. _ _ _. _ _ _ _ _ _ _ _ _ _ _ _ - - _ _ _ _ _
. 4 Alabama Power Company 600 North 18th Street Post Office Box 2641 Birmingham, Alabama 35291-0400 Telephone 205 250-1835 AlabamaPower R. F. Mcdonald thesouthem ekK;trcsystem Senior Vice President December 23, 1986 Docket No. 50-364 Director, Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, D.C.
20555 i
Attention:
Mr. L. S. Rubenstein Gentlemen:
Joseph M. Farley Nuclear Plant - Unit 2 NUREG-0737, item II.K.3.17 Report on Outages of Emergency Core Coolng Systems (ECCS)
By letter of February 13, 1981, Alabama Power Company committed to report to the NRC every five years the results of Alabama Power Company's review of the Unit 2 ECCS outages which resulted in limiting conditions for operation as defined by the Technical Specifications.
Attached is the required listing of Unit 2 ECCS outages since May 1, 1981.
It should be noted that outages of ECCS equipment during modes of operation in which this equipment is not required by Technical Specifications are not included in this report.
If you have any questions, please advise.
Respectfully submitted, hv R. P. Mcdonald s
RPM / JAR : dst-D-T.S.4 Attachment l
cc: Mr. L. B. Long Dr. J. N. Grace Mr. E. A. Reeves datjg Mr. W. H. Bradford
( I 9612310058 861223 PDR ADOCK 05000364 PDR R
bc:
Mr. W. O. Whitt Mr. W. G. Hairston, III Mr. K. W. McCracken Mr. J. D. Wooda rd Mr. J. W. McGowan Mr. C. D. Nesbitt Mr. R. G. Berryhill Mr. D. E. Mansfield Mr~ J. A. Ripple Mr. J. K. Osterholtz Mr. J. T. Brantley Mr. D. E. Dutton Mr. J. R. Crane Mr. K. C. Gandhi L
'1 LISTIIE OF ECCS GNRGES Start of Event End of Event Duration Time Date Time Date System (Hours)
Cause and Corrective Action 1050 6/10/31 1458 6/12/81 IBIST 52.1 "A" and "B" Train IBIST level switches deenergized for replace-ment and recalibration.
1050 6/22/81 133J 6/22/81 BIT 2.67 Voluntarily opened supply breaker to NOV 8801B to repair IECB indication for "B" train BIT outlet.
0958 6/24/81 1006 6/24/81 Chg. Pump
.13 Loss of suction on 2B charging pump due to VCT outlet valve-being closed._ Reopened valve and started charging pump.
1825 8/1/81 0510 8/2/81 ItiST 10.75 ItiST Level indicator failed high due to moisture entering suction transmitter junction box. Box was dried out and sealed.
1830 8/6/81 0800 8/8/81 ItiST 13.5 IBIST Ievel indicator failed high. CPt drift in transmitter, transmitter.recalibrated.
0045 8/9/81 1330 8/9/81 BIT 12.75 "A" Train BIT heat tracing tagged out for maintenance.
1245 8/18/81 1300 8/20/81 ItiST 48.25 ItfST IAvel indicator failed high. Replaced D.C. Amplifier and calibration cards in level transmitter.
2300 8/20/81 1335 8/21/81 BIT 14.58 "A" Train BIT heat tracing supply breaker tripped due to faulty ground connection on the power supply transformer.
Connection repaired - BIT heat tracing was returned to service.
2035 9/2/81 2108 9/2/81 RHR
.5 2B RHR pump removed front service for surveillance testing.
0000 9/18/81 0930 9/18/81 Og. Pump 9.5 2A Charging pump removed front service for work to be performed on CCN System.
0335 9/19/81 0440 9/19/81 RHR 1.05 2A IUR pimup removed from service to perform STP-ll.9.
1325 9/19/81 1335 9/19/81 NIR
.17 2A IUR ptamp removed from service to perform STP-11.9.
1-
no
- LISTDE OF ECCS GJmGES Start of Event End of Event Duration Time Date Time Date System (Hours)
Cause and' Corrective Action l
2345 11/5/51 2358 11/5/51 Chg. Ptaup
.25 2C Charging pnp breaker racked out for mad *=amara.
l 0410 11/16/81 0425 11/16/91 RER
.25 28 RER pump racked out for meggering.
0555 11/16/B1 0608 11/16/81 IUR
.25 2A RER pump racked out for meggering.
