Monthly Operating Repts for Mar 1987
ML20206P347
Person / Time
Site: McGuire, Mcguire  Duke Energy icon.png
Issue date: 03/31/1987
From: Reavis J, Tucker H
DUKE POWER CO.
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
NUDOCS 8704210159
Download: ML20206P347 (12)


Text

r OPERATING DATA REPORT DOCKET 50-369 DATE 4-15-87 OPERAT!h6 STATUS.

COMPLETED BY

.T. A. Reavis TELEPHONE 704/373-7567

1. Unit Nase: McSU:RE 1
2. Re;orting Peried: MARCH 1, 1987-MARCH 31, 1997
3. Licenseo Thersal Foner (MWti:

3411

4. Naseplate Rating (6 ess MWe):

1305*

I Notes t'laseplate Rating 1

5. Design Electrical Ratirg (Net MWe):

1180 l (Gross MWe) calculated as I

6. Maxieus Dependable Capacity (Gross MWel 1 1450.000 MVA :.90 pener i
7. Maxinus Dependable Capacity (Net MWe):

1150 i factor per Page 111, i

G. If Changes Occur in tapa-ity Ratings (! tees Nueber 3 Through 7) Since Last I.MUREG-0020.

I Repcrt. 6tve Reasons:

1 1

9. Fener Levei To Wtich Restritted, If Aty (Net MWe):
10. Feasen For Restritticns, If any:........................................................................._

This Month Yr.-to-Date Cuaulative

11. hects in Reporting Feriod

~744.0 2,160.0 46,728.0

12. Nusber Of Hoars Reactor Was Critical 744.0 2,127.7 32,155.6
13. Reactor Reserve Shutdown Hours

. 0..

--0--

--0--

14. Pours Senerator On-Line 744.0 2,075.9 31,703.4
15. Unit Reserve Shutdown Hours

--0--

--0--

--0--

16. Gross Thereal Energy Generated (MWHI 2,537,575 6,933,352 89,827,562
17. Grcss Electrical Energy Generated (MWH) 692,625 2,439,204 31,173,361
18. Net Electrical Energy Generated (MWH) 862,385 2,350,441 29,667,224
19. Unit Service Factor 100.0 96.1 67.9
20. Unit Availability Factor 100.0 96.1 67.9
21. Unit Capacity Factor (' sing MDC Net) 100.8 94.6 54.1 J
22. Unit Capacity Facter (Using DER Net) 98.2 92.2 53.0
23. U7it Fe ced Outage Rate 0.0 3.9 14.0
24. Shut:!ovas Scheduled Over Next 6 Months (Type, Date, and Duration of Eacht:

.....bkuu.............................................................................................................

.......................................=-__-- -_-........................................................................

E5.IfbNtDewnAtEndOfReportPertod.EstisatedDateofStartus:...............................Fo......i.......E...3 26, Urits in Test Status (Frior to Cessercial Operationi:

recas ieve INITIAL CRITICALITY INITIAL ELECTFICITY C09MERCIAL OPERATION 00CrET

....-370 53 8704210159 870331

{DR ADOCK 05000369 Td PDR

/

=

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.

50-369 UNIT McGuire !

DATE April 15, 1987 COMPLETED BY

3. A. Reavis TELEPHONE 704-373-7567 MONTH MARCH, 1987 DAY AVERAGE DAILY F0WER LEVEL DAY AVERAGE DAILY FOWER LEVEL (MWE-Nati (MWE-Net) 1 1161 17

!!63 2-1162 18 1163 3

!!63 19 1162 4

1163 20

!!62 5

!!61 21 1160 6

1162 22

!!60

=.......

7 1163 23 1158 8

!!64 24 1158 9

1164 25 1155 10

!!62 26 1151 11 1156 27 1151 12 1163 28

!!50 13

!!63 29 1150

_-.=_

14

!!62 30

!!50 15 1163 31 1148

..=

__......=

16

!!63

UNIT. SHUTDOWNS-AND' POWER REDUCTIONS DOCKET NO.

50-369 UNIT NAME _MC@UIEE_1________

DATE._Q4415Lg2_________.

REPORT. MONTH _______r1 arch _1992_

' COMPLETED BY _QERA6Q_REAVI_@____

.L j

TELEPHONE _1294)_-323-2262___

ll MET-l l

R HOD E

OF T

A SHU-LICENSE s

N' Y

S TING EVENT SYS-CAUSE AND CORRECTIVE O

P DURATION O

DOWN REPORT TEM COMPONENT ACTION TO.

l DATE E

HOURS N

R/X NO.

CODE CODE PREVENT RECURRENCE I

L l

12-p 87-3-11 lF l A

l HJ VALVEX HEATER. DRAIN PUMP TRIP DN LOW HEATER l

l DRAIN TANK LEVEL'. REPAIR' HEATER DRAIN PUMP DISCHARGE-VALVE 1

1 I

i

-l i

i 1

2 3

4.

