ML20206S959
| ML20206S959 | |
| Person / Time | |
|---|---|
| Site: | Harris |
| Issue date: | 09/17/1986 |
| From: | Verrelli D NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Utley E CAROLINA POWER & LIGHT CO. |
| Shared Package | |
| ML20206S963 | List: |
| References | |
| NUDOCS 8609230058 | |
| Download: ML20206S959 (2) | |
See also: IR 05000400/1986057
Text
Uhf
o-
J
.
-
.
September 17, 1986
Docket No. 50-400
License No. CPPR-158
Carolina Power and Light Company
pATTN: Mr. E. E. Utley
Senior Executive Vice President
Power Supply and Engineering
and Construction
P. O. Box 1551~
Raleigh, NC 27602
Gentlemen:
SUBJECT: NRC INSPECTION REPORT NO. 50-400/86-57
$
This refers to the Nuclear Regulatory Commission (NRC) inspection conducted by
F. R. McCoy on July 14-18, 1986.
The inspection included a review of activities
authorized for your Sheron Harris facility. At the conclusion of the inspection,
the findings were discussed with those members of your staff identified in the
enclosed inspection report.
Areas examined during the inspection are identified in the report. Within these
areas, the inspection consisted of selective examinations of procedures and
representative records, interviews with personnel, and observation of activities
in progress.
Within the scope of the inspection, no violations or deviations were identified.
In accordance with 10 CFR 2.790(a), a copy of this letter, its enclosure, and any
reply will be placed in the NRC Public Document Room.
If you wish to withhold
information contained therein, please notify this office by telephone within ten
. days of the date of L51s letter and submit a written application to withhold
information contained therein promptly thereafter.
Such application must be
consistent with the requirement of 10 CFR 2.790(b)(1).
If we do not hear from
_ you in this regard within the period specified above, this letter, its enclosure,
and any reply will be made available to the public and be placed in the NRC
Public Document Room.
Should you have any questions concerning this letter, please contact us.
Sincerely,
( original signed by)
8609230058 860917
ADOCK 05000400
0
David M. Verrelli, Chief
Reactor Projects Branch 2
Division of Reactor Projects
Enclosure:
(See page 2)
' TE,O I
'
,
a
..
.
Carolina Power and Light Company
2
September 17, 198c
Enclosure:
NRC Inspection Report
cc w/ encl:
4. A. Watson, Vice President
Harris Nuclear Project
J.L.Tibbitts,DirectorofRegulatory
-
Compliance
d L. Willis, Plant General Manager
bec w/ encl:
/.Barth,0GC
Z Moore, OGC
. Tedrow, Crystal River
. Sasser, Oconee
C Resident Inspector
Document Control Desk
State of North Carolina
l
,
RI
RII
n )I
RII
(
R
au
FMcCoy:cdg
1N ilspn
CJul an
Fredrickson
Of//f/86
07/(6/86
Of//()/86
Of/l(, /85
. .
.
.
_
_
__
. . _ . - _ _ _
. _ _ _ , .
. .
.
.
.
. .