1020 11/17/81 1030 11/17/81 RER
.17 2A RER puq removed from service to perform STP-ll.8.
f 1032 11/17/81 1045 11/17/81 RER
.18 2B RER pump removed from service to perform STP-11.8.
0921 11/24/81 1410 11/24/81 RER 4.8 2A RER Train removed from service to perform LLRT on CDIT sump recirculation line.
1435 11/24/81 1915 11/24/81 RHR 4.67 2B RER Train removed from service to perform LIJtT on CTffr sump recirculation line.
1239 12/10/81 1301 12/10/81 Chg. Pump
.33 2C Charging paup removed from service to perform STP-4.3.
0930 12/24/81 0943 12/24/81 RER
.22 2A RER pump removed from service to perform STP-11.9.
0944 12/24/81 0953 12/24/81 RHR
.1 2B RER pmp removed from service to perform STP-11.10.
1615 12/28/81 1634 12/28/B1 BIT
.33 "A" Train BIT heat tracing inoperable due to blown control power fuse. The fuse was replaced and the "A" Train BIT-heat tracing was returned to service.
0945 1/12/82 1404 1/12/82 IBIST 4.33 EWIST level indicator LI4075B failed low. The==M diaphra p on LS 504 ruptured due to freezing. Replaced level switch and returned instrumentation loop to service.
2
a 1
i
~
i i
l LISTING OF ECCS OUIEES l
Start of Event End of Event Duration Time Date Time Date System (Hours)
Cause and Corrective Action 0915 1/11/82 1215 1/12/82 BIT 27.0 Boron concentration in BIT below Tech. Spec. minimuun due to inadvertent safety injection. Boric acid batched to raise concentration.
1456 2/21/82 1536 2/21/82 RHR 0.67 2A RHR pump removed from service for lubrication.
1340 2/22/82 1432 2/22/82 RHR 0.87 2B RHR pLnp removed from service for lubrication.
2308 2/28/82 1955 3-1-82 BIT 21 Boron Concentration in BIT out of spec low due to safety injection. Boric acid batched to raise concentration and the boron concentration was returned to minimum Tech. Spec. req.
2040 3/2/82 0134 3/3/82 Chg. Pump 4.9 2A Charging pump removed from service for lubrication.
0215 3/18/82 0625 3/19/82 BIT 28.2 "A" Train BIT heat tracing inoperable due to the failure of two circuits caused by heat build up in the electrical cabinets. The P/C controller cards were replaced.
0445 3/19/82 0505 3/19/82 RHR
.3 2A RHR pump removed from service to perform STP-il.1.
1630 3/22/82 1645 3/22/82 Chg. Pump
.3 2A Charging pump removed from service for testing.
0820 3/23/82 0907 3/23/82 RHR
.75 2A RHR pump removed from service to perform STP-ll.9.
1635 3/23/82 1655 3/23/82 RHR
.3 2B RHR pump removed from service to perform STP-11.10.
3 1025 3/29/82~ 1105 33T/82 Chg. Pump
.7 2A Charging pump removed from service for testing.
3 s
s s-4
3 LISTING OF ECCS OUIAGES Start of Event End of Event Duration Time Date Time Date System (Hours)
Cause and Corrective Action 1815 4/8/82 1830 4/8/82 RHR
.25 2B RHR pump removed from service for testing.
0007 4/19/82 0135 4/19/82 Chg. Pump 1.5 2A Charging pump removed from service to perform STP-4.4.
0130 4/20/82 0520 4/20/82 RHR 3.8 "A" and "B" Trains of the RHR system removed from service one at a time to perform STP-ll.6.
0530 4/23/82 0545 4/23/82 RHR
.25 2A RHR pump removed from service to perform STP-ll.9.
0600 4/23/82 0610 4/23/82 RHR
.15 2B RHR pump removed from service to perform STP-11.10.
0825 5/17/82 0955 5/17/82 RHR 1.5 "A" Train RHR System removed from service to perform STP-ll.8.
1535 5/18/82 1553 5/18/82 RHR
.3 "A" Train RHR System removed from service to perform STP-ll.8.
1554 5/18/82 1605 5/18/82 RHR
.2 "B" Train RHR system removed from service to perform STP-ll.8.
1658 5/19/82 1730 5/19/82 Chg. Pump
.5 2A Charging pump breaker DF06 closing spring failed. Repaired contacts on closing arm spring.
1530 5/23/82 1615 5/23/82 RHR
.8 "B" Train RHR System removed from service to perform STP-ll.8.
0930 6/1/82 1030 6/1/82 PHR 1.0 2B RHR pump removed from service to perform STP-11.2.
