ML20207F730

From kanterella
Jump to navigation Jump to search
Forwards Monthly Operating Rept for Sept 1986 & Revised Operating Data Rept & Unit Shutdown & Power Reductions Rept for Month of Aug 1986
ML20207F730
Person / Time
Site: Beaver Valley
Issue date: 10/08/1986
From: Carey J
DUQUESNE LIGHT CO.
To:
NRC OFFICE OF RESOURCE MANAGEMENT (ORM)
Shared Package
ML20207F735 List:
References
NUDOCS 8701060210
Download: ML20207F730 (1)


Text

7/,

sh des

'A@

Telephone (412) 393-6000 N."o. c*o'x 4 Shippingport, PA 15077-0004 Octaber 8, 1986 Beaver Valley Power Station, Unit No.1 Docket No. 50-334, License No. DPR-66 Monthly Operating Report U. S. Nuclear Regulatory Commission Director, Office of lianagement Information & Program Control Washington, D. C. 20555 Gentlemen:

In accorda nce wi th Appendix A, Technical Specifications, the Monthly Operating Report is submitted for the month of September, 1986.

Enclosed also is a revised Operating Data Report and a revised Unit Shutdowns and Power Reductions Report for the month of August, 1986.

These revisions were made due to a decision to reclassify 27.7 hours8.101852e-5 days <br />0.00194 hours <br />1.157407e-5 weeks <br />2.6635e-6 months <br /> of outage time from Forced Outage Hours to Scheduled Outage Hours.

Al so, please find attached the results of the Fif th Refueling Steam Generator Tube Inspection in accordance with Surveillance Requirement 4.4.5.5, Technical Speci fications.

very truly yours,

8701060210 86 M

/

PDR. ADOCK 05000334 R

7 PDR J. J. Carey Vice President Nuclear Group TW Enclosures p

cc: NRC Regional Office King of Prussia, PA