ML20207G260

From kanterella
Jump to navigation Jump to search
Amend 49 to License DPR-45,revising Tech Specs Re Change of Functional Testing Frequency for Installed Area Radiation Monitors to Quarterly & Calibr Frequency to Once Per 18 Months
ML20207G260
Person / Time
Site: La Crosse File:Dairyland Power Cooperative icon.png
Issue date: 07/15/1986
From: Zwolinski J
Office of Nuclear Reactor Regulation
To:
Shared Package
ML20207G249 List:
References
NUDOCS 8607220743
Download: ML20207G260 (4)


Text

_ _

/

'o,,

UNITED STATES 8

NUCLEAR REGULATORY COMMISSION o

y WASHINGTON. D. C. 20555

~s...../

2 DAIRYLAND POWER COOPERATIVE DOCKET NO. 50-409 LA CROSSE ROILING WATER REACTOR AMENDMENT TO PROVISIONAL OPERATING LICENSE Amendment No.49 License No. DPR-45 1.

The Nuclear Regulatory Commission (the Commission) has found that:

A.

The application for amendment by Dairyland Power Cooperative (the licensee) dated February 21, 1986, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act),

and the Commission's rules and regulations set forth in 10 CFR Chapter I; B.

The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.

There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of 'ae public; and (ii) that such activities will be conducted in compliance with the Commission's regulations; D.

The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.

The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.

%[2NON

[

P

O :

2.

Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment and Paragraph 2.C.(2) of Provisional Operating License No. DPR-45 is hereby amended to read as follows:

(2) Technical Specifications The Technical Specifications contained in Appendix A issued October 31, 1969, with Authorization No. DPRA-6, as revised through Amendment No. 49, are hereby incorporated in the license. The licensee shall operate the facility in accordance with the Technical Specifications.

3.

This license amendment is effective as of the date of its issuance.

FOR THE NUCLEAR REGULATORY COMMISSION

~

I w

John Zwolinski, Director BWR P o,iect Directorate #1 Division of BWR Licensing

Attachment:

Changes to the Technical Specifications Date of Issuance: July 15, 1986

,.-y.-.-

r

-<-c--

.3w,-,--

t ATTACHMENT TO LICENSE AMENDMENT NO. 49 PROVISIONAL OPERATING LICENSE NO. DPR-45 DOCKET NO. 50-409 i

Revise Appendix A Technical Specifications by removing the pages identified below and inserting the attached pages. The revised pages are identified by the captioned amendment number and contain marginal lines indicating the area of change.

REMOVE INSERT 5-8 5-8 l

l 1

i

l I

I

~

g' MINIMUM FREQUENCIES FOR TESTING, CALIBRATING, AND/OR CHECKING OF INSTRUMENTATION - (cont'd)

Channels Action Minimum Frequency a

6.

Intermediate Range Test (10-10 and Prior to each reactor Channels 3 and 4) 10-5 amps; start up if test has not period *)

been performed within 30 days.

Check Once per shift when in service.

7.

Wide Range and Power Check by heat Monthly when in service.

Range (Channels 5, balance 6, 7, and 8)

Monthly when in service and A. Nuclear Instru-Test

  • prior to each reactor mentation & Auto-startup if test has not been natic' Gain Control performed within 30 days.

Sub-System.

B. Nuclear Instru-Check Once per shif t when in mentation & Auto-service.

matic Gain Control Sub-System.

C. Automatic Gain Calibration At each refueling outage.

, Control Sub-System NOTE: Testing of the Nuclear Instrumentation and Automatic Gain Control Sub-(

System shall be done concurrently.

8.

Full Scram Circuits Test for hot Once a month.

short by means of built-in i

test switch.

l i

9.

Area Radiation Calibration At least once per 18 months.

l Monitors Test Quarterly Check Daily I

I I

5-8 Amendment No. 36,49

_ -. _. _ - _