0415 6/19/82 0450 6/19/82 RHR
.6 2A RHR pump removed from service to perform STP-ll.l.
4
LISTING OF ECCS OUDGES i
Start of Event End of Event Duration-Time Date Time Date System (Hours)
Cause and Corrective Action 0835 7/19/82 0850 7/19/82 RHR
.3 2A RHR pump removed from service to perform STP-11.9.
t 0938 7/20/82 1020 7/20/82 RHR
.7 "A" Train RHR system removed from service to perform STP-ll.6.
1025 7/20/82 1050 7/20/82 RHR
.4 "B" Train RHR system removed from service to perform STP-ll.6.
l 0950 8/1/82 1005 8/1/82 RHR
.3 23 RHR pump removed from service to perform STP-11.10.
4 0010 8/17/82 0020 8/17/82 Chg. Pump
.2 2A Charging pump racked out to megger breaker.,
1925 8/17/82 1936 8/17/82 RHR
.2 2A RHR pump system removed from service to perform STP-ll.9.-
~
~
2030 8/17/82 0137 8/19/82 RHR 30 "B" Train RHR system removed from service to perform maintenance on miniflow orifice and isolation valve.
1000 8/20/82 1015 8/20/82 RHR
.25 2B RHR pump removed from service to perform STP-11.10.
1 1110 8/20/82 1325 8/20/82 RHR 2.25 2A RHR pump removed from service for lubrication.
0529 9/19/82 0549 9/19/82 Chg. Pump
.3 2A Charging pump removed from service to perform STP-4.1.
0915 9/19/82 0940 9/19/82 Chg. Pump
.5 2A Charging pump removed from service to perform STP-4.1.
0400 10/2/82 0510 10/2/82 RHR 1.1 2B RHR pump removed from service to perform STP-11.10.
5
?
LISTING OF ECCS OtJEAGES St9rt of Event End of Event Duration Time Date-Time Date System (Hours)
Cause and Corrective Action 0750 10/8/82 0830 10/8/82 ACC
.7 2B Accumulator inoperable while working PI-927 due to erratic indication.
0526 10/19/82 0541 10/19/82 RHR
.25 2A RHR pump removed from service to perform STP-11.9.
1237 12/4/82 1317 12/4/82 RHR 0.67 2B RHR pump removed from service to perform STP-11.2.
0230 1/17/83 0330 1/17/83 RHR 1.0 2A RHR Pump removed from service to perform STP-11.9.
0300 1/17/83 2030 1/17/83 RHR 17.5 "A" Train RHR MOV 8888B would not open af ter it was closed.
'Ihis event was due to loose contacts in the valve limit switch. 'Ihe contacts were replaced & syst. returned to service.
2015 2/17/83 2106 2/17/83 RHR
.9 2B RHR Pump removed from service for lubrication.
2145 2/17/83 2235 2/17/83 RHR
.8 2A RHR pump removed from service for lubrication.
0348 2/19/83 0514 2/19/83 Chg. Pump 1.4 2C Charging pump was declared inoperable when it failed to meet lube oil pressure criteria per STP-4.3.
0050 2/28/83 0340 2/28/83 RHR 2.8 2A RHR pump removed from service to perforn STP-11.3.
1232 3/1/83 1440 3/01/83 RHR 2.1 2B RHR pump removed from service to perform STP-11.4.
1350 4/13/83 2140 4/13/83 Chg. Pump 7.8 2C Charging pump removed from service for lubrication.
1315 4/17/83 1340 4/17/83 RHR
.4 2A RHR Pump removed from service to perform STP-11.9.
6
LISTING OF ECCS OtffAGES Start of Event End of Event Duration Time Date Time Date System (Hours)
Cause and Corrective Action 1350 4/17/83 1425 4/17/83 RHR
.6 2B RHR Pump removed from service to perform STP-11.10.
1552 5/5/83 1632 5/5/83 Chg. Pump
.7 2C Charging pump removed from service to perform STP-4.3.
1625 5/20/83 1955 5/20/83 RHR 3.5 2A RHR planp removed from service to perform STP-11.1 and STP-11.8.
0110 5/21/83 0156 5/21/83 RHR
.8 2B RHR pump removed from service to perform STP-11.8 and STP-11.10.
0847 6/1/83 1005 6/1/83 RHR 1.25 2B RHR pump removed from service to perform STP-11.2.
0910 6/5/83 1030 6/5/83 Chg. Pump 1.33 2C Charging Pung removed from service to perform STP-4.6.
