Proposed Tech Specs 3/4.3.8 & 3/4.7.6,revising Turbine Overspeed Protection Sys & Turbine Bypass Sys,Respectively, to Reduce Probability of Generating Turbine Missile
ML20206P395
Person / Time
Site: Clinton Constellation icon.png
Issue date: 06/30/1986
From:
ILLINOIS POWER CO.
To:
Shared Package
ML20206P385 List:
References
NUDOCS 8607020116
Download: ML20206P395 (2)


Text

_

. -. ..- -..= ~.. . _. _. - - .._ --.__ . . . _ . -. _ . - . .

. .. . - - - ------ . f

. '. .(

. W & REVIEW COPY 1 INSTRUMENTATION. -.

1 3/4.3.8 TURBINE OVERSPEED PROTECTION SYSTEM LIMITING CONDITION FOR OPERATION .

3.3.8 At least one turbine overspeed protection system sh'all be OPERABLE.

APPLICABILITY: OPERATIONAL CONDITIONS 1 and 2.

~

ACTION: , ,

a, With the above required tu,rbine overspeed protection system otherwise --

inoperable, within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> isolate.the turbine from the steam supply. '

b . Th c. Pm0$ sions 8 3'PS ed-S A^fon 3. 0.9 w e n6-fopica6fc.

a SURVEILLANCE REQUIREMENTS 4.3.8.1 The provisions of Specification 4.0.4 are not applicable.  !

4.3.8.2 The above required turbine overspeed protection system shall be demonstrated OPERABLE: g

a. At least once per 7 days by cycling each of the following valves from the running position and observing valve closure:
1. Four high-presswe-ttsrtrine-contrcl valves,* - - - . . - - .

/.8 Four low pressure turbine combined intermediate valves, and '

.2. .E' Four high pressure turbine stop valves.

l MC , d At least once per 18 months by performance of a CHt.HNEL CALIBRATION of the turbine overspeed protection instrumentaticn.

, de* At least..once per 40 months by disassembling at least one of each of the above valves and performing a visual and surface inspection of all valve e

t- >

L 'sieats, disks and stems and verifying no unacceptable flaws or excessive corrosion. If unacceptable flaws or excessive corrosion are found, all other valves of that type shall be inspected.

b3 c) cl,h3 cach o$ 4k.c,

b. Oft l<asf oncc p<r 31 da.15

.goa up en.sse e A A :ne whe\ u d Jes Crom H <

ru niG n3 po3lbon and o 6s<c via3 od a h ay .

8607020116 860630 PDR ADOCK 05000461 A PDR CLINTON - UNIT 1 3/4 3-108 JUN 0 4.1995

1 PROOF & REYlEW COPY l PLANT SYSTEMS 3/4.7.6 MAIN TURBINE BYPASS SYSTEM LIMITING CONDITION FOR OPERATION .

3.7.6 The main turbine bypass system shall be OPERABLE.  ;

-t APPLICABILITY: OPERATIONAL CONDITION 1. _

ACTION:

[i With the main turbine bypass system inoperable, restore the system to OPERABLE  !

status within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> or reduce THERMAL POWER to less than 25% of RATED THERMAL POWER within the next 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />. k.

-- .y t

SURVEILLANCE REQUIREMENTS 4.7.6 The main turbine bypass system shall be demonstrated OPERABLE:

, a. At least once pe ays by cycling each turbine-bypass valve through at least one complete cycle of full travel, and ,

b. At least once per 18 months by: ,
1. Performing a system functional test which includes simulated auto- _

.matic actuation and verifying that each automatic valve actuates to -- .,

its correct position.

2. Demonstrating TURBINE BYPASS SYSTEM RESPONSE TIME meets the following requirements when measured from the initial movement of the main

, turbi.,ne stop or control valve:

'~'

Y a) 80% of turbine bypass system capacity shall be established in 5 0.3 seconds.

b) Bypass valve opening shall start in 1 0.1 seconds.

1 CL'INTON - UNIT 1 3/4 7-16 JUN O4 1c.SS f