Enclosure l'
[
o UNITED STATES g
y g-NUCLEAR REGULATORY COMMISSION g,,
- j REGION V
,o'g 1450 MARIA LANE, SUITE 210 4,
WALNUT CREEK, CALIFORNI A 945%
August 4, 1986 MEMORANDUM TO:
Ray As ey, Manager, Nuclear Licensing S h h A,-
FROM:
G.
P.
Perez, Resident Inspector
SUBJECT:
NRC OPEN ITEMS LIST FOR RANCHO SECO This memo is to' document a meeting held with you on July 17, 1986 and the NRC resident staff at Rancho Seco about the Open Item List.
In an effort to assure that the Rancho Seco management is aware of all items that have been identified for further inspect-ion, the Open Item List was given to.you.
This list contains items that have been previously identified by the NRC and have been documented through NRC correspondence, i.e.:
Bulletins, Notices, LER, and Inspection Reports.
If you have any questions in understanding the items on the list please contact me, X4329.
]
j i
l 8608200408 860804 PDR ADOCK 05000312 4
O PDrt i
- t 07/03/86 REGION 5 PAGE 4 DUTSTANDING !TEMS REPORT.
ALL OPEN ITEMS (SORTED BY TYPE)
SMUD RANCHO SECO
......................................................................................................................~..............l DOCKET ITEM.NUM TYPE FOLLOWUP FOLLOWUP STATUS EMPLOYEE ACTICN DATE DESCRIPTIVE BRANCH REPORT NO..
INITIALS TITLE
............................................................y.................................................................y.p...
l t
r..y......................................yy3......y..y.p...y.p.....y.p.........
..........................................................................................................r........................
4
.................................................................................................................................... I 50312 86 04 04 INSP RPT (ENF)
S 0
AEM 0286
~~ SECURITY OFFICER FOUND SLEEPING ON
)
COMPENSATORY POST (TANK FARM) 86=04=05 INSP RPT (ENF)
S 0
AEM 0286 VITAL AREA ALARM ASSESSMENT /
RESPONSE FAILURES IN THREE INSTANCES 86 04 06 INSP RPT (ENF) 8 0
AEH 0286 THREE INSTANCES OF COMPENSATORY MEASURES FAILURES 86 04=07 INSP RPT (ENF)
S 0
AEM 0286 TWO INSTANCES.0E UNSEARCHED AND/OR UNBADGED ENTRY ALLOWED TO THE PROTECTED AREA
- ~'-- 86= 0 4= 08-INSP RPT-(ENF)' ' - ' ~ ~ ~ 5 -" -
0 AEM-'
~
0286"~-~
FOUR INETANCEs 0F-~ INTENTIONAL
"~
TAILGATING OR FAILURE TO CARD INTO VITAL AREAS 86 04-09 INSP RPT (ENF) 8 0
AEM 0286 FAILURE TO PROPERLY ESCORT v!SITORS OR OTHERS NOT AUTHOR!!(D UNE8CORTEC i
ACCESS (NINE INSTANCES)
~ ~ ~ ~ '
86 0 4 10--'I N 8 P~ R P T ~(E NF i --~
' ~~ ~ S
~
O'
~
AEM ~ ~ - '
0286 ~ ~ -- FAILURE 70 SEARCH" VEHICLE ' PRIOR 70 GRANTING ENIRY TO THE PROTECTED AREA 0
0 WGA LICENSEE FAILED TP PROVIDE.
IMPLEMENT AND CONTROL CERTAIN REQUIRED EMERGENCY PROCEDURES
'~ '~
86=07 05' IN8P RPY (ENF) 0
0
~ W G A' ' ~ " -"
~ ~~ ~ ~~ LICENSEE ' FAILED ~TO ESTABLISN TN AT EMERG CR HVAC MET DESIGN REQTS 86=0T=11 INSP RPT (ENF) 0 0
WGA UNCAL'ISRATED CRIMP!NG TOOLS WERE
~^~
NOT CONTROLLED
+
86 08-02 INSP RPT~(ENF)
~R 0
GPP
~~ ~
N0CONTROC0F HTE E00' PMENT --~
1 1
a 07/03/86 REGION 5 PAGE 5 auTSTANDING ITEMS REPORT ALL OPEN ITEMS (SORTED BY TYPEj SMUD RANCHO SECO DOCKET ITEM.NUM TYPE FOLLOWUP FOLLOWUP _ STATUS EMPLOYEE ACTION DATE DESCRIPTIVE BRANCH REPORT NO.