'U950 6/17/83 1006 6/17/83 RHR
.25 2A RHR pump removed from service to perform STP-11.9.
1105 6/17/83 1116 6/17/83 RHR
.16 2B RHR pump removed from service to perform STP-11.10.
1000 7/17/83 1025 7/17/83 RHR
.42 2A RHR pump removed from service to perform STP-11.9.
1040 7/17/83 1055 7/17/83 RHR
.25 2B RHR pump removed from service to perform STP-11.10 1415 8/20/83 1426 8/20/83 RHR 0.18 2A RHR pump removed from service to perform STP-11.9.
1539 8/20/83 1836 8/20/83 RHR 2.95 2B RHR pump removed from service to perform STP-11.10.
7
LISTING OF ECCS OUDGES St9rt of Event End of Event Duration Time Date Time Date System (Hours)
Cause and Corrective Action 0355 8/21/83 1000 8/21/83 RHR 6.08 2A RHR pump removed from service for lubrication.
1006 8/21/83 1019 8/21/83 RHR 0.22 2A RHR pump removed from service to perform STP-ll.8.-
1025 8/21/83 1048 8/21/83 RHR 0.38 2B RHR pump removed from service to perform STP-11.8.
1128 8/21/83 1235 8/21/83 RHR 1.1 2B RHR pump inoperable due to variable resistor in the breaker closing spring charging motor circuit being out'of adjustment.
Resistor re-adjusted and proper breaker operation verified.
1349 8/21/83 1406 8/21/83 RHR 0.28 2A RHR pump removed from service to perform STP-ll.l.
1306 9/1/83 1351 9/1/83 RHR 0.75 2B RHR pump removed from service to perform STP-ll.2.
1017 9/4/83 1056 9/4/83 Chg. Pump 0.65 2C Charging pump removed from service to perform GMP-12 and GMP-7.
1034 9/5/83 1100 9/5/83 Chg. Pump 0.43 2C Charging pump removed from service to perform STP-4.3.
0257 9/13/83 0400 9/13/83 RHR 1.05 2A RHR pump removed from service to perform STP-11.1.
0955 9/16/83 1009 9/16/83 RHR 0.23 2A RHR pump removed from service to perform STP-11.9.
1030 9/16/83 1037 9/16/83 RHR 0.12 2B RHR pump removed from service to perform STP-11.10.
0825 9/17/83 0842 9/17/83 ACC 0.28 2A Accumulator. removed from service to perform STP-32.0.
8
~
]
LISTING OF ECCS OUDGES i
i Start of Event End of Event Duration Time Date Time Date System (Hours)
Cause and Corrective Action j
0550 10/22/83 0629 10/22/83 RHR 0.57 2A RHR pump removed from service to perform STP-11.9.
0030 10/31/83 0120 10/31/83 RHR 0.83 "A" and "B" Trains of the RHR system removed from service one at a time to perform STP-11.6.
2033 11/13/83 2046 11/13/83 RHR 0.22 2B RHR pump removed from service to perform STP-11.10.
0216 11/17/83 0301 11/17/83 RHR 0.75 2A RHR pump removed from service to perform STP-ll.l.
1040 11/18/83 1100 11/18/83 RHR 0.33 2A RHR pump removed from service to megger motor.
TP310 12/5/83 0940 12/5/83 Chg. Pump 0.30 2C Charging pump removed from service to perform STP-4.3.
j 2200 12/11/83 2240 12/11/83 RHR 0.67 2B RHR pump removed from service to perform STP-11.10.
i i
1705 12/16/83 1759 12/16/83 RHR 0.90 2A RHR pump removed from service to perform STP-11.9.
+
1 1
1 0800 12/28/83 1448 12/28/83 Chg. Pump 6.80 2C Charging pump removed from service for breaker PM.
i TiB20 12/29/83 0625 12/29/83 RHR 0.08 2A RHR pump removed from service to perform STP-11.9.
I TJ720 12/29/83 1520 12/29/83 RHR 8.0 2B RHR pump removed from service for breaker PM.
i 1
0155 1/11/84 0230 1/11/84 RHR 0.58 2B RHR pump removed from service to perform STP-11.2.
i l
9
LISTING OF ECCS OUDGS St9rt of Event End of Event Duration Time Date Time Date System (Hours)
Cause and Corrective Action 1942 1/16/84 1956 1/16/84 RHR 0.23 2A RHR pump removed from service to perform STP-ll.9.
