Forwards Markup of NRC List of Generic Requirements Indicating Estimated Status Re Implementation of multi-plant Actions,Per 860627 Commitment.Some multi-plant Actions Require Addl Clarification on Generic Requirements
ML20206T684
Person / Time
Site: Three Mile Island Constellation icon.png
Issue date: 06/26/1986
From: Hukill H
GENERAL PUBLIC UTILITIES CORP.
To: Toma J
Office of Nuclear Reactor Regulation
References
TASK-***, TASK-TM 5211-86-2111, NUDOCS 8607080206
Download: ML20206T684 (8)


Text

'

s 6

  • GPU Nuclear Corporation NggIgf Post Office Box 480 Route 441 South Middletown, Pennsylvania 17057 0191 ,

717 944 7621 '

TELEX 84-2386  !

Writer's Direct Dial Nurnber:

June 26, 1986 5211-86-2111 Office of Nuclear Reactor Regulation Attn: John 0. Thoma, Project Manager PWR Project Directorate No. '

Division of PWR Licensir P U.S. Nuclear Regulator 3 nmission Washington, D.C. 20555

Dear Mr. Thoma:

Three Mile Island Nuclear Station Unit 1 (TMI-1)

Operating License No. DPR-50 Docket No. 50-289 Implementation of Generic Requirements Our letter of June 2,1986 described the level of effort required to properly respond to your request for THI-l status on the implementation of various Multi-Plant Actions (MPAs) which the NRC has been tracking internally. We stated that it would possibly require several manyears. However, after receipt of our letter, the immediacy of your need for the information was discussed with GPUN management. Based on that discussion, we committed to respond by June 27, 1986 with a reduced scope of our effort. Due to the time constraints, we have not been able to do a thorough search of our records or physically verify the documented actions to determine a status as accurately as is our normal policy for NRC submittals.

The attached markup of your list of generic requirements shows GPUN's estimated status' for each of the MPAs that we feel we can identify from the information you have provided. An additional column of comments has been added to your list. The purpose of'this column is to show the basis for the completion date selected.

In some cases we still do not have a clear identification of the MPA and additional clarification is needed. Our response is based on our best estimate of the action that was required when the MPA was initiated. Some of 1 the MPAs clearly have periodic update requirements. Some of the MPAs deal  ;

with issues which have been the subject of on-going requests. Therefore, an i MPA shown to be complete does not reflect any additional required actions i which may relate to the same subject area. For active items, the dates which are given are not intended to revise any commitment date previously provided.

e607080206 e60626 9 ,

ADOCK 0500 PDR P [0 i

GPU Nu:: lear Corporation is a subsidiary of the General Public Utilities Corporation ,

9 5211-86-2111 June 26, 1986 If it appears that we have misinterpreted any of the MPAs or a more accurate status is desired, please inform us. If there are any questions, please contact Mr. C. W. Smyth of GPUNC at (717) 948-8551.

Sincerely, H. D. Hu ill Vice President & Director, TMI-1 HDH/MRK/spb cc: T. Murley J. Stolz R. Conte Attachment 0610A i

1

6 MASTER Q-1208738-008 REGULAT0RY INF0RMATION TRACKING SYSTEM PAGE NO.s 49 FACILITY IMPLEMENTATION 03/31/8 FACILITY: THREE MILE ISLAND 1 '

