NARRATIVE

SUMMARY

OF MONTHLY OPERATING EXPERIENCE SEPTEMBER 1986 September 1 Power level was being held at approximately 75%

through as core physics testing continued.

September 2 September 3 At 0629 hours0.00728 days <br />0.175 hours <br />0.00104 weeks <br />2.393345e-4 months <br /> a reactor trip, caused by the inadvertant actuation of Train A Reactor Trip Breaker Shunt Trip, occurred duri ng the tes ting of Train B's Reactor Protection Logic System. Reactor criticali ty was reestablished at 1424 hours, and the Unit was synchronized to the grid at 1610 hours0.0186 days <br />0.447 hours <br />0.00266 weeks <br />6.12605e-4 months <br />.

September 4 The Station was in operational Mode I with reactor through power at a nominal 100 percent with the Reactor September 11 Coolant System at a nonnal operating pressure and temperature.

September 12 At 2000 hours0.0231 days <br />0.556 hours <br />0.00331 weeks <br />7.61e-4 months <br />, on the 12th, Station cooldown toward through Mode 3 was initiated so that repairs could be performed September 13 on two Feedwater valves. The Unit was taken of f line at 2244 hours0.026 days <br />0.623 hours <br />0.00371 weeks <br />8.53842e-4 months <br /> on the 12th and entered Mode 3 at 0032 hours3.703704e-4 days <br />0.00889 hours <br />5.291005e-5 weeks <br />1.2176e-5 months <br /> on the 13th.

September 14 Repairs were completed at 1300 hours0.015 days <br />0.361 hours <br />0.00215 weeks <br />4.9465e-4 months <br /> and reactor startup was begun at 1555 hours0.018 days <br />0.432 hours <br />0.00257 weeks <br />5.916775e-4 months <br />. Criticali ty occurred at 1626 hours0.0188 days <br />0.452 hours <br />0.00269 weeks <br />6.18693e-4 months <br /> and the Unit was synchronized to the grid at 1756 hours0.0203 days <br />0.488 hours <br />0.0029 weeks <br />6.68158e-4 months <br />.

September 15 The Station was in Operational Mode 1 with reactor through power at a nominal 100 percent with the Reactor Coolant September 30 System at a ac mal operating pressure and temperature.

[ oho R

s .

b 1

r OPERATING DATA REPORT DOCKET NO. 50-334 REPORT DATE: 10/09/86 COMPLETED BY: P.A. SMITH TELEPHONE: (412) 643-1825 OPERATING STATUS

1. UNIT NAME: BEAVER VALLEY POWER STATION, UNIT 1 Notes
2. REPORTING PERIOD: SEPTEMBER 1986
3. LICENSED THERMAL POWER (MWt): 2660
4. NAMEPLATE RATING (Gross MWe): 923
5. DESIGN ELECTRICAL RATING (Net MWe): 835
6. MAX. DEPENDABLE CAPACITY (Gross MWe): 860
7. MAX. DEPENDABLE CAPACITY (Net MWe): 810
8. IF CHANGES OCCUR IN CAPACITY RATINGS SINCE IAST REPORT, GIVE REASONS:
9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (Net MWe): None
10. REASONS FOR RESTRICTIONS, IF ANY: N/A THIS MONTH YEAR TO DATE CUMUIATIVE
11. HOURS IN REPORTING PERIOD: 720.0 6551.0 91319.0
12. NO. OF HRS. REACTOR WAS CRITICAL: 672.2 4062.1 49663.1
13. REACTOR RESERVE SHUTDOWN HOURS: 0.0 0.0 4482.8
14. HOURS GENERATOR WAS ON LINE: 667.1 4018.4 48153.2
15. UNIT RESERVE SHUTDOWN HOURS: 0.0 0.0 0.0
16. GROSS THERMAL ENERGY GEN. (MWH): 1689361.0 9909989.4 112933420.5
17. GROSS ELECT. ENERGY GEN. (MVH): 552690.0 3244600.0 36026000.0
18. NET ELECTRICAL ENERGY GEN. (MWH): 518860.0 3036920.0 33563223.0
19. UNIT SERVICE FACTOR: (PERCENT) 92.7 61.3 55.1
20. UNIT AVAILABILITY FACTOR:(PERCENT) 92.7 61.3 55.1
21. UNIT CAPACITY FACTOR (MDC): PCT 89.0 57.2 48.7
22. UNIT CAPACITY FACTOR (DER): PCT 86.3 55.5 47.3
23. UNIT FORCED OUTAGE RATE: (PERCENT) 7.3 6.1 22.6
24. SHUTDOWNS SCHEDULED OVER NEXT SIX MONTHS (TYPE,DATE,AND DURATION OF EACH):