0530 1/20/84 0635 1/20/84 RHR 1.08 "A" and "B" Trains of the RHR system removed from service one at a time to perform STP-ll.6.
0730 1/31/84 1325 1/31/84 RHR 5.92 2A RHR pump removed from service to perform MP-28.109.
a 1032 2/6/84 1310 2/6/84 RHR 2.63 2A RHR pump removed from service to perform STP-ll.3.
i q
2040 2/6/84 2145 2/6/84 RHR 1.08 2B RHR pump removed from service for lubrication.
TE20 2/6/84 2229 2/6/84 RHR 0.15 2B RHR pump removed from service to perform STP-11.10.
0023 2/7/84 0500 2/7/84 RHR 4.62 2A RHR pump removed from service for lubrication.
j t
l 0830 2/17/84 0848 2/17/84 RHR 0.30 "A" Train RHR system removed from service to perform STP-11.8.
^
0850 2/17/84 0912 2/17/84 RHR 0.37 "B" Train RHR system removed from service to perform STP-ll.8.
)
1010 3/5/84 1055 3/5/84 RHR 0.75 2A RHR pump removed from service to perform STP-ll.9.
2307 4/3/84 2326 4/3/84 RHR 0.32 2B RHR pump removed from service to perform STP-ll.2.
0757 4/4/84 1214 4/4/84 Chg. Pump 4.28 2C Charging pump removed from service for lubrication.
1 s
10
q j
e LISTING OF ECCS CXTDGES Start of Event End of Event Duration Time Date Time Date System (Hours)
Cause and Corrective Action 1543 4/5/84 1555 4/5/84 RHR 0.20 2A RHR pump removed from service to perform STP-ll.9.
1235 4/19/84 1310 4/19/84 RHR 0.58 "A" Train RHR system removed from service to perform STP-11.6.
1313 4/19/84 1345 4/19/84 RHR 0.52 "B" Train RHR system removed from service to perform STP-ll.6.
1849 6/3/84 1901 6/3/84 RHR 0.20 2A RHR pump removed from service to perform STP-ll.9.
1000 6/4/84 1128 6/4/84 RHR 1.47 2B RHR pump removed from service to perform STP-11.10 1025 6/4/84 1316 6/4/84 Chg. Pump 2.85 2C Charging pump removed from service to perform STP-4.6.
0059 6/26/84 0109 6/26/84 RHR 0.17 2A RHR punp removed from service to perform STP-ll.9.
0314 6/26/84 0835 6/27/84 RHR 29.35 2B RHR pump removed from service for implementation of PCN.
D048 6/28/84 0108 6/28/84 RHR 0.33 2B RHR pump removed from service to perform STP-11.10.
0231 6/28/84 1701 6/28/84 RHR 14.50 2A RHR pump removed from service for implementation of PCN.
0212 7/5/84 0435 7/5/84 Chg. Pump 2.38 2C Charging pump removed from service for lubrication.
1108 7/5/84 1154 7/5/84 RHR 0.77 2B RHR pump removed from service to perform STP-11.2.
11
LISTING OF ECCS CUTAGES Start of Event End of Event Duration Time Date Time Date System (Hours)
Cause and Corrective Action 0742 7/19/84 1320 7/19/84 RHR 5.5 "B" Train RHR system removed from service to perform STP-ll.6.
1345 7/19/84 1840 7/19/84 RHR 5
"A" Train RHR system removed from service to perform STP-ll.6.
0808 8/5/84 0819 8/5/84 RHR 0.2 2B RHR pump removed from service to perform STP-11.10.
1010 8/5/84 1103 8/5/84 RHR 0.7 2A RHR pump removed from service to perform STP-ll.l.
1824 8/12/84 1844 8/12/84 RHR 0.3 "A" Train RHR system removed from service to perform STP-ll.8.
1847 8/12/84 1903 8/12/84 RHR
.3 "B" Train RHR system removed from service to perform STP-ll.8 8 31/84 2348 8/31/84 RHR 2.5 "B" Train RHR system placed on recirculation to obtain boron 2115
/
- sample, 2350 8/31/84 0218 9/1/84 RHR 1.5 "A" Train RHR system placed on recirculation to obtain boron sample.
0125 9/5/84 0141 9/5/84 RHR 0.27 2A RHR pump removed from service to perform STP-45.1.
0251 9/5/84 0314 9/5/84 RHR 0.38 2B RHR pump removed from service to perform STP-45.1.
0110 9/28/84 0420 9/28/84 Chg. Pump 3.2 2C Charging pump removed from service to replace oil filter.