PL ANT LDCATIDNs 10 MI SE OF MARRISBURG, PA LICENSED PONER: 2535 MNT PROJECT MANAGER: J. THOMA DOCKET NUM0fts 850-80289 DESIGN PONER: 0819 MNE BRANCH CHIEF: J. STOLZ ARCN/ ENGINEER: GIL NS$$ VENDOR: B&N LIC. ASSISTANis R. INGRAM IE INSPECTOR: R. CONTE LIC ACT DOCUMENTATTON OF COMPLETTON TITLE COMPLETE STATUS DATE TAC NO. MPA 8 05/07/8 0C COMPLETE 1979 TSCR 64, Letter CQL 1357 dated 10/26/79 M07057 A-01 10 CFR 50.55 A(G) - ISI APPENDIX I - ALARA 08/06/81C COMPLETE 1981 TSCR 34A, 01/19/81 N084 56 A-02 A-03 SECURITY REVIENS-MODIFIED AMENDMENT PL ANS 02/23/79C COMPLETE 1978 Modified Amended Physical Security Plan, Rev. O, 02/01/78 M07489 M08710 A-04 APPENDIX J - CONTAINMENT LEAK TESTING 03/30/81C COMPLETE 1980 TSCR 22, Letter TLL-220, 05/13/80 (Amendment 63)

A-09 PRESSURE VESSEL BELTLINE MATERI AL SURVEILL ANCE 01/22/81C COMPLETE 1976 TSCR 40, Letter OQL 1273 dated 10/29/76 C11376

[19542 A-10 CONTINGENCY PLANNING 04/22/81C COMPLETE 1979 Safeguards Contingency Plan, Rev. O, 03/15/79 M19568 A-11 GUARD TRAINING PLANS 04/22/81C COMPLETE 1979 Guard Training & Qualification Plan, Rev. O, 03/15/79 03/04/82C COMPLETE 1930 Letter TLL 697, Security Plan, Rev. 8, 12/30/80 M19565 A-12 VITAL AREA ANALYSIS 10CFR 50.55 A(G) - INSERVICE TESTING 08/05/81C COMPLETE 03/1986 5211-86-2010, 03/03/86 (Am. 71 Open Items)

Z11287 A-14 04/11/80C COMPLETE 1980 TLL 196, dated 4/30/80 M12560 A-15 00ALITY ASSURANCE REQUEST REGARDING DIESEL GENARAT 04/12/82C COMPLETE 1981 Letter 5211-81-2230, 08/25/81 M47086 A-16 GUALIFICATIONS OF EXAMINATION. INSPECIION. TESTING A-17 INSTRUMENTATION TO FOLLON THE COURSE OF AN ACCIDEN 12/30/86 COMPLETE 06/1986 Letter 5211-86-2097, 06/05/86 M51361 04/30/86 COMPLETE 05/1986 TSCR 138, dated 05/12/86 P55750 A-18 TECM SPECS AFFECTED BY 50.72 AND 50.73 (GL 83-43)

M'S151 j A-20 10 CFR 50.62 OPERATING REACTOR REVIENS 12/31/88 ACTIVE Projected Completion 10/88 (Outage 7R) 04/30/86 COMPLETE 01/1986 Letter 5211-86-2007 B&W Topical Report 1895, 01/23/86

-- M59990 A-21 10 CFR 50.6 8, PRESSURIZED THERMAL SHOCK RUL E M86466 B-02 FIRE PROTECTION 09/19/78C No MPA Written Description Provided More Information Required 02/01/80C C0!!PLETE 1981 Letter TLL 637, 04/06/81 M08 '_0 3 B-03 PNR MODERATOR DILUTION 1978 TSCR 74, dated 03/13/78 M86704 B-04 REACTOR VESSEL OVERPRESSURE PROTECTION 06/15/80C COMPLETE 1930 TSCR 61B, dated 05/20/80 M88172 3-08 PNR NPSI-LPSI FLDH RESISTANCE 09/02/80C COMPLETE 1977 TSCR 43. Rev. 1, Letter GQL 0020 dated 01/07/77 M64707 B-12 STEAM GENERATOR TUBE INSPECTION 82/22/78C 00MPLETE

a a

MASTER Q-12sS731-901 REGULAT0RY INF0RMATION TRACKING SYSTEM PAGE NO. 4e FACILITY IMPLEMENYATION 03/31/3 THREE MILE ISLAND 1 (CONTINUATION)