INITIALS IITLE 50312 86-13 01 INSP RPT (ENFi R
0 GPP FAIEURE TO MEET 50.'59 REQUIREMENTS IN REPORTING 86 15-01 INSP RPT (ENF)
M 0
PG FAILORE TO ESTABLISH SURVEILLANCE PROCEDURES 70 !MPLEMENT 10 CFR 50
~
^
APPENDIX !
~ 86'.15'03~~INSP RPT (ENF)" ~
~~ M 0
PGY
^' " FAILURE TO REPORT' IDENTIFIED AND
=
MEASURED ISOTqP(8 (N EPFLUENTS AS REQUIRED BY T.S. 4.21 86 15 05 INSP RPT (ENF)
M O
PGY FAILURE.TO LIMIT LIQUID EFFLUENI DQ8C TO LESS THAN 3 MREM PER YEAR T.8. 3.17.2
- - " " ~ ~
86 15 07 INSP RPT (ENFj~
~
~ H ~~
~
0 -
PG -
~ ~~"-~- "-" Fl! CURE 70 PERFORW"10 CF A 50.'59 EYALUATION TO LIQUID RADWASTE SYSTEM CHANGE 86 15=09 INSP RPT (ENF)
M 0
PGY FAILURE 70 !MPLEMENT AND MAINTAIN LIQUID EFFLUENT PROCEDURES 86=18 02 INSP RPT (ENF)
' R -~~ ~
0 GPP'~
~~~
""~~F A!LUR(~FOR' THE PRC 70 REVIEW ' A '
~
~
~
TEMP. MODIFICATION 86 18=03 INSP RPT (ENFi R
0 GPP TEMP. MOD.' WAS NOT CONTROLLED UNDER APPROVED *ROCEDURE
i
' s 3
07/03/86 REGION 5 PAGE 6 i
~~
OUTSTANDING ITEMS REPORT
~
~
i ALL OPEN ITEMS (SORTED BY TYPE)
SMUD RANCHO SECO 1
DOCKET ITEM.NUM TYPE FOLLOWUP FOLLOWUP STATUS EMPLOYEE ACTION DATE DESCRIPTIVE BRANCH REPORT.NO.
INITIALS _
TITLE i
..............................................................................................g.......................,.............;
....................................................................................................................................l
"~ ~ 5 0 312 ~80-34 01 ~INSP RPT~(FDLLOWUPi "R
~ "
- ~ ~
O'~~~~~
~~"
0683 --
PERM ANENT' RECORD' STOR AGE ~-~" ~ ~'
f* A C ILI T!E 8_ HAVE TO BE BUILT INSP RPT (FOLLOWUPi R
8336 0
0984 i
80'.34 06 !NSP~ RPT '(FOLLOWUPi-- ~ R~ ~ ~
0 ~ ~
~ ~ '~ -- ' ~ 0 6 8 3 UA' WILE AUDIT RECORDS FON'
-~
COMPLETENESS PRIOR To STORAGE !F BLOG'COMPL INSP RPT (FOLLOWUP)
R 8336 0
1284 82=25 01'~!NSP RPT (FOLLOWUPi
~R
'O
--'-'-"~~ 0683-- ~~- ~ RECORDS.COMPUTEIJ FOR TR AINING;WILL ~
~'
SE IN PLACE 1/83 & IN USE 6/83 INSP RPT (FOLLOWUPi R
8317 0
0983
.THREE. MONTH DEL.AY DUE TO SOFTWARE PROBLEMS
-~R' 8336 0
- - ~ - - "
-- ~ 0 9 8 4 --
~ - ' -
~~
83 12 05 INSP RPT (FOLLOWUP 5 M
8312 0
0483 EVALUATE METHQD Ff!MPROV!NG &
SUPPORTING THE'TS RETRAIN!NG PROGRAM
---~ M8P RPT'(FDLLOWUP)
M 8817 0
---~ ~
INSP RPT (FOLLOWUP $
M 8512 0
l - ' ' ~ '
'83 16 02' !NSP RPT'(FOLLOWUP)~
M 0
TESTING'E~CALIB 0F 80TH,~
MONITORING SYSTEMS AMU 5a6A RADWARTE AREA VENT f
i
t e
07/03/86 REGION 5 PAGE 7 OUTSTANDING ITEMS REPORT,
ALL OPEN ITEMS (SORTED BY TYPE 1 SMUD RANCHO SECO DOCKET ITEM.NUM TYPE FOLLOWUP POLLOWUP, STATUS EMPLOYEE ACTION DATE DESCRIPT!VE BRANCM REPORT No.
INITIALS 7!TLE
..............................................................................................................y.y...y...........y.y.
............................................................................................................y.........y...y.y.y...y.