N/A

25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: N/A
26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):

FORECAST ACHIEVED INITIAL CRITICALITY N/A N/A INITIAL ELECTRICITY N/A N/A COMMERCIAL OPERATION N/A N/A

AVERAGE DAILi UNIT POWER LEVE1.

DOCKET NO. 30-33' UNIT 3'*~' S 'l:'i: *

- i l

DATE 10/8/86 )

l COMPLETED SY P. A. Smith TELEPHONE (412) 643-1825 MONTH SEPTIDGER DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL tMWe-Nets iMWe Net) 604 17 796 2 633 825 3

3 325 808 754 813 4

813 5 21 813 817 6 g 817 829 804 7 ,3 ,

821 8

24 817 829 9 ,, 800 I

10 821 ;g 808 II U y 800 3,

728 813 23 13 0 813 29 17 I4 30 783 15 721 31 829 INSTRUCTIONS On this format.!sst the average daily unit power lese! in MWe. Net far each day in the reporting mimth. Compute to the nearest whole mepwait.

(SU77)

i 1

T d

MAJOR MAINTENANCE
1. Repaired Feedwater Regulating Valve (FCV-FW-488)
2. Repaired Feedwater Isolation Valve (MOV-FW-154A) j 3. Replaced lower motor guide bearing on CT-P-1 A 1

I i

e I

I

)

i i ,

}

I l  !

! i i

t f

1 I

J

. - - -, . . , , - . . . , ~ . . . - - .-,----, - -- -.,,... - - - , . . - . . . - . , . . , , - - - - . - - - - - - - - - - ~ . . - . -

e i

l' UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-314 UNIT NAME BVPS Ussit #1 DATE 10/8/86 REPORT MONIH SEPTEMBER COMPLETED gy P. A. Saith ~

YELEPHONE (412) 643-1825 i

cm w no o O " ** 0 a'

e 0, t Licensee $^

No. Date "o $$ 3UE 4 Cause, & Corrective

(

"5 e Event !e S4 Action to Q

e $ f$" Report # e3 fS as g se ,x, o u Prevent Recurrence 11 860903 F 9.7 C 3 86-012 IA CETBRE During a Reactor Protection logic System Train B test, the Train A

(

Reactor Trip Breaker Shunt Trip Block was inadvertently activated. This caused a reactor trip at 0629 hours0.00728 days <br />0.175 hours <br />0.00104 weeks <br />2.393345e-4 months <br />.

The reactor was restarted at 1400 honra and the Unit-was synchronized to the grid at 1610. hours on the 3rd.-

i 12 860912 F 43.2 B 1 N/A CH VALVEI~

The Station was taken off line at 2244 hours0.026 days <br />0.623 hours <br />0.00371 weeks <br />8.53842e-4 months <br /> so that repairs could be

) ' perforened on two Feedwater valvera.

l Repairs were completed and the Station 4

returned to service at 1756 hours0.0203 days <br />0.488 hours <br />0.0029 weeks <br />6.68158e-4 months <br /> on 1

t the 14 th. '

l 1 z I: I.nied 3 4 Reasim: n.ched:

5 5theJu cil 8 1:shdus G Insisussiones A Filenemens failureli aplain) i-Manual leie Psepansi.ne os pasa -

B Mahetenene;e e t Tes8 2-Manual scree i nI') St. cess I.w I i..nsee i C Refuelias 3-Automatic Scram len' Rel"'813 H8888<I NilMI4; D NegeJasong Messeksom

! 4-continued From Frevious Month 014 11 I thiesatos Isainsig A 1.iioise I unsinatini; 5-Reduction i AJnionesse.aseve 9-other 3 i (, thiceaisimal I se..s il ap! mil I siphie 1 Smwbuisc j l'8/77) II(hlice ll spianel i,

-