I F Forced Reason:

Method:

Exhib'it G - Instructions S Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance.or test 2-Manual Scram Entry. Sheets For Licensee:

C-Refueling 3-Automatic Scram.

Event Report (LER)

{

D-Regulatory Restriction 4-Other (Explain)

' File (NUREG-0161)

E-Operator Training & License, Examination F-Administrative 5

1 G-Operator Error (Explain)

Exhibit I.- Same Source i

H-Other (Explain) i 4

DOCKET NO:

50-369 UNIT:

McGuire 1 DATE:

4/15/87 NARRATIVE

SUMMARY

Month: March, 1987 McGuire Unit 1 operated at 100%_during the month except for a short period on 3/11. A Heater Drain pump tripped off that morning, requiring a 20 MW reduction. The unit returned to 100% later that day and operated there for the remainder of the month.

~

i MONTHLY REFUELING INFORMATION REQUEST 1.

Facility name: McGuire, Unit 1 2.

Scheduled next refueling shutdown:

September, 1987 3.

Scheduled restart following refueling: October, 1987

,4.

Will refueling or resumption of operation thereafter require a technical specification change or other license amendment? Yes If yes, what will these be?

Technical Specification Revision If no, has eload design and core configuration been reviewed by Safety Review Cosmittee ragarding unreviewed safety questions? N/A i

5.

Scheduled date(s) for submitting proposed licensing action and supporting information: N/A 6.

Important licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures).

7.

Number of fuel assemblies (a) in the core:

193 (b) in the spent fuel pool:

221 8.

Present licensed fuel pool capacity:

1463 Size of requested or planned increase:

I 9.

Projected date of last refueling which can be accommodated by present licensed capacity: August, 2010 i

4 r

i l

1 i

DUKE POWER COMPANY DATE: April 15, 1987 Name of

Contact:

J. A. Reavis Phones 704-373-7567 I

OPERATIN6 DATA REFORT DOCKET 50-370 DATE 4-15-87 OPERATING STATUS COMPLETED BY J. A. Reavis TELEPHONE-704/373-7567

1. Unit Name: Mc6UIRE 2
2. Reporting Period MARCH 1, 1987-MARCH 31, 1987
3. Licensed Thereal Poner (MWt):

3411

4. Naseplate Rating (Sross MWel:

1305' i Notes eNaseplate Rating I

5. Design Electrical Fatirg (Net MWe):

!!80 l (6ross MWe) calculated as 1

6. Paxiste Dependable Capacity (6ross MWe):

1 1450.000 MVA

.90 power i

7. Marinas Dependable Capacity (Net MWel:

!!50 i factor per Page ill, I

8. If Changes Occur in Capacity Ratings (Itees llueber 3 Through 7) Since Last i NUREG-0020.

I Report. 6ive Reasons:,,,,,,,,,,,,,_,,,,,,,,_,,,,,,,,,,,,_,,,,,,,,_ _.

l...

.,,,,,,,_,,,,,,,,,,,,,,,I

i. Ftner Leye! To Which Restricted, If Any (Net MWe1
10. ;eason For Restrictions, If any:,,,,,,,,,,,,,,,,,,,_ _,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,_,,,,,,_,,,,,,,,,,,,,,,,,,,,,

This Month Yr.-to-Date Cusalative

!!. Hours in Feporting Period 744.0 2,160.0 27,024.0

12. h eter Of Hours Reactor Was Critical 744.0 2,090.1 19,489.1
13. Reacter Reserve Shutdown Hcurs

--0--

--0--

--0--

14. Hours Generator On-Line 744.0 2,067.0 18,937.2
15. Unit F.eserve Shutdenn Hours

--0--

~0--

--0--

16. Bross Thereal Energy Generated (MWH) 2,537,082 6,574,217 61,274,618
17. Gross Electrical Energy Generated (MWH1 894,969 2,319,207 21,509,197
18. Net Electrical Energy Generated (MW 0 864,834 2,233,104 20,596,529
19. Unit Service Factor 100.0 95.7 70.1 E0. 091t Availability Factor 100.0 95.7 70.1
21. Unit Capacity Facter (Using MDC Net) 101.1 89.9 65.3
22. Unit Capacity Factor (Using CER Net) 98.5 87.6 64.6
23. Unit Forced Outage Rate 0.0 4.3 17.5
24. Shatd v s Schedaled Over Next 6 Months (Type, Date, and Duration of Ea:hl:

.......Rc.f uc Ling...May..b. 19.U... 9..Y.e.6.s,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,

25. If Shut D:wn At End Of Repor t Period. Estimated Da te o f Startups,....................,,,,,_....................,,,,,,,
26. Um ts : 1 Test Status (Pricr to Cessercial Operatted:

Forecast Achieved 1%ITIALCFli!CALITY INITIAL 2LECTRICITY C0'IMERCIAL OPERATICk

P AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.

