w APR 151987 Docket No. 50-254 Docket No. 50-265 Commonwealth Edison Company ATTN: Mr. Cordell Reed Vice President Post Office Box 767 Chicago, IL 60690
Dear Mr. Reed:
SUBJECT:
REQUALIFICATION PROGRAM-EVALUATION In a telephone conversation between Mr. J. Neal, Plant Training Manager, and Mrs. E. Hare, Operator Licensing Examiner arrangements were made for an evaluation of the requalification program at the Quad Cities Nuclear Power Station. The evaluation visit is scheduled for the weeks of July 13, 1987 and July 20, 1987.
For this visit, the NRC examiner will administer NRC prepared written, oral, and simulator examinations. When the NRC examiner arrives at the site, he will meet with the appropriate facility personnel to review 'the schedule for those examinations. For the examiner to adequately prepare for this visit, it will be necessary for the facility to furnish the approved reference material listed in Enclosure 1, " Reference Material Requirements for Requalification Program Evaluations," at least 60 days prior to the examination date. Review the listed reference material and send any updates to the material already received by the.NRC. Mr. Neal has been advised of our reference material requirements and where they are to be sent.
This request for information was approved by the Office of Management and Budget under Clearance Number 3150-0101, which expires May 31, 1989.
Comments on burden and duplication may be directed to the Office of' Management and Budget, Reports Management Room 32C8, New Executive Office Building, Washington, D. C. 20503.
Thank you for your consideration in this matter.
If you have any questions on the evaluation process, please contact Mr. Dave Hills at 312 790-5600.
1 Sincerely,_
Original Signed By C. W. Hohl 8704210289 870415 PDR ADOCK 05000254 W
PDR Charles W. Hehl, Chief Operations Branch
Enclosure:
As stated RIII RIII RIII RI AM DC& 4h4}ff Ring &
Hills /jlk Bur k
i M
s Commonwealth Edison Company 2
APR I 519r7 cc w/ enclosure:
D. L. Farrar, Director of Nuclear Licensing R. L. Bax, Plant Manager DCS/RSB (RIDS)
Licensing Fee Management Branch Resident Inspector, RIII Richard Hubbard J. W. McCaffrey, Chief, Public Utilities Division J. Neal, Training Supervisor cc w/o enclosure:
R. Bevan, Project Manager, NRR J. Hannon, Acting Branch Chief, OLB
ENCLOSURE 1 Reference Material Requirements for Requalification Program Evaluation 1.
All administrative procedures (as applicable to reactor operation or safety) 2.
All integrated plant procedures (normal or general operating procedures) 3.
Emergency procedures (emergency instructions, abnormal, or special procedures) 4.
Standing orders (important orders which are safety-related to and may supersede the regular procedures) 5.
Fuel-handling and core-loading procedures (initial core-loading procedure, when appropriate) 6.
Annunciator procedures (alarm procedures, including set points) 7.
Radiation protection manual (radiation control manual or procedures) 8.
Technical Specifications
- 10. Lesson plans (training manuals, plant orientation manual, systems descriptions)
Include lesson plans for the following:
D. C. Power Distribution A. C. Power Distribution E. G. C. System Safe Shutdown System Emergency Proudures Remote Shutdown Panel
- 11. Systems operating procedures
- 12. Piping and instrumentation diagrams, electrical single-line diagrams, or flow diagrams
- 13. Copies of facility R0 and SR0 requalification examinations administered during the past 2 years
- 14. A synopsis of the subjects and material covered in the requalification program for the past two years
- 15. An index of administrative, operating, abnormal and emergency procedures
- 16. Plant technical data (curve) book
- 17. Simulator malfunction list with descriptive summary of malfunction effects.
All of the above referenced material should be approved, final issues and should be so marked. Uncontrolled, preliminary, or other such. issues will not be acceptable. All procedures and reference material should be bound or in the form used by the control room operators, with appropriate indexes or tables of contents to ensure efficient use.