REVISED OCTOBER 7, 1986 OPERATING DATA REPORT DOCKET NO.
50-334 REPORT DATE:
10/09/86 COMPLETED BY: P.A. SMITH TELEPHONE:
(412) 643-1825 OPERATING STATUS
- 1. UNIT NAME: BEAVER VALLEY POWER STATION, UNIT 1 Notes
- 2. REPORTING PERIOD: AUGUST 1986
- 3. LICENSED THERMAL POWER (MWt):
2660
- 4. NAMEPLATE RATING (Gross MWe):
923
- 5. DESIGN ELECTRICAL RATING (Net MWe):
835
- 6. MAX. DEPENDABLE CAPACITY (Gross MWe):
860
- 7. MAX. DEPENDABLE CAPACITY (Net MWe):
810
- 8. IF CHANGES OCCUR IN CAPACITY RATINGS SINCE LAST REPORT, GIVE REASONS:
- 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (Net MWe):
None
- 10. REASONS FOR RESTRICTIONS, IF ANY:
N/A THIS MONTH YEAR TO DATE CUMULATIVE
- 11. HOURS IN REPORTING PERIOD:
744.0 5831.0 90599.0
- 12. NO. OF HRS. REACTOR WAS CRITICAL:
169.8 3389.9 48990.9
- 13. REACTOR RESERVE SHUTDOWN HOURS:
0.0 0.0 4482.8
- 14. HOURS GENERATOR WAS ON LINE:
133.8 3351.3 47486.1
- 15. UNIT RESERVE SHUTDOWN HOURS:
0.0 0.0 0.0
- 16. GROSS THERMAL ENERGY GEN. (MWH):
170868.0 8220628.4 111244059.5
- 17. GROSS ELECT. ENERGY GEN. (MWH):
53360.0 2691910.0 35473310.0
- 18. NET ELECTRICAL ENERGY GEN. (MWH):
37570.0 2518060.0 33044363.0
- 19. UNIT SERVICE FACTOR: (PERCENT) 18.0 57.5 54.7
- 20. UNIT AVAIIABILITY FACTOR:(PERCENT) 18.0 57.5 54.7
- 22. UNIT CAPACITY FACTOR (DER): PCT 6.0 51.7 46.9
- 23. UNIT FORCED OUTAGE RATE: (PERCENT) 54.7 5.8 22.8
- 24. SHUTDOWNS SCHEDULED OVER NEXT SIX MONTHS (TYPE,DATE,AND DURATION OF EACH):
N/A
- 25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
N/A
- 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):
FORECAST ACHIEVED INITIAL CRITICALITY N/A N/A INITIAL ELECTRICITY N/A N/A COMMERCIAL OPERATION N/A N/A 8701070087 861008 PDR ADOCK 05000334 R
i
- REVISED - October 7, 1986 1
UNITSHUTIMVWNS ANDPOWER REDUCTIONS DOCKET No.
50-314 UNIT NAME BVPS Unit #1 DATF REPORT MONIH August COMPLETED BY P. A. Smith TELEF300NE _(412) 643-1825 m
b an w ao o O "
C.c 'j Licensee Cause, & Corrective-g a
4 No.
Date "o
%E E
3UE Event
!e E$
Action to S
a"3 E
6.E #
Report #
=3 kk
- Prevent Recurrt.nce
- eg e
a i
8 860801 S
435.7 C
4 N/A ZZ ZZ??ZZ Station shutdown for Fifth Refueling 9
86n818 F
161.4 B
9 N/A SE RECOMB Station remained shutdown following the Fifth Refueling Outage due to required modifications on the, Hydrogen Recombiner System.
Modifications were completed and the Station returned to service at 2310 hours0.0267 days <br />0.642 hours <br />0.00382 weeks <br />8.78955e-4 months <br /> on the 25th.
j 10 860826 S
13.1 B
1 N/A HA TUPI.IN At 1030 hours0.0119 days <br />0.286 hours <br />0.0017 weeks <br />3.91915e-4 months <br /> ~otithe 26th, the Station j
was taken off-line to perform the Turbine Overspeed Trip Test.