50-370 UNIT McGuire 2 DATE April 15, 1987 CORPLETED BY J. A. Reavis TELEPHCNE 704-373-7567 MONTH MARCH,1987 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWE-Net)

(MWE-Net) 1 1859 17

!!61

..==

2

!!63 18 1161 3

1863 19

!!61 4

1163 20 1162 5

!!63 21 1163 6

!!63 22 1863 7

!!63 23 1163 9

1162 24 1163 9

1863 25 1164

- =................

10 1160 26

!!64 11

!!60 27 1163 12 1162 28 1163 13 1162 29

!!64 14 1162 30

!!63

_. = - - =........

15

!!62 31

!!67 16

!!61

- - - - - - - - -. ~., - -

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.

_59-32Q__________;.

UNIT NAME _MGQUIRE_2________

DATE _Q441QL82_________

REPORT MONTH _______ Match _1282_

COMPLETED BY _GERALQ_REAVlQ___1 TELEPHONE _12941-323-2562___

l MET-l l

R HDD l

E OF lT l A

SHU-LICENSE N

Y S

TING EVENT SYS-CAUSE AND CORRECTIVE O

P DURATION O

DOWN REPORT TEM COMPONENT ACTION TO DATE E

HOURS N

R/X NO.

CODE CODE PREVENT RECURRENCE l

I i

i NO OUTAGES OR REDUCTIONS DURING MARCH I

2 3

4 F Forced Reason:

Method:

Exhibit G-Instructions S Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance or test 2-Manual Scram Entry Sheets For Licensee C-Refueling 3-Automatic Scram Event Report (LER)

D-Regulatory Restriction 4-Other (Explain)

File (NUREG-0161)

E-Operator Training & License Examination F-Administrative 5

G-Operator Error (Explain)

Exhibit I - Same Source H-Other (Explain)

7 DOCKET NO:

50-370 UNIT:

McGuire 2 DATE: '

4/15/87 NARRATIVE

SUMMARY

' Month:. March, 1987 McGuire Unit 2 operated at 100% throughout the month.

MONTHLY REFUELING INFORMATION REQUEST 1.

Facility name: McGuire, Unit 2 2.

Scheduled next refueling shutdown:

May, 1987 3.

Scheduled restart following refueling: July, 1987 4.

Will refueling or resumption of operation thereafter require a technical specification change or other license amendment? Yes If yes, what will these be?

Technical Specification Revision

~

If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions? N/A 5.

Scheduled date(s) for submitting proposed licensing action and supporting

)

information:

N/A L

6.

Important licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, significant changes in design or new operatfag procedures).

7.

Number of fuel assentlies (a) in the core:

193 (b) in the spent fuel pool:

219 8.

Present licensed fuel pool capacity:

1463 Size of requested or planned increase:

9.

Projected date of last. refueling which can be accommodated by present licensed captacity: August, 2010 DUKE POWER COMPANY DATE: April 15, 1987 Name of

Contact:

J. A. Reavis Phone:

704-373-7567

's :

i McGUIRE NUCLEAR STATION MONTHLY OPERATING STATUS REPORT

-1.

Personnel Exposure For the month of February, no individuals exceeded 10 percent of their allowable annual radiation dose limit.

2.

The total station liquid release for February has been compared with the

- Technical Specifications maximum annual dose connitment and was less than 10 percent of this limit.

The total station gaseous release for February has been' compared with the Technical Specifications maximum annual dose connitment and was less than 10 percent of this limit.

-}

Duxe POWER GOMPANY P.O. HOx 33180 CHARLOTTE, N.C. 28242 HAL H. 'I1JCKER Tzt.zenons vios reasinser (704) 37M831 maanan reonarrios April 15, 1987 U. S. Nuclear Regulatory Commission Attention: Doctament Control Desk Washington, D. C.

20555 Re: McGuire Nuclear Station Docket No. 50-369 and 50-370

Dear Sir:

Please find attached information concerning the performance and operating status of the McGuire Nuclear Station for the month of March, 1987.

Very truly yours,

//J B. n Ay,.

Hal B. Tucker JAR /18/sbn Attachment xc:

Dr. J. Nelson Grace, Regional Administrator American Nuclear Insurers U. S. Nuclear Regulatory Connaission c/o Dottie Sherman, ANI Library Region II The Exchange, Suite 245 101 Marietta Street, NW, Suite 2900 270 Farmington Avenue Atlanta, Georgia 30323 Farmington, CT 06032 Mr. Phil Ross INPO Records Center U. S. Nuclear Regulatory Commission Suite 1500 MNBB-5715 1100 Circle 75 Parkway Washington, D. C.

20555 Atlanta, Georgia 30323 Mr. Darl Hood, Project Manager Mr. Richard G. Oehl, NE-44 Office of Nuclear Reactor Regulation U. S. Department of Energy U. S. Nuclear Regulatory Commission 19901 Germantown Road Washington, D. C.

20555 Germantown, Maryland 20874 Ms. Judy Dovers Mr. W. T. Orders Nuclear Assurance Corporation NRC Resident Inspector 5720 Peachtree Parkway McGuire Nuclear Station Norcross, Georgia 30092 4

y i

_ ~. _ _ - - _

- _ _ _ _ _ ~

_