TITit g STATUS DATE DOCUMENTATION OF COMPLETION D C.J L MPA 0 C18850 B-14 CEA GUIDE TUBE NEAR 07/24/8tC COMPLETE 1980 Topical Report BAW 1623, 06/X/80 Cl2147 B-16 EMERGENCY PL ANNING AND REVISIONS 01/26/81C No PFA Written Description Provided More Information Required C11286 B-17 TECM SPEC SURVEILL ANCE FOR NYDRAULIC $NUBBERS 09/30/84C COMPLETE 1984 TSCR 105, Rev. 1, dated 02/17/84 M07046 B-18 NORTNINGTON RNR PUMP SNAFT INTEGRITY 03/21/79C COMPLETE 1979 CPUNC Letter to NRC, 02/28/86 M10322 B-20 CONTAINMENT LEAKAGE DUE TO SEAL DETERIORATION 08/25/80C SEE MPA B-24 Ct 9584 3-21 LOSS OF 125-V DC SUS VOLTAGE MITN LOSS OF ANNUNCI A 02/28/82C N/A No Action Planned. No NRC Request Received M08604 B-22 TECM SPEC SURVEILLANCE REQUIREMENTS FOR MECMANICAL 01/01/70C N/A No Mechanical Snubbers (See B-17)

C10055 B-23 DEGRADED GRID VOLTAGE 01/01/70C COMPLETE 1982 Completion of Undervoltage Modification, 01/25/82 C19969 5-23 DEGRADED GRID V0LTAGE 07/29/81C COMPLETE 1982 Completion of Undervoltage Modification. 01/25/82 Kle205 B-24 VENTING AND PDRGING CONTAINMENTS NNILE AT FULL PON 08/25/80C SEE B-24 BELOW M42602 B-24 VENTING AND PURGING CONTAIMMENTS NMILE AT FULL PON 03/25/8 5C ACTIVE 04/1987 T Spe s comp ete 11 23 83 pe SCR 6 ev. 1 M19259 5-26 INADVERTANT SAFETY INJECTION DURING COOLDONN 09/14/79C No MPA Written Description Provided More Information Required C19533 3-35 DRIFICE ROD ASSEMBLY INTEGRITY - B8N 02/01/80C No MPA Written Description Provided More Information Required M08608 B-39 PNR PRESSURE - TEMPERATURE LIMIT TECM SPECS 10/26/79C Closed by NRC. No Action Required per Telecon with J. Thoma 06/26/86 E11236 B-41 FIRE PROTECTION - FINAL TECM SPECS (INCLUDES SER S 0 5/15/84C ACTIVE 04/1987 Complete Mods During Outage 6R M187*2 3-42 TMI FOLLON UP - ALL PL ANTS 04/01/80C COMPLETE --- MPA Too Broad to Assign a Specific Completion Date 012879 B-45 NASN 1400 EVENT V, " PRIMARY COOLANT SYSTEM PRESSUR 04/20/81C COMPLETE 1980 TLL 137, dated 03/31/80

~* E12601 3-46 ANALYSIS OF TURSINE DISC CRACKS 11/03/8tc COMPLETE 1980 TLL 299, dated 07/11/80 M12737 B-47 ECC$s CLAD SHELLING AND RUPTURE 04/24/81C No MPA Written Description Provided More Information Required M48 586 3-48 ADEGUACY OF STATION ELECTRIC DISTRIBUTION VOLTAGE 05/13/82C SEE HPA B-23 Ab0VE M42127 B-57 DHR CAPABILITY 03/30/86 COMPLETE 04/1986 TSCR 142 and 5211-86-2065, dated 04/24/86 M42;19 5-59 MASONRY HALL DESIGN 08/08/83C COMPLETE 1983 5211-83-158, dated 06/23/83 M42513 3-60 ENVIRONMENTAL QUALIFICATION 04/21/8 5C 00MPLETE !!/1985 5211-85-2195, dated 11/26/85

MASTER REGULAT0RY INF0RMATION TRACKINO SYSTEM PAGE NO.s 4*

GH1204731-081 FACILITY IMPLEMENTATION 03/31/4 THREE MILE ISLAND 1 (CONTINUATION)

