- _ _

.G AVERAGE DAILY UNIT POWER LEVEL 86-354 DOCKET No.

Hope Creek Gen. Station UNIT 04/06/87 DATE H. Jensen COMPLETED BY (609) 339-5261 TELEPHONE March, 1987 MONTH DAY AVERAGE DAILY. POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)

(MWe-Net) 123 760 i

37 745 707 2

18 797 710 3

39 793 715 4

20 762 714 5

21 682 712 6

22 712 711 7

23 703 715 8

24 922 705 9

25 964 712

.10 26 951 727 11 27 988 883 12 28 1924 911 13 29 1939 905 14 30 954 899 15 31 957 16 k

O C

<t

?-

.e OPERATING DATA REPORT UNIT SHUTDOWNS AND POWER REDUCTIONS86-354 DOCKET NO.

UNIT NAME Hope Creek Gen. Sta.

DATE 04/06/87 COMPLETED BY H. Jensen REPORT MONTH TELEPHONE (609)339-5261 March 1987 METHOD OF SHUTTING DOWN THE TYPE REACTOR OR F FORCED DURATION REASON REDUCING CORRECTIVE ACTION /

NO.

DATE S SCHEDULED (HOURS)

(1)

POWER (2)

COMMENTS 6

03/0:

F 16.3 A

9 Outage No. 5 continued from last month.

Main Steam Line Isolation Valve problems.

7 03/17 S

0 H

5 Power reduced for system stability.

4 k

SUMMARY

I

r OPERATING DATA REPORT DOCKET NO.86-354 UNIT Hope Creek Gen. Sta.

DATE 04/06/87 COMPLETED.BY H. Jensen TELEPHONE (609)339-5261 OPERATING STATUS 1.

REPORTING PERIOD March 1987 GROSS HOURS IN REPORTING PERIOD 744 2.

CURRENTLY AUTHORIZED POWER LEVEL (MWt) 3293 MAX. DEPEND. CAPACITY (MWe-Net) 1039 DESIGN ELECTRICAL RATING (MWe-Net) 1967 3.

POWER LEVEL TO WHICH RESTRICTED (IF ANY) (MWe-Net)

None 4.

REASONS FOR RESTRICTION (IF ANY)

THIS YR TO 5.

NO. OF HOURS REACTOR WAS CRITICAL 740.3 1989

~ CUMULATIVE-MONTH DATE 2277 6.

REACTOR RESERVE SHUTDOWN HOURS 0

0

~

0 7.

HOURS GENERATOR ON LINE 727.7 1964.1 2252.1 8.

UNIT RESERVE SHUTDOWN HOURS 0

0 0

9.

GROSS THERMAL ENERGY GENERATED (MWH) 1,875,996 5,814,835 6,745,243 10.

GROSS ELECTRICAL ENERGY GENERATED (MWH) 626,846 1,962,614 2,260,254 11.

NET ELECTRICAL ENERGY GENERATED (MWH) 599,546 1,881,024 2,166,848 12.

REACTOR SERVICE FACTOR 99.5 92.1,

93.0 13.

REACTOR AVAILABILITY FACTOR 99.5 92.1 93.0 14.

UNIT SERVICE FACTOR 97.8 90.9 92.0 15.

UNIT AVAILABILITY FACTOR 97.8 90.9 92.0 16.

UNIT CAPACITY FACTOR (Using Design MDC) 77.6 83.8 85.2 17.

UNIT CAPACITY FACTOR (Using Design MWe) 75.5 81.6 83.0 18.

UNIT FORCED OUTAGE RATE 2.2 9.1 8.0 19.

SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, & DURATION) : None 20.

IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: NA l

l l

i i

I

q..-'

-HOPE CREEK GENERATING STATION MONTHLY OPERATING

SUMMARY

MARCH 1987 The Hope Creek unit began the month offline and was restarted on March 1, 1987 with the generator being synchronized to the grid at e

1616 on that date.

At 1619 an oil barge on the Delaware River struck' a 599 KV transmission tower resulting in extensive damage to three towers and the Hope Creek /Keeney 599KV transmission line.

As a result of this line loss, the Hope Creek unit is restricted to varying limits as determined by system stability considerations.

On March 2, power was reduced to 690 GMWe for testing of the "B" Secondary Condensate pump after the replacement of the pump's low flow switch logic card which tailed during startup.

On March 12, power was reduced in accordance with OP-AB.ZZ-118(Q),

" Loss of Feedwater Heating",

when a system voltage transient, caused by Salem Unit 2 tripping, _ isolated the

  1. 1/2 Feedwater Heaters.

On March 29, power was reduced 5 MWe below the power restriction to reduce the "A" Recirc Pump MG-Set Motor's speed which was operating at its resonant frequency causing a high vibration.

As of March 31, the unit has been in service for 31 days.

WJM:t1b J

1

,,__m

--___.,..,,m m.

,,,_,,___.,,__,,.m_-3,

.__--..,w----,._

t O PSIEG Public Service Electric and Gas Company P.O. Box L Hancocks Bndge, New Jersey 08038 Hope Creek Operations April 15, 1987 U. S. Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555

Dear Sir:

MONTHLY OPERATING REPORT HOPE CREEK GENERATING STATION UNIT 1 DOCKET NO. 50-354 In compliance with Section 6.9, Reporting Requirements for the Hope Creek Technical Specifications, the operating statistics for March are being forwarded to you.

l Sincerely yours, R. S. Salvesen General Manager -

Hope Creek Operations WJM:tlb Attachment C Distribution l

l l

I i

The Energy People 95 2173(11 @ 12 85