r

  • LCA 141 Attachment B
  • Page 1 of 3 REACTIVITY CONTROL SYSTEMS CHARGING PUMPS - OPERATING LIMITING CONDITION FOR OPERATION 3.1.2.3 At least one charging pump in the boron injection flow path required by Specification 3.1.2.1 shall be OPERABLE and capable of being powered from an OPERABLE emergency bus.

APPLICABILITY: MODES 5 and 6.

ACTION:

With no charging pump OPERABLE, suspend all operations involving CORE ALTERATIONS or positive reactivity changes until one charging pump is restored to OPERABLE status.

SURVEILLANCE RE0VIREMENTS 4.1.2.3 The above required charging pump shall be demonstrated OPERABLE by verifying, that on recirculation flow, each pump develops a differen-tial pressure of >2400 psid when tested pursuant to Specification 4.0.5.

TROJAN-UNIT 1 3/4 1-11 Amendment No. 7#,

8607220464 DR 860717 ADOCK 05000344 PDR

. LCA 141 Attachment B

. Page 2 of 3 REACTIVITY CONTROL SYSTEMS CHARGING PUMPS - OPERATING LIMITING CONDITION FOR OPERATION 3.1.2.4 At least two charging pumps shall be OPERABLE.

APPLICABILITY: MODES 1, 2, 3, and 4.

ACTION:

With only one charging pump OPERABLE, restore at least two charging pumps to OPERABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> or be in HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />; restore at least two charging pumps to OPERABLE status within the next 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> or be in COLD SHUTDOWN within the next 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.

SURVEILLANCE REQUIREMENTS 4.1.2.4 At least two charging pumps shall be demonstrated OPERABLE by verifying, that on recirculation flow, each pump develops a differential pressure of >2400 psid when tested pursuant to Specification 4.0.5.

i TROJAN-UNIT 1 3/4 1-12 Amendment No. 74,

LCA 141 Attachment B Page 3 of 3 EMERGENCY CORE COOLING SYSTEMS SURVEILLANCE REQUIREMENTS (Continued)

i. By verifying that each of the following pumps develops the indicated differential pressure on recirculation flow when I tested pursuant to Specification 4.0.5:
1. Centrifugal charging pump 22400 psid
2. Safety injection pump 21455 psid
3. Residual heat removal pump 2157 psid l TROJAN-UNIT 1 3/4 5-6a Amendment No. 74 June 10,1982 l

l