LIC ACT TITLE COMPLETE STATUS DATE DOCUMENTATION OF COMPLETION T AC No. MPA 3 M42710 B-61 LOSi 0F NON CLASS IE ISC P0HER 07/28/82C COMPLETE 1982 Completion of Modification ll/X/82 M42781 3-62 ESF RESET CONTROL DESIGN DEFICIFNCY 11/18/81C COMPLETE 1984 Completion of :fodification ll/X/84 M43921 8-63 INTERIM PROCEDURES FOR SHORT TERM BL ACKOUT 11/10/81C COMPLETE 1981 LIL-147, dated 06/24/81 M43262 3-64 BSC INDUCED FLUX ERRORS 04/30/82C COMPLETE 1981 LIL-273, dated 09/29/81 M47157 5-66 NATURAL CIRCUL ATION C00LDOHN 06/05/84C COMPLETE 07/1985 5211-85-2130, dated 07/24/85 M47551 3-67 THERMAL SNOCK 02/05/83C COMPLETE 1982 5211-82-132, dated 06/01/82 (150-day response)

M47026 B-67 THERMAL $ NOCK 01/15/82C COMPLETE 1981 LIL-316, dated 10/26/81 (90-day response)

M46]C4 B-69 IEB 88-4 MAINSTEAM LINE BREAK HITH CONTINUED FEEDH 07/21/82C COMPLETE 1980 TTL-228, dated 05/20/81 M46638 B-70 FATIOUE TRANSIENT LIMIT TS 05/25/82C No MPA Written Description Provided More Information Required M49764 B-72 NUREG 9737 TECH SPECS (GENERIC LETTER 82-16) 05/10/84C COMPLETE 1982 5211-82-263, dated 12/17/82 M49615 B-7 3 PL ANS FOR PREVENTING EXCEEDING PTS SCREENING CRITE 12/27/83C COMPLETE 1983 5211-83-063, dated 03/07/83 05/31/85C COMPLETE 1984 5211-83-330, dated 11/08/83, Procedures Revised (AP 1063)

M52898 B-76 ITEM 1.1 - POST TRIP REVIEHa PROGRAM DESCRIPTION &

M52889 B-77 ITEM 2.1 - EQUIPMENT CLASSIFICATION 8 VENDOR INTER 11/30/86 ACTIVE 01/1989 5211-85-2160, dated 10/04/85 B-78 ITEMS 3.1.1 8 3.1.2 -POST MAINTENANCE TEST PROCEDU 10/24/85C ACTIVE 01/1990 Update Procedures Based on Vendor Manuals M52979 10/18/85C COMPLETE 1983 5211-83-330, dated 11/08/83 M53051 5-79 ITEM 3.1.3 - POST MAINTENANCE TESTING - CHANGES TO 10/28/8 5C COMPLETE 1983 5211-83-330, dated 11/08/83 M53105 B-Se ITEM 4.1 - REACTOR TRIP SYSTEM RELI ABILITY - VENDO ITEMS 4.2.1 8 4.2.2 -PREVENTATIVE MAINT PROG FOR R 12/12/85C COMPLETE 1985 5211-85-2092, dated 06/24/85 M53158 3-81 M53200 5-82 ITEM 4.3 - AUTOMATIC ACTUATION OF SHUNT TRIP ATTAC 07/12/84C COMPLETE 1984 Completion of Mod M55641 8-85 SALEM ATHS 1.2 DATA CAPABILITY 03/30/86 COMPLETE 1984 AP 1063 Revised M53724 5-86 SALEM ATHS 2.2 5-R COMPONENTS 12/30/87 ACTIVE 01/1989 vendor Manual Program per MPA B-77 SALEM ATHS 3.2.1 8 3.2.2 S-R COMPONENTS 10/28/85C COMPLETE 1983 5211-83-330, dated 11/08/83 Except Procedures per MPA B-78 M55407 B-87 98/82/85C 00!!PLETE 1983 5211-83-330, dated 11/08/83 M53898 B-88 SALEM ATMS 3.2.3 T.S. 5-R COMPONENTS M53945 3-89 SALEM ATHS 4.2.5 8 4.2.4 LIFE COMPONENTS 10/30/86 B&WOG Activity

HASTER REGULAT0RY INF0RMATION TRACKING $Y$ TEM PAGE NO.s 4' R-1208731-901 FACILITY IMPLEMENTATION 03/31/.

