Forwards,For Info,Safety Evaluation Re BWR Owners Group NEDE-31096-P, Atws;Response to NRC ATWS Rule,10CFR50.62. Confirmation of Applicability of Topical Rept & Response to Listed Concerns Requested within 90 Days
ML20207F146
Person / Time
Site: Nine Mile Point, Hope Creek, 05000000
Issue date: 12/19/1986
From: Haughey M
Office of Nuclear Reactor Regulation
To: Mangan C
NIAGARA MOHAWK POWER CORP.
Shared Package
ML20207F049 List:
References
GL-85-06, GL-85-6, TAC-66573, NUDOCS 8701050464
Download: ML20207F146 (3)


Text

_ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _.

-o.

December 19, 1986 DISTRIBUTION:

6 NRC PDR Docket No. 50-410 Local PDR BWD-3 r/f EAdensam MHaughey EHylton Mr. C. V. Mangan RBernero Senior Vice President JPartlow Niagara Mohawk Power Corporation Edordan 301 Plainfield Road BGrimes Syracuse, New York 13212 Attorney, OGC ACRS (10)

{

Dear Mr. Mangan:

Subject:

10 CFR 50.62, ATWS Rule for Nine Mile Point 2 In accordance with 10 CFR 50.62(c)(6), licensees and applicants for boiling water reactor (BWR) nuclear power plants are required to submit sufficient information to demonstrate to thc Comission the adequacy of an alternate rod injection (ARI) system, a standby liquid control (SLC) system and a reliable reactor coolant recirculating pumps trip (RPT) system.

(

The staff has completed its review of licensing topical report NEDE-31096-P,

" Anticipated Transients Without Scram; Response to NRC ATWS Rule,10 CFR 50.62",

submitted by the BWR Owner's Group. NEDE-31096-P details conceptual designs to satisfy the 10 CFR 50.62 requirements for boiling water reactors. The staff's safety evaluation of that report is enclosed for your information.

Those licensees / applicants, who participated in the BWR owners group topical report, may reference the topical report in support of their plant specific sub-mittal. For the SLC system, they should choose one of the three alternatives and follow the conditions stated in the staff's SER. For the-ARI System, they may use the checklist (in Appendix A of the staff's SER) to address their design requirements.

For the RPT System, they should indicate whether their installed system is the same as the Monticello design or the modified Hatch design. The staff requires those utilities with other RPT designs to submit their schedule to upgrade their designs to either of the above approved designs or to demon-strate that their present design can perform its function in a reliable manner equivalent to the two approved designs.

Those licensee / applicants, who did not participate in the P.WR owners group topical report should submit detailed design infomation. The infomation should address every aspect in 10 CFR 50.62 " Rule Considerations Regarding Systems and Equipment Criteria" published in FEDERAL REGISTER Volume 49, No.

124 dated June 26, 1984, and Generic letter 85-06, " Quality Assurance Guidance for ATWS Equipment that is not Safety Related" Technical Specifications should be proposed for ATWS related components.

gM298sta8t!8lk i

Mr. C. V. Mangan Nine Mile Point Nuclear Station Niagara Mohawk Power Corporation Unit 2 CC:

i Mr. Troy B. Conner, Jr., Esq.

Regional Administrator, Region I Conner & Wetterhahn U.S. Nuclear Regulatory Commission Suite 1050 631 Park Avenue 1747 Pennsylvania Avenue, N.W.

King of Prussia, Pennsylvania 19406 Washington, D.C.

20006 Mr. Paul D. Eddy Richard Goldsmith New York State Public Serice Syracuse University Commission College of Law Nine Mile Point Nuclear Station -

E. I. White Hall Campus Unit II Syracuse, New York 12223 P.O. Box 63 Lycoming, New York 13093 Ezra I. Bialik Assistant Attorney General Mr. Pichard M. Kessel Environmental Protection Bureau Chair aad Executive Director New York State Department of Law State Consumer Protection Board 2 World Trade Center 99 Washington Avenue New York, New York 10047 Albany, New York 12210 Resident Inspector Nine Mile Point Nuclear Power Station P. O. Box 99 Lycoming, New York 13093 Mr. John W. Keib, Esq.

Niagara Mohawk Power Corporation 300 Erie Boulevard West Syracuse, New York 13202 Mr. James Linville U. S. Nuclear Regulatory Commission Region I 631 Park Avenue King of Prussia, Pennsylvania 19406 Norman Rademacher, Licensing Niagara Mohawk Power Corporation 300 Erie Boulevard West Syracuse, New York 13202 Don Hill Niagara Mohawk Power Corporation Suite 550 4520 East West Highway Bethesda, Maryland 20814

'- Information concerning compliance with 10 CFR 50.62 for Nine Mile Point 2 was submitted by you in the FSAR. That information is presently under review and the results of the staff's evaluation will be forwarded to you when the review is complete.

Your staff has indicated to us that Nine Mile Point 2 is part of the BWR owners group'for this issue. Therefore, Niagara Mohawk should review the enclosed SER for the BWR owners group topical report arld within 90 days of receipt of this letter you should confirm that the topical report is applicable to Nine Mile Point 2, address those concerns listed above for licensees / applicants who participated in the BWR owners group, and address any other plant specific con-cerns that relate to the topical report and/or SER.

This request for information was approved by OMB under clearance number 3150-0011.

Sincerely, Mary F. Haughey, Project Manager BWR Project Directorate No. 3 Division of BWR Licensing

Enclosure:

Safety Evaluation (AN0:8611030127) cc w/ enclosure:

See next page e_