1626 9/28/84 1639 9/28/84 RHR 0.2 2A RHR Pump removed from service to perform STP-ll.9 12
R I
LISTING OE' ECCS OtJDGES St9rt of Event End of Event Duration Time Date Time Date System (Hours)
Cause and Corrective Action l
0800 10/4/84 1354 10/4/84 Chg. Pump 5.9 2C Charging pump removed from service for lubrication.
l l
1308 10/19/84 1451 10/19/84 RHR 1.7 2B RHR pump removed from service to perform STP-ll.4.
i l
1234 10/28/84 1255 10/28/84 RHR 0.35 2A RHR pump removed from service to perform STP-ll.9, i
1002 11/3/84 1020 11/3/84 RHR 0.3 2A RHR pump removed from service to perform STP-11.1.
1807 11/3/84 1823 11/3/84 RHR 0.3 2B RHR pump removed from service to perform STP-ll.10.
1021 11/14/84 1037 11/14/84 RHR 0.3 "A" and "B" Trains of the RHR system removed from service one at a time to perform STP-ll.8.
l 0914 12/3/84 0921 12/3/84 RHR 0.1 2A RHR pump removed from service to perform STP-11.9 l
0930 12/3/84 0946 12/3/84 RHR 0.3 2B RHR pump removed from service to perform STP-11.10 l
0914 12/4/84 1057 12/4/84 Chg. Pump 1.7 2C Charging pump removed from service to perform STP-4.3.
0906 12/27/84 1044 12/27/84 RHR 1.6 2A RHR pump removed from service to perform STP-2I.9.
i 1127 12/27/84 1800 12/27/84 RHR 6.5 2B RHR pump removed from service for lubrication.
I 1350 1/4/85 1429 1/4/85 RHR 0.6 "A" Train RHR system placed on recirculation to obtain j
boron sample.
13 l
r
]
LISTING OF ECCS CXTDGES 1
I Start of Event End of Event Duration Time Date Time Date System (Hours)
Cause and Corrective Action l
l 1540 1/4/85 1602 1/4/85 RHR 0.4 "B" Train RHR system placed on recirculation to obtain I
boron sample.
1054 1/5/85 1102 1/5/85 ACC 0.1 2A Accumulator removed from service to perform STP-32.0.
1108 1/5/85 1112 1/5/85 ACC 0.07 28 Accumulator removed from service to perform STP-32.0.
l 1118 1/5/85 1124 1/5/85 ACC 0.1 2C Accumulator removed from service to perform STP-32.0.
2023 1/9/85 1139 1/10/85 ACC 15.3 2A Accumulator removed from service for maintenance on check valve V037A.
1300 1/18/85 0400 1/22/85 RHR 87.0 "A" Train RHR tagged out to pull suction and discharge relief valve for bench testing.
0323 3/7/85 0405 3/7/85 RHR 0.7 "A" Train RHR system removed from service to perform STP-ll.8.
0407 3/7/85 0432 3/7/85 RHR 0.4 "B" Train RHR system removed from service to perform STP-ll.8.
1657 3/11/85 1939 3/11/85 RHR 2.7 "B" Train RHR system placed on recirculation to obtain boron sample.
1955 3/11/85 2239 3/11/85 RHR 2.7 "A" Train RHR system placed on recirculation to obtain boron sample.
1310 3/18/85 1431 3/18/85 RHR 1.4 "A" Train RHR system placed on recirculation to 'obtain boron sample.
1449 3/18/85 1539 3/18/85 RHR 0.8 "B" Train RHR system placed on recirculation to obtain boron sample.
14
l l
LISTDG OF ECCS OUTXES Start of Event End of Event Duration l
Time Date Time Date System (Hours)
Cause and Corrective Action 1725 3/25/85 1741 3/25/85 RHR 0.3 2A RHR pump removed from service to perform STP-11.9.
0140 3/30/85 0205 3/30/35 RHR 0.4 2B RHR pump removed from service to perform STP-11.10.
1000 3/31/85 1012 3/31/85 RHR 0.2 2B RHR pump removed from service to perform STP-ll.10.
0308 4/5/85 0420 4/5/85 RHR 0.2 2B RHR pump removed from service to perform STP-ll.2.
2210 4/25/85 2223 4/25/85 RHR 0.2 2A RHR pump removed from service to perform STP-ll.9.
1059 5/3/85 1145 5/3/85 RHR 0.8 2A RHR pump removed from service to perform STP-11.1 1004 5/5/85 1042 5/5/85 RHR 0.6 2B RHR pump removed from service to perform STP-11.10.
