ML20207F535

From kanterella
Jump to navigation Jump to search
Forwards App to SALP Repts 50-282/86-01 & 50-306/86-01 for Dec 1984 - May 1986,summarizing 860820 Meeting.Changes Unnecessary Based on Formal Exchange of Info & Absence of Discrepancies
ML20207F535
Person / Time
Site: Prairie Island  Xcel Energy icon.png
Issue date: 12/17/1986
From: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Larson C
NORTHERN STATES POWER CO.
Shared Package
ML20207F539 List:
References
NUDOCS 8701060115
Download: ML20207F535 (2)


See also: IR 05000282/1986001

Text

,

_-____

Ah

'

<

-

,

DEC 171986

Docket No. 50-282

Docket No. 50-306

Mr. C. E. Larson

Vice President, Nuclear Generation

Northern States Power Company

414 Nicollet Mall

Minneapolis, Minnesota 55401

Gentlemen:

This refers to the NRC's Systematic Assessment of Licensee Performance

(SALP) 6 Board Report for the Prairie Island plant, and our meeting of

August 20, 1986, which discussed in detail the contents of the report.

Based on the formal exchange of information between our respective staffs,

and in the absence of verbal identification of discrepancies within the

report or formal written comments from you requiring resolution, no

changes to the SALP Board Report are necessary.

Enclosed, as an Appendix to the SALP Board Report, is a summary of our

meeting which includes names of those persons in attendance.

Issuance

of the Appendix serves as the final step in our SALP assessment process.

In accordance with Section 2.790 of the NRC's " Rules and Practice,"

Part 2, Title 10, Code of Federal Regulations, a copy of this letter

with the referenced attachments will be placed in the NRC's Public

Document Room.

No reply to this letter is required; however, should you have questions

on the conclusions reached by NRC, or on the Appendix to the SALP Report,

please let us know and we will be pleased to discuss them with you.

Sincerely,

O

eg10%h

g2

A

r

/

P

O

James G. Keppler

Regional Administrator

Enclosure: Appendix to

SALP 6 Board Report

Nc. 50-282/85001;

No. 50-306/86001

See Attached Distribution

RI L

RIII

RII

RI

RII

RIII

RI I

RIII

M 7>$

6 Mb

d

(4

the

he.S

Ldnjs a.1/jp

Jhckik

p ond

No

i Paperie}lo IJind

Davis

p

0

>7lpler

Yes

fiS j]

1/4 Sh

WU

yt(Si

12//*

1g

'

'

jo

,

t

JM b

SctfwE (SINz;

1

I

'

Ia%

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _- _ _ _ _ _ _ _ _ _ _

'

_

___

_

e

e-

,.

Mr. C. E. Larson

2

DEC 17 loss

Distribution

cc w/ enclosure:

E. L. Watzl, Plant Manager

DCS/RSB (RIDS)-

Licensing Fee Management Branch

Resident Inspector, RIII Prairie

Island

Resident Inspector, RIII Monticello

John W. Ferman, Ph.D.,

Nuclear Engineer, MPCA

L. W. Zech, Chairman

J. K. Asselstine, Commissioner

F. M. Bernthal, Commissioner

K. M. Carr, Commissioner

T. M. Roberts, Commissioner

NRR Project Manager

-H. L. Thompson, NRR

.J. Axelrad, IE

M. R. Johnson, IE SALP Coordinator

RIII PRR

RIII SGA

INP0

i

l

.

l

L