Forwards Insp Rept 50-285/88-24 on 880725-28.Violations Noted
ML20207J586
Person / Time
Site: Fort Calhoun Omaha Public Power District icon.png
Issue date: 09/20/1988
From: Callan L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Morris K
OMAHA PUBLIC POWER DISTRICT
Shared Package
ML20207J589 List:
References
NUDOCS 8809280048
Download: ML20207J586 (2)


See also: IR 05000285/1988024

Text

- .-

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ _ _ _ _ _ _ _ _ _ - _ _ _ - _

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

_ _ _

,\\

=

Occumsnt Centains

'

SAFEGUARDS INFORMATION

.

,

-

SEP 2 01988

In Reply Refer To:

Docket:

50-285/88-24

Omaha Public Power District

ATTN: Kenneth J. Morris, Division Manager

Nuclear Operations

1623 Harney Street

[

Omaha, Nebraska 68102

'

Gentlemen:

This refers to the inspection conducted by Messrs. J. Kelly and R. Caldwell of

this office during the period July 25-28, 1988, of activities authorized by NRC

Operating License DPR-40 for the Fort Calhoun Station, and to the discussion of

our findings with Mr. W. G. Gates and other members of your staff at the

-

conclusion of the inspection.

'

The NRC inspectors reviewed certain areas of your physical security program.

Within these areas, the inspection consisted of selective examination of

,

procedures and representative records, interviews with personnel, and

i

observations by the NRC inspectors. The inspection findings are documented in

the enclosed inspection report.

j

During this inspection, it was found that certain of your activities were in

violation of NRC requirements.

Consequently, you are required to respond to

these violations, in writing, in accordance with the provisions of

Section 2.201 of the NRC's "Rules of Practice," Part 2 Title 10, Code of

Federal Regulations. Your response should be based on the specifics contained

in the Notice of Violation enclosed with this letter.

We have also examined actions you have taken with regard to previously

-

'

identified inspection findings. The stetus of these items is identified in

paragraph 2 of the enclosed report.

The material enclosed herewith contains Safeguards Information as defined by

10 CFR Part 73.21 and its dischsure to unauthorized individuals is prohibited

i

by Section 147 of the Atomic Energy Act of 1954, as amended.

Therefore, the

material, with the exception of the report cover page which is an inspection

summary, will gLt be placed in the Public Document Room.

RIV:SEPS:RPB

SEPS:RPB

C:SPES:RPB

C:RPB

DRSS

C:

/B

t

'

  • JAFKelly:gb *RAColdwell
  • RJEverett
  • BMurray

ALBangart

I TFW terman

f/[y88

9/l9/8d

/ /88

/ /88

/ /88

/ /8

1aY

4

i/19/88

  • previously concurred

y

i

880928c048 850920

PDR

ADOCK 05000285

ENCLORARE MMNS

Doc ment Contains

DON

UPON SEPARATION THIS

SAFEGUARDS INFORMATION

PAGE IS DECONTROLLED

i

-

-

-

-.

_

_ _ _ _

_ _ _ _ _ _ _ _ _ _ _ _ _

.___

-

i

,

,

'

ma!.a Public Power District

2

Should you have any questions concerning this inspection, we will be pleased to

discuss them with you.

l

l

Sincerely,

Ortrind NE""h

'

3, p. Ucac

L. J. Callan, Director

Division of Reactor Project,

,

Enclosures:

1.

Appendix A - Notice of Violation

2.

Appendix - NRC Inspection Report

50-285/88-24

cc w/out enclosures:

Fort Calhoun Station

ATTN:

W. G. Gates, Manager

P.O. Box 399

Fort Calhoun, Nebraska 68023

Harry H. Voigt. Esq.

LeBoeuf, Lamb, Leiby & MacRae

1333 New Hampshire Avenue, NW

Washington, D. C.

20036

Nebraska Radiation Control Program Director

bec copy of entire report:

RIV Security File

P. A, Starcher, RSGB/NRR

R. D. Martin, RA

R. L. Bangart, DRSS

Chief, RPB

Section Chief, SEPS:RPB

Security Inspector

Resident Inspector

SEPS:RPB File

G. F. Sanborn, EO

0. M. Crutchfield, NRR

bec copy of letter and inspection summary only w/766:

DRP

Lisa Shea, RM/ALF

Section Chief, DRP/B

RIV File

MIS

RSTS Operator

R. E. Hall, DR$$

Project Engineer, DRP/B

bec copy of letter and inspection sunnary only w/out 766:

DMB IE-04

DRS

P. Milano, NRR Project Manager