THREE MILE ISLAND 1 (CONTINUATION)

LIC ACT T AC 180. BO'A 0 TiitE COMPLETE STATUS DATE DOCU!!ENTATION OF COMPLETION M55542 S-90 ' SALEM ATHS 4.3 H AND B4H T.S. 09/15/84C COffPLETE 1984 TSCR 115, dated 06/01/84 M53959 S-91 SALEM ATHS 4.4 SSH TEST PROCLDURES 04/30/86 COMPLETE 1933 5211-83-330, dated 11/08/83 M54117 S-92 SALEM ATHS 4.5.1 41VCMSE TRIP FEATURES 10/28/85C COMPLETE 1984 1303-4.1 Revised M54034 3-93 SALEM ATHS 4.5.2 4 4.5.3 TEST ALTERNATIVES 04/30/87 COMPLETE 08/1985 5211-85-2135, dated 08/28/85 M86371 C-Si PHR SECONDARY HATER CHEMISTRY MONITORING REQUIREME 02/20/80C COMPLETE 1979 TSCR 89, dated 10/11/79 M08709 C-03 GUALIFICATIONS OF RADIATION PROTECTION MANAGER 84/30/80C COMPLETE 1977 TSCR 58A, dated 10/06/77 8008613 C-04 FILTER TECN SPECS 06/05/80C COMPLETE 1975 TSCR 7A, dated 10/28/75 9008708 C-05 CONVERSION TO STA.lDARD TECH SPECS 01/20/82C COMPLETE 1983 5211-83-037, dated 02/09/83 M88590 C-06 PUMP SUPPORT-LAMELLAR TEARING 12/12/79C COMPLETE 1980 TLL-327, dated 07/09/80 COMPLETE 1979 CQL 0460, dated 05/08/79 M88615 C-07 FUEL HANDLING ACCIDENT INSIDE CONT AINMENT fgl2/ 31/79C M88086 C-10 CONTROL OF HEAVY LOADS OVER SPENT FUEL POOL 12/01/8tC CANCELLED BY NRC PER TELECON WITH J. THOMA M4Fl31 C-10 CONTROL OF HEAVY LOADS OVER SPENT FUEL POOL J. 01/11/85C COMPLETE 02/1986 Completion of Mod C-14 AUXILIARY FEEDHATER SEISMIC QUALIFICATION 08/ll/83C COMPLETE 1984 Letter - Denton to Weiss 09/26/64 (2.206 response)

M43454 C-15 CONTROL OF HEAVY LOADS - PHASE II (FDLLONUP OF MPA 06/28/85C CANCELLED BY NRC IN CL 85-11, DATED 06/28/85 M52279 C-16 UTILITY RESPONSES TO STAFF RECOMMENDATIONS CONCERN 01/08/86C COMPLETE 03/1986 IEB 85-02 Revised AP-1030, 03/20/86 (AI 85-9175)

M58096

  1. 406103 0-08 DEFICIENCY IN CHEM ADDITION TO CONT AINMENT SPRAYS 84/02/80C COMPLETE 1983 TSCR 107, Rev. 1, dated 01/05/83 9008603 9-10 ASYMMETRIC LOCA LOADS- 03/27/84C ACTIVE Projected Completion 04/87

