Proposed Tech Specs 3/4.3.8 & 3/4.7.6,revising Turbine Overspeed Protection Sys & Turbine Bypass Sys,Respectively, to Reduce Probability of Generating Turbine Missile
ML20206P395
Person / Time
Site: Clinton 
Issue date: 06/30/1986
From:
ILLINOIS POWER CO.
To:
Shared Package
ML20206P385 List:
References
NUDOCS 8607020116
Download: ML20206P395 (2)


Text

_

.... - - - ------. f

..- -..= ~... _. _. - -.._

.(

W & REVIEW COPY 1

INSTRUMENTATION.

1 3/4.3.8 TURBINE OVERSPEED PROTECTION SYSTEM LIMITING CONDITION FOR OPERATION 3.3.8 At least one turbine overspeed protection system sh'all be OPERABLE.

APPLICABILITY: OPERATIONAL CONDITIONS 1 and 2.

ACTION:

~

a, With the above required tu,rbine overspeed protection system otherwise inoperable, within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> isolate.the turbine from the steam supply.

b. Th c.

Pm0$ sions 8 3' S ed-S A^fon 3. 0.9 w e n6-fopica6fc.

P SURVEILLANCE REQUIREMENTS a

4.3.8.1 The provisions of Specification 4.0.4 are not applicable.

4.3.8.2 The above required turbine overspeed protection system shall be demonstrated OPERABLE:

g a.

At least once per 7 days by cycling each of the following valves from the running position and observing valve closure:

1.

Four high-presswe-ttsrtrine-contrcl valves,*

/.8 Four low pressure turbine combined intermediate valves, and

.2..E' Four high pressure turbine stop valves.

M l

C, d At least once per 18 months by performance of a CHt.HNEL CALIBRATION of the turbine overspeed protection instrumentaticn.

de*

At least..once per 40 months by disassembling at least one of each of the e

t-above valves and performing a visual and surface inspection of all valve

'sieats, disks and stems and verifying no unacceptable flaws or excessive L

corrosion.

If unacceptable flaws or excessive corrosion are found, all other valves of that type shall be inspected.

3 c) cl,h3 cach o$ 4k.c, b.

Oft l<asf oncc p<r 31 da.15 b

.goa up en.sse e A A :ne whe\\ u d Jes Crom H <

ru niG n3 po3lbon and o 6s<c via3 od a h ay.

8607020116 860630 PDR ADOCK 05000461 A

PDR CLINTON - UNIT 1 3/4 3-108 JUN 0 4.1995

PROOF & REYlEW COPY l

PLANT SYSTEMS 3/4.7.6 MAIN TURBINE BYPASS SYSTEM LIMITING CONDITION FOR OPERATION 3.7.6 The main turbine bypass system shall be OPERABLE.

-t APPLICABILITY:

OPERATIONAL CONDITION 1.

ACTION:

[i With the main turbine bypass system inoperable, restore the system to OPERABLE status within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> or reduce THERMAL POWER to less than 25% of RATED THERMAL POWER within the next 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />.

k.

--.y t

SURVEILLANCE REQUIREMENTS 4.7.6 The main turbine bypass system shall be demonstrated OPERABLE:

a.

At least once pe ays by cycling each turbine-bypass valve through at least one complete cycle of full travel, and b.

At least once per 18 months by:

1.

Performing a system functional test which includes simulated auto-

.matic actuation and verifying that each automatic valve actuates to --

its correct position.

2.

Demonstrating TURBINE BYPASS SYSTEM RESPONSE TIME meets the following requirements when measured from the initial movement of the main turbi.,ne stop or control valve:

Y

'~'

a) 80% of turbine bypass system capacity shall be established in 5 0.3 seconds.

b)

Bypass valve opening shall start in 1 0.1 seconds.

1 CL'INTON - UNIT 1 3/4 7-16 JUN O4 1c.SS f

,