ML20207H394

From kanterella
Jump to navigation Jump to search

Notice of Issuance of Amend 116 to License NPF-3
ML20207H394
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 08/19/1988
From: De Agazio A
Office of Nuclear Reactor Regulation
To:
Shared Package
ML20207H386 List:
References
TAC-66699, NUDOCS 8808260367
Download: ML20207H394 (2)


Text

'

7590-01 U. S. NUCLEAR REGULATORY COMMISSION TOLED0 EDIS0N COMPANY, ET AL.

DOCKET NO. 50-346 NOTICE OF ISSUANCE OF AMENDMENT TO FACILITY GPERATING LICENSE The U. S. Nuclear Regulatory Comission (the Comission) has issued Amendment No. 116 to Facility Operating License No. NPF-3, issued to The ToledoEdisonCompanyandTheClevelandElectricIlluminatingCompany(the licensee),whichchangedthelicenseandrevisedtheTechnicalSpecifications for operation of the Davis-Besse Nuclear power Station, Unit No.1 (the facility) located in Ottawa County, Ohio. The amendment was effective as of the date of its issuance.

The amendment changed a license condition and the Technical Specifications to revise the existing pressure temperature limits and extend the operation period of the limits up to 10 effective full power years; the amendment also approved revision of the existing surveillance capsule removal schedule.

The applicatien for the amendment complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Comission's rules and regulations. The Comission has made appropriate findings as required by the Act and the Comission's rules and regulations in 10 CFR Chapter I, which are set forth in the license amendment.

Notice of Consideration of Issuance of Amendment and Opportunity for Hearing in connection with this action was published in the FEDERAL REGISTER

$SDES$l828

, on May 4, 1988 (53 FR 15932). No request for hearing or petition for leave to intervene was filed following this notice.

Forfurtherdetailswithrespecttothisactionsee(1)theapplication for amendment dated March 30, 1988 as supplemented May 4,1988,(2) Amendment No.116 to License No. NPF-3, (3) the Comission's related Safety Evaluation dated August 19,1988and (4) +,he Environmental Assessment dated July 7, 1988 (53 FR 27095). All of these items are available for public inspection at the Com ission's Public Document Room, 1717 H Street, N.W., Washington, D.C., and at the University of Toledo Library, Documents Department, 2801 Bancroft Avenue, Toledo, Ohio 43606.

A copy of items (2), (3) and (4) may be obtained upon request addressed to the U. S. Nuclear Regulatory Comission, Washington, D. C. 20555, Attention:

Director, Division of Reactor Projects - III, IV, Y and Special Projects.

Dated at Rockville, Maryland this 19thday of August 1988.

FOR THE NUCLEAR REGULATORY COMMISSION AMad Albert W. De A azio, Sr. Project a er Project Directorate III-3 Division of Reactor Projects - III, i

IV, Y and Special Projects 1

- - -