~

M10109 D-11 FISSIOtt GAS RELEASE 05/16/80C No MPA Written Description Provided More Information Required M68012 D-13 B4H SMALL BREAK ERROR 03/16/79C COMPLETE 1981 Completion of Hod 90084"1 3-14 REACTOR VESSEL HELD - HIRE DEFICIENCY 10/26/79C COMPLETE 1979 Topical Report BAW 1556, 08/X/79 M12327 D-15 HIGH ENERGY LINE BREAK 8 CONSEQUENTIAL SYSTEM FAIL 01/01/70C COMPLETE 1982 Letter 5211-82-170, dated 07/21/82 D-87 DEFINITION OF OPERA 0LE 08/07/84C (X)MPLETE 1984 TSCR 139. Rev. 1, dated 05/11/84 M43043 M51733 D-18 NUREG 0630 CL ADDING MODELS (08N PL ANTS) 10/28/83C COMPLETE 1983 TSCR 127, dated 06/20/83

l 1

MASTER Q-1208731-001 REOULAT0RY INF0RMATION 7 RACKING SYSTEM PAGE NO.s 4*

FACILITY IMPLEMENTATION 8 3/ g g i, TNAEE MILE ISLAND l (CONTINUATION)

LIC ACT TAC Mo. MPA 0 TITLE COMPLETE STATUS DATE DOCUMENTATION OF COMPLETION M55982 D-19 DIESEL GENERATOR RELIABILITY TECM SPECS (GL 84-15) 10/11/85C COMPLETE 1984 5211-84-2242, dated 10/17/84 M46545 E-Gl SPENT FUEL POOL EXPANSIONS 12/19/77C COMPLETE 1977 TSCR 47, dated 02/03/77 MS6195 E-02 FUEL CASK DROP 09/15/81C COMPLETE 03/1985 TSCR 38. Rev. 1, dated 03/05/85 M08611 E-03 CORE RELOADS REQUIRING PRIOR NRC APPROVAL 03/16/79C No Written MPA Description Provided More Information Required M48283 F-05 I.C.t.2/3.0 PROCEDURES GENERATION PACKAGES (NUREG 03/28/84C ACTIVE 09/1986 Respond to Questions 12 & 13 of NRC SER M47257 F-86  !.C.5 FEEDSACK OF OPERATING EXPERIENCE 02/01/82C COMPLETE 1980 Procedure Implemented 12/X/80 M47329 F-07 I.C.6 CORRECT PERFORMANCE OF OPERATING ACTIVITI Ol/01/82C- COMPLETE 1983 IR 82-16, dated 10/05/82 & IR 83-02, dated 03/10/83 M51218 F-08 I.D.t.1 DETAILED CONTROL ROOM DESIGN REVIEN PROGRA 04/08/85C 00MPLETE 02/1985 5211-85-2026, dated 02/14/85 M51299 F-89 I.D.2 SAFETY PARAMETER DISPLAY SYSTEM 12/23/85C ACTIVE 04/1987 Incorporate RG 1.97 Mods into SPDS During Outage 6R-M44;tt F-10 11.0.1 RCS NIGN POINT VENTS 10/17/83C COMPLETE 1984 Completion of Modifications. 01/30/84 M47980 F-11 II.B.2 PLANT SNIELDING 03/28/83C COMPLETE 1984 5211-84-2179, dated 07/27/84 M48284 F-12 II.G.3 POST ACCIDENT SAMPLING 03/22/84C COMPLETE 1984 Completion of Mod M44624 F-14 I I . D .1 RV AND SV TRAINING 08/22/84C COMPLETE 1984 5211-84-2073, dated 03/20/84 M41790 F-16 II.E.9.2.1 AFH SYSTEM INITIATION 09/27/82C ACTIVE 04/1987 Complete HSPS Mods During Outage 6R M44756 F-17 II.E.l.2.2 AFH SYSTEM FLON INDICATION 04/02/81C COMPLETE 1984 TR 84-01, dated 04/09/84 M475tl F-23 II.F.t.4 CONTAINMENT PRES $URE INSTRUMENT 04/20/44C 00MPLETE 1983 5211-83-323, dated 11/28/83 M47712 F-24 II.F.l.5 CONTAINMENT HATER LEVEL INSTRUMENT 84/20/84C COMPLETE 1984 5211-84-2043, dated 03/01/84 M47783 F-25 II.F.1.6 CONTAINMENT NYDROGEN MONITOR 84/20/84C COMPLETE 1983 5211-83-323, dated 11/28/83 M47048 F-26 II.F.2 INSTRUMENTS FOR DETECTION ON INADEGUATE 01/31/87 ACTIVE Projected Completion 11/86 M48285 F-27 II.K.2.9 FMEA ON ICS 08/02/82C COMPLETE 1982 5211-82-145, dated 06/11/82 M54973 F-30 II.K.2.13 THERMAL-MECMANICAL REPORT 06/05/84C 00MPLETE 1980 RAW-1648 M45240 F-31 II.K.2.14 LIFT FREQUENCY OF PORVS AND SVS 04/22/81C COMPLETE 1982 TSCR 103 Rev. 2, dated 05/20/82 M45274 F-56 II . K . 3.1 A6TO PORV ISOLATION 03/ 05/84C Not Required per HPA F-37