7-
~
The Station returned to service at 2337 hours0.027 days <br />0.649 hours <br />0.00386 weeks <br />8.892285e-4 months <br /> on the 26th.
l c
I
_2 3
4 f: F.nied
- Reasim:
Herhod:
1.slubis G Insaneisiims S-Sthedu8eil A Equipenent Failureil aplain) 1-Manual los Psepasaliam of Da8a H Maintenance or' Test 2-Manual Scree i ner) Sheces los I aens<c
(' Rtf ueling 3-Aueosatic Scras l.l sens Regi.=i ei I Hii sic INilRI G I! Nerulasing Resnicei'N' 4-centinued from trevious Month Hlbi f I
i O icsalos Tealnisig A ikense I xanienasi"
l 5-Reduction 9-Other 5
i AJnuneser.siive i
l
- t. U vsalianal I sinis il aplassel l'8/771 11 Othes il splains
' I shahel 1 Sasier S.me c i
j
.e FIFTH REFUELING STEAM GENERATOR INSPECTION During the Fifth Refueling Outage all three steam generators were 100% inspected using the MIZ-18 multi-frequency eddy current inspection _ equipment.
Initial i nspection sample of RC-E-1C resulted in Technical Specification inspection Category C-3.
Subsequent sample inspection of RC-E-1A and RC-E-1B also fell in the C-3 Catego ry.
These results required the inspection of 100% of all steam generator tubes in all three steam generators.
The results of these inspections and of tube plugging required after DCP 764 (Tube expansion at the first and second cold leg support plates) are as follows:
RC-E-1 A A total of 3,364 tubes inspected (24 previously plugged)
Row Column
% TWD
- Indication Location Notes 15 5
47 Support #1 Cold Leg Plugged TWD > 40%
21 8
45 Support #1 Cold Leg Plugged TWD > 40%
29 11 47 Support #1 Cold Leg Plugged TWD > 40%
29 13 43 Support #1 Cold Leg Plugged TWD > 40%
30 83 45 Support #3 Cold Leg Plugged TWD > 40%
33 78 42 Support #3 Cold Leg Plugged TWD > 40%
34 77 52 Support #1 Cold Leg Plugged TWD > 40%
42 30 52 Support #2 Cold Leg Plugged TWD > 40%
44 35 42 Support #2 Cold Leg Plugged TWD > 40%
45 56 50 Support #1 Cold Leg Plugged TWD > 40%
24 37 40
- 1 Antivibration Bar Plugged TWD > 40%
45 49
<20 Support #1 & 2 Cold Leg Six additional 45 57 0
None tubes plugged 41 66 0
None due to over 41 67 0
None expansion 39 71 0
None during DCP 764 31 81
<20 Support #1 Cold Leg execution.
Seventeen (17) tubes were plugged this outage bringing the total plugged in RC-E-1A to 41 tubes.
- TWD through-wall defect
f 1
i Sth REFUELING STEAM GENERATOR INSPECTION (Cont'd)
Page 2 R C-E-1 B A total of 3,386 tubes were inspected (2 tubes previously plugged)
Row Column
% TWD Indication Location Notes 40 45 53
- 3 Antivibration Bar Plugged TWD > 40%
32 17 51 Support #1 Cold Leg Plugged TWD > 40%
26 11 41 Support #1 Cold Leg Plugged TWD > 40%
25 9
49 Sup; art #1 Cold Leg Plugged TWD > 40%
25 11 45 Support #1 Cold Leg Plugged TWD > 40%
40 50 56
- 2 Antivibration Bar Plugged TWD > 40%
40 51 58
- 3 Antivibration Bar Plugged TWD > 40%
45 48 41 Support #1 Cold Leg Plugged TWD > 40%
32 79 45 Support #2 Cold Leg Plugged TWD > 40%
33 77
$1 Support #2 Cold Leg Plugged TWD > 40%
36 77 43 Support #1 Cold Leg Plugged TWD > 40%
31 79 43 Support #1 Cold Leg Plugged TWD > 40%
26 86 41 Support #1 Cold Leg Plugged TWD > 40%
15 90 47 Support #2 Cold Leg Plugged TWD > 40%
Fourteen (14) tubes were plugged this outage bringing the tctal plugged for RC-E-1B to 16 plugged tubes.
R C-E-1C A total of 3,381 tubes were inspected (7 previously plugged)
Row Column
% TWD Indication Location Notes 37 23 42 Support #4 Cold Leg Plugged TWD > 40%
41 28 42 Support #4 Cold Leg Plugged TWD > 40%
44 40 41 Support #3 Cold Leg Plugged TWD > 40%
32 78 40 Support #1 Cold Leg Plugged TWD > 40%
45 49 42 Support #2 Cold Leg Plugged TWD > 40%
24 87 43 Support #1 Cold Leg Plugged TWD > 40%
Six (6) tubes were plugged this outage bri ng i ng the total plugged in RC-E-1C to 13 tubes.
-