ML20207J586
| ML20207J586 | |
| Person / Time | |
|---|---|
| Site: | Fort Calhoun |
| Issue date: | 09/20/1988 |
| From: | Callan L NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Morris K OMAHA PUBLIC POWER DISTRICT |
| Shared Package | |
| ML20207J589 | List: |
| References | |
| NUDOCS 8809280048 | |
| Download: ML20207J586 (2) | |
See also: IR 05000285/1988024
Text
- .-
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ _ _ _ _ _ _ _ _ _ - _ _ _ - _
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
_ _ _
,\\
=
Occumsnt Centains
'
SAFEGUARDS INFORMATION
.
,
-
SEP 2 01988
In Reply Refer To:
Docket:
50-285/88-24
Omaha Public Power District
ATTN: Kenneth J. Morris, Division Manager
Nuclear Operations
1623 Harney Street
[
Omaha, Nebraska 68102
'
Gentlemen:
This refers to the inspection conducted by Messrs. J. Kelly and R. Caldwell of
this office during the period July 25-28, 1988, of activities authorized by NRC
Operating License DPR-40 for the Fort Calhoun Station, and to the discussion of
our findings with Mr. W. G. Gates and other members of your staff at the
-
conclusion of the inspection.
'
The NRC inspectors reviewed certain areas of your physical security program.
Within these areas, the inspection consisted of selective examination of
,
procedures and representative records, interviews with personnel, and
i
observations by the NRC inspectors. The inspection findings are documented in
the enclosed inspection report.
j
During this inspection, it was found that certain of your activities were in
violation of NRC requirements.
Consequently, you are required to respond to
these violations, in writing, in accordance with the provisions of
Section 2.201 of the NRC's "Rules of Practice," Part 2 Title 10, Code of
Federal Regulations. Your response should be based on the specifics contained
in the Notice of Violation enclosed with this letter.
We have also examined actions you have taken with regard to previously
-
'
identified inspection findings. The stetus of these items is identified in
paragraph 2 of the enclosed report.
The material enclosed herewith contains Safeguards Information as defined by
10 CFR Part 73.21 and its dischsure to unauthorized individuals is prohibited
i
by Section 147 of the Atomic Energy Act of 1954, as amended.
Therefore, the
material, with the exception of the report cover page which is an inspection
summary, will gLt be placed in the Public Document Room.
RIV:SEPS:RPB
SEPS:RPB
C:SPES:RPB
C:RPB
DRSS
C:
/B
t
'
- JAFKelly:gb *RAColdwell
- RJEverett
- BMurray
ALBangart
I TFW terman
f/[y88
9/l9/8d
/ /88
/ /88
/ /88
/ /8
1aY
4
i/19/88
- previously concurred
y
i
880928c048 850920
ADOCK 05000285
ENCLORARE MMNS
Doc ment Contains
DON
UPON SEPARATION THIS
SAFEGUARDS INFORMATION
PAGE IS DECONTROLLED
i
-
-
-
-.
_
_ _ _ _
_ _ _ _ _ _ _ _ _ _ _ _ _
.___
-
i
,
,
'
ma!.a Public Power District
2
Should you have any questions concerning this inspection, we will be pleased to
discuss them with you.
l
l
Sincerely,
Ortrind NE""h
'
3, p. Ucac
L. J. Callan, Director
Division of Reactor Project,
,
Enclosures:
1.
Appendix A - Notice of Violation
2.
Appendix - NRC Inspection Report
50-285/88-24
cc w/out enclosures:
Fort Calhoun Station
ATTN:
W. G. Gates, Manager
P.O. Box 399
Fort Calhoun, Nebraska 68023
Harry H. Voigt. Esq.
LeBoeuf, Lamb, Leiby & MacRae
1333 New Hampshire Avenue, NW
Washington, D. C.
20036
Nebraska Radiation Control Program Director
bec copy of entire report:
RIV Security File
P. A, Starcher, RSGB/NRR
R. D. Martin, RA
R. L. Bangart, DRSS
Chief, RPB
Section Chief, SEPS:RPB
Security Inspector
Resident Inspector
SEPS:RPB File
G. F. Sanborn, EO
0. M. Crutchfield, NRR
bec copy of letter and inspection summary only w/766:
Lisa Shea, RM/ALF
Section Chief, DRP/B
RIV File
MIS
RSTS Operator
R. E. Hall, DR$$
Project Engineer, DRP/B
bec copy of letter and inspection sunnary only w/out 766:
DMB IE-04
P. Milano, NRR Project Manager
ENCLOSURE CONTAINS
SAFEGLIARDS INFORMAil0N
UPON SEPARATION THIS
PAGE IS DECONTROLLED