ML20207G245

From kanterella
Jump to navigation Jump to search

Forwards Amend 49 to License DPR-45 & Safety Evaluation. Amend Revises Tech Specs Re Change of Functional Testing Frequency for Installed Area Radiation Monitors to Quarterly & Calibr Frequency to Once Per 18 Months
ML20207G245
Person / Time
Site: La Crosse File:Dairyland Power Cooperative icon.png
Issue date: 07/15/1986
From: Zwolinski J
Office of Nuclear Reactor Regulation
To: Taylor J
DAIRYLAND POWER COOPERATIVE
Shared Package
ML20207G249 List:
References
TAC-61138, NUDOCS 8607220741
Download: ML20207G245 (2)


Text

July 15, 1986 Docket No. 50-409 DISTRIBUTION,

("TocketFilei~

BGrimes NRC PDR JPartlow Mr. James W. Taylor Local PDR ACRS(10)

General Manager BWD#1 Reading RDiggs (w/TACS)

Dairyland Power Cooperative RBernero TBarnhart (4) 2615 East Avenue South DVassallo LJHarmon La Crosse, Wisconsin 54601 CJamerson WJones JStang CMiles, OPA

Dear Mr. Taylor:

OELD MJohns, R III ELJordan

SUBJECT:

FUNCTIONAL TESTING AND CALIBRATION FREQUENCY FOR INSTALLED AREA RADIATION MONITORS (TAC 61138)

Re:

La Crosse Boiling Water Reactor The Commission has issued the enclosed Amendment No. 49 to Provisional Oper-ating License No. DPR-45 for the La Crosse Boiling Water Reactor (LACBWR).

This amendment is in response to your application dated February 21, 1986.

The amendment provides that the functional testing frequency for installed area radiation monitors be changed from every two weeks to quarterly and the calibration frequency be changed from each refueling outage to at least once per 18 months.

A copy of our related Safety Evaluation is also enclosed. The Notice of Issuance will be included in the Comission's biweekly Federal Register notices.

Sincerely,

/s/JZwolinski John A. Zwolinski, Director BWR Project Directorate #1 Division of BWR Licensing

Enclosures:

1.

Amendment No.49 to License No. DPR-45 2.

Safety Evaluation cc w/ enclosures:

8607220741 860715 See next page PDR ADOCK 0500 9

(

PD#

l L:PD#1

/

DL:PD#

DBL D#1 DBL:PD#1 RFB cab @t3amersorf 9/JStang:hmc de d inas JZwolinski 5/5t/86 5/)o/86 ( 6 5/ #/86

/p/86

/g /86 1/l6/86

Mr. James W. Taylor Dairyland Power Cooperative la Crosse Boiling Water Reactor cc:

Fritz Schubert, Esquire Clarence Riederer, Chief Engineer Staff Attorney Wisconsin Public Service Dairyland Power Cooperative Commission 2615 East Avenue South Post Office Box 7854 La Crosse, Wisconsin 54601 Madison, Wisconsin 53707

~Roy P. Lessy, Jr.

O. S. Heistand Morgan, Lewis & Bockius

- 1800 M Street, N.W.

7th Floor North Receptionist

- Washington, D.C.

20036 Mr. John Parkyn, Plant Manager La Crosse Boiling Water Reactor Dairyland Power Cooperative P.'0. Box 275 Genoa, Wisconsin 54632 U.S. Nuclear Regulatory Commission Resident Inspectors Office Pural Route #1, Box 276 Genoa, Wisconsin 54632 Town Chairman Town of Genoa Route 1 Genoa, Wisconsin 54632 Chairman, Public Service Commission of Wisconsin j

Hill Farms State Office Building Madison, Wisconsin 53702 Regional Administrator, Region III U.S. Nuclear Regulatory Commission l

799 Roosevelt Road Glen Ellyn, Illinois 60137 i

I e

,---,,.,,,-,,--y yy.-----

,-r

,,e y,,

,-y-.c

,,,ww

,,.y,-,--,-e,--,

n w w..

%..,...e.,,_