_~ _. _ - . _ _ .

=

MASTER REGULAT0RY INF0RMATION TRACKINO $Y$ TEM PAGE NO. 40 R-1288731-801 FAC1LITY IMPLEMENTATION 03/31/8 THREE MILE ISLAND 1 (CONTINUATION)

LIC ACT r TITLE EDMPLETE STATUS DATE DOCUMENTATION OF COMPLETION TAC MD. frA B M 5328 F-37 II.K.3.2 REP 0tf ON PORV FAILURES 95/05/84C COMPLETE 1981 LIL-102, dated 04/06/81 M8216 F-39 II.K.3.5 AUTO TRIP OF RCPS 83/te/83C SEE MPA C-01 M 5671 F-47 II.K.3.17 ECCS OUTA0ES 82/24/82C COMPLETE 1981 5211-81-2243, dated 09/04/81 M8246 F-57 II.K.3.38 58 LOCA METHODS 87/12/85C COMPLETE 01/1985 Letter B&WOG IST Code Verification Plans. 01/03/85 M48288 F-54 II.K.3.31 COMPLIANCE WITN to CFR 50.46 03/34/87 ACTIVE Projected Completion 09/86 M 5987 F-63 III.A.S.2 TECHNICAL SUPPORT CENTER 89/30/86 COMPLETE 1983 5211-83-2336, dated 11/15/83 M46058 F-64 III.A.1.2 OPERATIONAL' SUPPORT CENTER 89/30/86 COMPLETE 1933 5211-83-2118, dated 04/15/83 M6150 F-65 III.A.I.2 EMERGENCY OPERATIONS FACILITY 09/3e/86 COMPLETE 1933 5211-83-2336, dated 11/15/83 M46202 F-66 III.A.1.2 NUCLEAR SATA LINK 12/te/80C NRC Requirement Never Approved M6274 F-67 III.A.2.1 EMERGENCY PLAN UPGRADE TO MEET RULE 83/e9/84C COMPLETE 1980 TLL-700, dated 12/31/80 M8247 F-68 III.A.2.2 METEOROLOGICAL DATA UPGRADE 09/38/86 COMPLETE 1983 5211-83-2118, dated 04/15/83

< M7849 F-70 III.D.3.4 CONTROL ROOM MABITABILITY 08/22/84C ACTIVE 04/1987 Install Mods During Outage 6R M56174 F-78 I.D.1.2 DETAILED CONTROL ROOM REVIEN (FOLLONUP 10 04/08/85C SEE MPA F-08 M49698 G-01 REACTOR COOL ANT PUMP TRIP (D660 - II.K.3.5) 05/28/86 ACTIVE 07/1986 Schedule for Response to NRC CL 86-05, dated 05/29/86 Being Developed

-