50312 83 16 02 INSP RPT (FOLLOWUP)
- M 8408 0'
- '~
~
WRGM. CALIBRATED',NRC MONITOR CALIB
~
NOT EXAMINE 0=AAU546A NOT IN SERVICE INSP RPT (FOLLOWUP 5 M
8528 0
8611 0
~
~"
~'~~
'-~
TESTING't"CALIB~0F~B0iH MONITORING,
SYSTEMS AHU546A RADWASTE AREA VENT 83 16=12 INSP RPT (FOLLOWUPi M
861,1 0
MIC RX BLOG VENTE NO HI RANGE MONITOR OR SAMPLING RPT PARA 118 5.
' ~" ~
~ "83 36 01 "!NSP~ RPT '(FOLL0WUP5 ~~
'R-8404 0"'
-~
~~~
--~~~~S P ENT FUEL R AdM IN8PECTIONS NEEDED
~
~
~
84=01-02.INSP RPT'(FOLLOWUP)
M 8611 O
MIC NEW WASTE GAS SURGE TANK MONITOR.
LOOK AT TYPE, RANGE & CALIBRATION
~'
84=19=01 "!NSP RPT-(F0LLOWUP)
R 0
JHE
~ - - ~ ~ ~ ~
PREVENTATIVE MAIN ON'HYOROGEN PANEL ALARM NOT BEING PERFORMED i
84 19 02 INSP RPT (FOLLOWUpi R
0 OVERVOLTAGE CHECM IN NN!
SURVEILLANCE NEEDS 70 BE INCLUDFD IN PROCEDURE 84=19 03 INSP RPT (FDLLONUPi R
0"'
'"JHE
~~~~~~'CUIDANCE'POR CODE. SAFETY TE8 TINS
~
NEE 08 CLARIFICATION 84=19 04 INSP RPT (FOLLOWUPi R
0 JHE LICENSEE REVIEW OF BACKUP SEAL REGULATOR OPERATION NEED TO RE EXPANDED ~
84=19 05 INSP RPT (FDLLOWUPi R'
8504 0
~JHE
~
"~~~
~ DOCUMENTED MAINTENANCE
HISTORY NEEDS To BE DEVEL08ED 4
a E
07/03/86 REGION 5 PAGE 8
~~
OUTSTANDING ITEMS REPORT'
~
ALL OPEN ITEMS (SORTED BY TYPE)
SMUD RANCHO SECO DOCKET ITEM.NUM TYPE FOLLOWUP FOLLOWUP STATUS EMPLOYEE ACTION DATE DESCRIPTIVE 8 RANCH REPORT NO.
INITIALS.
TITLE 50312 84=19 08 INSP'RPT (FOLLOWUPi E
O ~
KDI 0386 ~ ~~ 'EAAM(NATION ~0F~ HARDWARE FOR TM!~
!!.E.4.1 HYDROGEN PENETRATIONS NEEDS TO 8E PERFORMED 84=19=09 INSP RPT (FOLLOWUP)
R 0
JHE UPGRADE OF J INVERTER RELIASILITY 84=19=10 INSP RPT (FOLLOWUPi R
0 JHE TURBINE BYPASS ~ VALVE MALFUNCTION 84 19 11 INSP RPT (FOLLOWUP 5 R
0 JHE OPERATOR ACTION PRIOR 70 M EXPLOSION 84 26=01 INSP RPT"(FOLLOWUPi R
0 JHE
' FOLLOWUP'DN LICENSEE'S' ACTIONS FOR HPI BREAKER 4AC4 84 26 02 INSP RPT (FOLLOWUPi R
0 JHE FOLLOWUP OF PROGRAM FOR CHANGING PROCEDURES 70 REFLECT TECH SPEC AMMENOMENTS 84 27=01 INSP RPT (FOLLOWUPi M
8605 0
MIC REEXAMINATION OF LON= LEVEL RADIOACTIVE WASTE STORAGE 8UILDING 84 31 01 IN3P RPT (POLLOWUPi R
0 JHE DA REVIEW OF BULLETIN RESPONSE SYSTEM 84 31 02 INSP RPT (iOLLOWUPi R
0 JHE LICENSEE REVIEW OF EVENTS DURING NOV 1984 HEATUP 85 03-03 INSP RPT (POLLOWUPi M
0 MIC REVIEW LICENSEE 8.ACI!0NS.70 i
IMPROVE THE IMPLEMENTATION OF THE!!:
LAND USE CENSUS PROGRAM
.... i 85-04 01 INSP RPT (FOLLOWUPi R
0 JHE
~ ~" ~ LICENSEE'S ACTION ON AUX FEED STA1T '
TESTING WITH MAINFEED PRESSURE SIGNAL
0 e
07/03/86 REGION 5 PAGE 9 OUTSTANDING ITEMS REPORT ALL OPEN ITEMS (SORTED.8Y TYPE)
SMUD RANCHO SECO DOCKET ITEM.NUM TYPE FOLLOWUP POLLOWUP, STATUS EMPLOYEE ACTION DATE DESCRIPT!VE BRANCH REPORT NO.
