Forwards Safeguards Insp Rept 50-400/86-64 on 860818-22. No Violation or Deviation Noted
ML20207A025
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 09/26/1986
From: Verrelli D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Utley E
CAROLINA POWER & LIGHT CO.
Shared Package
ML20207A026 List:
References
NUDOCS 8610080475
Download: ML20207A025 (2)


See also: IR 05000400/1986064

Text

F ,

1

" '

SAFEGUARDS INFORMATION l

SEP 261915 l

Docket No. 50-400

License No. CPPR-158 1

Carolina Power and Light Company

ATTN: Mr. E. E. Utley

Senior Executive Vice President

Power Supply and Engineering

and Construction

P. O. Box 1551

Raleigh, NC 27602

Gentlemen:

SUBJECT: NRC INSPECTION REPORT NO. 50-400/86-64

This refers to the Nuclear Regulatory Commission (NRC) inspection conducted by

W. Tobin on August 18-22, 1986. The inspection included a review of activities

authorized for your Shearon Harris facility. At the conclusion of the inspec-

tion, the findings were discussed with those members of your staff identified in

the enclosed inspection report.

Areas examined during the inspection are identified in the report. Within these

areas, the inspection consisted of selective examinations of procedures and

representative records, interviews with personnel, and observation of activities

in progress.

Within the scope of the inspection, no violations or deviations were identified.

In accordance with 10 CFR 2.790(d) and 10 CFR 73.21, safeguards activities and

security measures are exempt from public disclosure; therefore, the enclosure to

this letter, with the exception of the report cover page which presents a

nonexempt summary, will not be placed in the NRC Public Document Room.

Should you have any questions concerning this letter, please contact us.

Sincerely,

David M. Verrelli, Chief

Reactor Projects Branch 2

Division of Reactor Projects

Enclosure:

NRC Inspection Report

75 860926

OOgCK00000400

cc w/ encl: G

PDR

R. A. Watson, Vice President

Harris Nuclear Project

D. L. Tibbitts, Director of Regulatory

Compliance

J. L. Willis, Plant General Manager g3ps cot A gg

SA G S

bcc w/ encl: (See page 2) sEP

t ON o.

SAFEGUARDS INFORMATION gg ,1

-

t.

SAFEGUARDS INFORMAT'0B'

Carolina Power and Light Company 2

${pggjggg

bec w/ encl:

IE File

NMSS/SGPL

NRR/DL/SSPB

bec w/ Inspection Summary:

NRC Resident Inspector

Document Control Desk, 016

State of North Carolina

l

.

.

II RII RII E!CLOStfR3 00rIAllis

~ St.rEcuaubs Iltro bu,7:r.n

-

'

[ obin:cdg DMcGuire gMw,g Fr rickson WC'l S.MMID THIS

.

S/g/86 09//6/86 9 86 p/g86

97

PAGE IS DECONTROLLED.

wp/// t'

4

I E'tGUARDSINP"'~'~0N