1636 5/7/85 1653 5/7/85 Chg. Pump 0.3 2C Charging pump breaker DG06 removed from service for inspection.
1508 5/8/85 1554 5/8/85 RHR 0.8 2A RHR pump removed from service to perform STP-11.9.
1603 5/8/85 1720 5/8/85 RHR 1.3 2B RHR pump removed from service for breaker inspection.
1011 5/9/85 1016 5/9/85 RHR 0.1 2B RHR pump removed from service to perform STP-ll.10.
1030 5/9/85 1537 5/9/85 RHR 5.1 2A RHR pump removed from service for breaker inspection.
15
t l
LISTING CF ECCS OUDGES Start of Event End of Event Duration Time Date Ti:ne Date System (Hours)
Cause and Corrective Action 1535 5/9/85 1537 5/9/85 RHR 0.03 2A RHR pump removed from service to perform STP-11.9.
0844 5/13/85 1822 5/13/85 Chg. Pu:sp 9.5 2C Charging pump removed from service for lubrication.
2212 5/21/85 2325 5/21/85 RHR 1.2 "A" and "B" trains of the RHR system removed from service one at a time to perform STP-11.6.
1630 5/22/85 2232 5/22/85 Chg. Pump 6.0 Closed Charging pump suction MOV-8131A to check torque setting and dual indication problem.
2C Charging pump removed to prevent auto start w/o suction 2056 5/25/85 2115 5/25/85 RHR 0.6 2A RHR pump removed from service to perform STP-11.9.
0532 6/4/85 0541 6/4/85 RHR 0.2 2A RHR pump removed from service to perform STP-11.9.
0605 6/4/85 1952 6/5/85 RHR 27 "B" Train RHR system inoperable due to PT-605B being tagged out.
0140 6/5/85 0240 6/5/85 Chg. Pump 1.0 2C Charging pump removed from service to perform STP-4.3.
0524 6/6/85 1543 6/7/85 RHR 34.3 "A" Train RHR inoperable due to ET-605A being tagged out.
2000 6/7/85 0430 6/8/85 RHR 8.5 2B RHR Pump removed from service for lubrication.
0420 6/8/85 0430 6/8/85 RHR 0.2 2B RHR pump removed from service to perform STP-11.10.
0156 7/1/86 0207 7/1/85 RHR 0.2 2B RHR Pump removed from service to perform STP-11.2.
16
I i
l l
LISTING OF ECCS OUIAGES Stort of Event End of Event Duration Time Date Time Date System (Hours)
Cause and Corrective Action 1436 7/3/85 1533 7/3/85 RHR 0.95 2A RHR ptsap removed from service to perform STP-11.9.
0858 7/9/85 0921 7/9/85 RHR 0.4 2B RHR pump removed from service to perform STP 11.10.
0945 7/9/85 1510 7/9/85 RHR 5.4 2A RHR pump removed from service to work limit switch grease on mini flow.
Ch. Pump 10.5 2C Charging Pump breaker tagged out to grease coupling and 0751 7/13/85 1820 7/13/85 3
change limit switch grease on mini f1cw.
0312 7/23/85 0333 7/23/85 RHR 0.4 2B RHR pump removed from service to perform STP-11.10.
1623 7/23/85 1654 7/23/85 RHR 0.5 2A RHR pump removed from service to perform STP-11.9.
1712 7/23/85 2345 7/23/85 RHR 6.5 2B RHR pump removed from service to prevent damage while stroking miniflow valve 602B.
0058 8/9/85 0212 8/9/85 RHR 1.2 2B RHR pump removed from service to perform STP-11.10.
0230 8/9/85 1145 8/9/85 RHR 9.3 2A RHR pump removed from service for lubrication and STP-ll.l.
2104 8/21/85 2119 8/21/85 RHR 0.3 "A" Train RHR system removed from service to perform STP-ll.6.
2123 8/21/85 2148 8/21/85 RHR 0.4 "B" Train RHR system removed from service to perform STP-ll.6.
1611 9/7/85 1655 9/7/85 RHR 0.7 "A" Train RHR system removed from service to perform STP-ll.8.
17
-LISTDG W ECCS MTmGES Start of Event End of Event Duration Time Date Time Date System (Hours)
Cause and Corrective Action l
2119 9/7/85 2134 9/7/85 RHR 0.3 "A" Train RHR system removed from service to perform STP-11.8.
