; . . .. . - - _

, l. 1 CATAWBA NUCLEAR STATION

  • PROTECTED AREA SURVEY KIT LIST OF CONTENTS

'- HP/0/B/1000/06 -

s ENCLOSURE 5.16

, ITEM MINIMUM AMOUNT List of Contents 1 Eberline R0-2A (or equivalent)' 2 Map of Protected Area 2 Emergency Radio Transmitter / Receiver i 2 e .

i [---

a 1

,1 I

2 I

i

  • Any Deviation will be documented on the Emergency Equipment Deviation Authorization Sheet (Sample Enclosure 5.14).

- . _ - - - _ _ _ _ _ _ _ -- _- . - _. _ _ __ =- .

r gpP REGULATORY INFORMATION D8STRIBUTION SYSTEM (R IDS)

ACCESSION NDR: 00424ivee t - DOC.DATE: 86/12/08 NOTARIZED: NO DOCKET #

FAC2L: 50-413 Catawba Nuclear Station, Unit 1, Duke Power Co. 05000413 l 50-414 Catawba Nuclear Station, Unit 2, Duke Power Co. 05000414 AUfiOR AFFILIATION AUTH.NAME

^

TUCKER,H.B. guke Power Co.

RECIP.NAME RECIPIENT AFFILIATION Record Services Branch (Document Control Desk)

SUBJECT:

Forwards Central Files version of revised emergency plan implementing proceddures, including HD/0/B/10009/04 re environ monitoring for emergency conditions within 10 mile radius.

DISTRIBUTION CODE: AX45D COPIES RECEIVED: LTR _ ENCL ___ SI ZE: Y TITLE: Emergency Plan or Implementing Procedures (Proprietary)

NOTES: LPDR 2cy s AMDTS to FSAR. ASLB icy. 05000413 LPDR 2cys AMDTS to FSAR. ASLB icy. 05000414 RECIPIENT COPIES RECIPIENT COPIES ID CODE /NAME LTTR ENCL ID CODE /NAME LTTR ENCL PWR-A PD4 LA $fy 1 1 PWR-A PD4 PD (fj 1 1 JABBOUR,K 1 1 INTERNAL: ADM/D 4&e 1 1 IE /DEPER/EPD $.L 1 1 IE7DEPER/ IRD jg7 1 1 REG FILES pp'g 1 1 NOTES: 3 3 TOTAL NUMBER OF COPIES REGUIRED: LTTR 10 ENCL 10

4

  1. preg 3 UNITED STATES

[ g NUCLEAR REGULATORY COMMISSION L :j WASHINGTON, D. C. 20355 January 7,1986

%.....,/

1 50 413/414 Catawba Nuclear Station MEMORANDUM FOR: Chief, Document Management Branch, TIDC FROM: Director, Division of Rules and Records, ADM ja .

SUBJECT:

REVIEW 0F UTILITY EMERGENCY PLAN DOCUMENTATION The Division of Rules and Records has reviewed the attached document and has determined that it may now be made publicly available, j Q ,_ s / f I * : )

Donnie H. Grimsley, Director DivisionofRulesandRecords/7gf.