Forwards Safety Evaluation Accepting Licensee Responses to Generic Ltr 83-28,Item 2.1 (Part 2) & Item 2.2.2 Re Vendor Interface Programs for Reactor Trip Sys & All Other Site safety-related Components
ML20207C224
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 12/15/1986
From: Reeves E
Office of Nuclear Reactor Regulation
To: Mcdonald R
ALABAMA POWER CO.
Shared Package
ML20207C230 List:
References
GL-83-28, NUDOCS 8612300080
Download: ML20207C224 (3)


Text

e a DEC 15 SP6 DTSTRIRUTION

%M R. Grimes

-NRC PDR J. Partlow local PDR T. Barnhart (4)

Docket Nos. 50-348 PAD #2 Rdg W. .lones and 50-364 T. Novak H. E. Gilpin D. Miller F. Rosa E. Reeves (2) ACRS (10)

OELD OPA Mr. R. P. Mcdonald L. Harmon C. Miles Senior Vice President E. . lordan Gray File Alabama Power Company C. Rossi Post Office Box 2641 D. Lasher Birmingham, Alabama 35291

Dear Mr. Mcdonald:

SUS.1ECT: RESOLUTION OF VENDOR INTERFACE PROGRAMS, GENERIC LETTER 83-28, ITEM 2.1 (PART 2) AND ITEM 2.2.2 FOR .10SEPH M. FARLEY NUCLEAR PLANT UNIT NOS. 1 AND ?

We have completed our review of your proposals relating to the vendor interface programs for the Reactor Trip System (RTS) and all other safety-related components at Farley site. Specifically, our review relates to the following licensee requirements of Generic Letter 83-28 dated iluly 8,1983:

(1) Item 2.1 (Part 2) required licensees to establish and maintain a continuing interface with the vendors of the safety-related components of the RTS to ensure that vendor information for these components is received by the plant and is complete, current, and controlled during the life of the plant.

(2) Item 2.2.2 required licensees to establish a similar interface program with the vendors of all other safety-related components.

We have reviewed your responses dated November 4, 1983, June 25, 1984, and April 22, 1985. We also met with you to discuss your concerns during a meeting on April 4,1985, in Bethesda, Maryland. Based on our review, we find your proposals are acceptable as documented in the enclosed safety evaluation.

The vendor interface program at the Farley Nuclear Plant is the first such program which we have accepted as referencing the NUTAC/VETIP program as a part of licensee actions for Item 2.P.2 of GL 83-28. Since Item 2.2.2 (MPA B-86) is included in the Safety Issues Management System (SIMS), please advise us of your estimated implementation date for entry into the SIMS database. A date is needed only should you consider that our safety evaluation would necessitate changes to the existing vendor interface program at Farley Nuclear Plant.

kP DO 5 D 8 t u

~

DEC 151986 Mr.~R. P. Mcdonald Otherwise, we tentatively plan a site inspection of the vendor interface program at Farley Nuclear Plant in approximately four months.

Sincerely, 8Diadnal sagned brr Edward A. Reeves, Proiect Manager PWR Proiect Directorate #2 Division of PWR Licensing-A Office of Nuclear Reactor Regulation

Enclosure:

As stated cc: See next page

'2 P- #2 PD: PAD #2 ler Reeves:bl LRubenstein 12'p86 12/g/86 1 /86

Mr. R. P. Mcdonald Alabama power Company .loseph M. Farley Nuclear Plant cc:

Mr. W. O. Whitt D. Riard MacGuineas, Esquire Executive Vice President Volpe, Roskev and Lyons Alabama power Company 418 16th Street, N.W.

Post Office Rox 7641 Washington, DC ?0006 Birmingham, Alabama 35291-0400 Charles P. Lowman Mr. Louis R. Long, General Manager Alabama Electric Corporation Southern Company Services, Inc. Post Office Rox 550 Post Office Rox 76?5 Andalusia, Alabama 36470 Birmingham, Alabama 3520?

Chairman Regional Administrator, Reaion TT Houston County Commission ll.S. Nuclear Reoulatory Commission Dothan, Alabana 36301 101 Marietta Street, Suite 2900 Atlanta, Georgia 30303 Ernest L. Blake, Jr., Esquire Shaw, Pittman, Potts and Trowbridge Claude Earl Fox, M.D.

2300 N Street, N.W. State Health Officer Washington, DC 20037 State Department of Dublic Wealth State Office Ruilding Montgomery, Alabama 36130 Robert A. Ruettner, Esquire Ralch, Rinoham, Raker, Hawthorne, Mr. J. D. Woodard Williams and Ward General Manager - Nuclear Plant Post Office Rox 306 Post Office Rox 470 Rirmingham, Alabama 35201 Ashford, Alabama 36312 Resident Inspector ti.S. Nuclear Regulatory Commission Post Office Box 24 Route 2 Columbia, Alabama 36310 l

l

_ . . ___ _ . , . ,. . - _ _