2135 9/7/85 2144 9/7/85 RHR 0.2 "B" Train RHR system removed from service to perform STP-ll.8.
l l
l 0857 9/9/85 1002 9/9/85 RHR 1.1 2A RHR pump removed from service to perform STP-11.9 1148 9/9/85 1254 9/9/85 RHR 1.1 2B RHR pump removed from service to perform STP-ll.10.
1340 9/29/85 1451 9/29/85 RHR 1.2 2B RHR pump removed from service to perform STP-ll.4.
1552 10/6/85 1601 10/6/85 RHR 0.15 2A RHR pump removed from service to perform STP-ll.9.
1144 10/9/85 1154 10/9/85 RHR 0.16 2B RHR pump removed from service to perform STP-11.2.
1315 10/29/85 1338 10/29/85 RHR
.45 2B RHR pump removed from service to perform STP-11.10.
2113 11/3/85 2212 11/3/85 RHR 1
2A RHR pump removed from service to perform STP-ll.l.
1724 11/6/85 0054 11/7/85 Chg. Pump 7.5 2C Charging pump removed from service for lubrication.
0125 12/3/85 0146 12/3/85 RHR
.2 2A RHR pump removed from service to perform STP-ll.9.
0150 12/8/85 0214 12/8/85 RHR
.4 "A" Train RHR system removed from service to perform STP-ll.8.
18
LISTIlO OF ECCS GFmGES Start of Event End of Event Duration Time Date Time Date System (Hours)
Cause and Corrective Action 0215 12/8/85 0245 12/8/85 RHR
.5 "B" Train NHR system removed from service to perform S'EP-ll.8.
l 1008 12/15/85 0425 12/16/85 Chg. Pump 18.3 2C Charging plump taken out to allow cleaning cf the lube oil cooler.
0850 12/26/85 0948 12/26/b5 RHR 1
2B RHR pump removed from service to perform STP-ll.2.
0904 1/2/86 1034 1/2/86 RHR 1.5 2A RHR pump removed from service to perform STP-ll.9.
1704 1/6/86 1822 1/6/86 Chg. Pump 1.3 2C Charging plump removed from service to perform STP-4.3.
1900 3M/86 1921 3M/86 RHR
.4 "A" Train RHR system removed frontservice to perform STP-ll.8.
l i
1922 3M/86 2006 3M /86 RHR
.7 "B" Train RHR system removed frrun service to perform STP-ll.8.
0120 3/11/86 0440 3/11/86 Chg. Pump 3.3 2A Charging pump removed from service to inspect breaker.
1411 3/11/86 1638 3/11/86 RHR 2.5 "B" Train RHR systent removed from service for maintenance.
1540 3/13/86 0110 3/14/86 RHR 9.5 "A" Train RHR heat exchanger removed from service for maintenance.
0825 3/16/86 0930 3/16/86 RHR 1.1 Shut MDV 8888A "B" Train RHR discharge valve to verify operability of "B" pump prior to removing "A" Train RRR for maintenance.
0945 3/16/86 1442 3/16/86 RHR 4.9 "A" Train RER systest removed from service for calibration of miniflow transmitter.
19
=
)
LISTDG W ECCS OUDGES Start of Event End of Event Duration Time Date Time Date System (Hours)
Cause and Corrective Action 1544 3/21/86 1624 3/21/86 RHR
.7 2A RHR pump removed frontservice to perform STP-11.9.
l 1735 3/21/86 2205 3/21/86 RHR 4.5 "B" Train RHR system removed from service for calibration of miniflow transmitter.
i 1110 3/31/86 1402 3/31/86 Olg. Pump 2.8 2C Charging Pump removed from service to perform STP-4.3.
l i
1357 3/31/86 1903 3/31/86 Chg. Pump 5.9 2C Charging Pump breaker racked out for PMs on Auxiliary lube oil pump pressure indicator.
2230 4/3/86 2238 4/3/86 RHR
.2 2A RHR pump removed from service to perform STP-ll.9.
0425 4/4/86 1015 4/4/86 RHR 5.8 "B" Train RHR system removed from service to change out potentiometer on discharge valve.
0335 4/5/86 0557 4/5/86 RHR 2.3 "A" Train RHR system placed on recirculation to obtain boron sample.
0617 4/5/86 0843 4/5/86 RHR 2.5 "B" Train RHR system plaed on recirculation to obtain boron sample.
1212 4/7/86 1300 4/7/86 RHR 0.8 2A RHR pump secured due to air entering "A" Train RHR system.
2A RHR pump vented and return to service.
20