INITIALS TITLE
..................................................................................................................y.....y...y.....pe,
................................................................................................................y.....y...y.y......e 50312 85.M. o 2 YN8P RP.T.fFDLLOWUPi -
.R
- " (I~
THE
^ "~~~t'!CE NSEE; REVIEW" AND-VERIFIC ATION_DE.
~
PAST COMMITMENTS AND DESIGN IMPLEMENTATION 85 05 01 INSP RPT (FDLLOWUP)
P 0
KMP EVALUATE CHANGES IN SMUD MANAGEMENT i
1 85 05-02 INSP RPT (FOLLOWUPi
'P 8535 0
KMP
~
~~
~ ~ ' ~ ~~ " ~ ~ ~ ~
^
85=10=01 INSP RPT (FDLLONUPi 3
0 LRJ V'TAL AREA BARRIER DEFICIENCIES At GRADE AND MEZZAN!NE LEVELS
.85 11-01 IN8P'RPT (FOLLOWUP)'
0 8527 0
CYM
~1085'
~'QA' PROGRAM ~DESCRIPT!0N TO BE
~
UPDATED IN USAR AND PROCEDURES 70 BE REFORMATED INSP RPT (FOLLONUP) 0 8531 0
REFORMATTED QA MANUAL 70 BE ISSUED 12/85 85 13 01' INSP RPT (FDLLONUPi R
0 JHE LEAK RATE'WORY 0N'8F" VALVES AND
~
FURTHER TESTING 85 14 01 INSP RPT (FOLLONUP5 E
0 IJB 0486 ROC'BESTOS FIREWALL SR AND FIREWAEL K
3 CABLE 85 14 02 "!NSP RPT (FDLLOWUP5 E'
0 IJB
0486
!MPEMENTATION'0F~EO PROCEDURES L
85-15=01 IN8P RPT (FOLLOWUPi P
0 MMP TRAINING PROGRAM MANAGEMENT RESPONS!81LITIES UPDATED AND FOLLOWED 85 15 02' !NSP RPT (FDLLOWUP5 P ~
0 KMP IMPLEMENT DOCUMENTATION FOR'
~
TRAINING RECORDS
I e
0.7/03./86 _.
OUTSTANDING ITEMS REPORT,
REGION 5 PAGE 10
~ ~~
~~
ALL OPEN ITEMS (8ORTED BY TYPE)
SMUD RANCMD 82C0
..~..~..............................................................................as.s.w.4...............................&...&4....-~
DOCKET ITEM.NUM TYPE FOLLOWUP FOLLOWUP STATUS EMPLOYEE ACTION DATE DESCRIPT!vE BRANCH REPORT NO.,
INITIALS
' TITLE
.....................................................p........................................p.............p.p.p...p.......,.p.....
s l
.n
~
................................................................................................y.............p.....................
' 50312 ' 85 15=03 - !NSP RPT (FOLLOWUPI P'
~ ~
~~
0
~
MMP
- ~~ - -~ " UPDATE E.PCAN 70 !NCORPORATE.
CURRENT TRAINING PROGRAM BY IMPELL 65-16 01 INSP RPT (F0LLOWUPi R
0 JHE NSCW SREAMER INVESTIGATION FOLLOWUP DN RESULTS AND CORRECTIVE ACTIONS
~85 17 01~~1NSP RPT (FOLLOWUP)
E O
'WGA 0286" -'-- ~DISCREP ANCY BETWEEN"TWO PROCEDURES RELATING TO MAINTENANCE INSPECTION DATA REPORTS 85 20=01 INSP RPT (FDLLOWUP) 8 0
LRJ USE OF SECURITY GUARDS ON FIRE BRIGADE 85 20 02
INSP RPT (FOLLOWUP 5 5
0 LRJ
~~
SIMPLIFIED INSTRUCTIONS FDP CAS AND SAS 70 COPE WITH SECURITY EMERGENCIES 85 20 03 INSP RPT (POLLOWUP) 8 0
LRJ LICENSEE PROGRAM 70 REPLACE KEYS AND LOCKS FOR VITAL AREAS INITIATED 85 20 04' INSP RPT (FOLLOWUPi 8
0 LRJ INCON8!87ENCY~0F~A~AND 8 TRAIN RE:
SECURITY UPS STATUS LIGHTS 85 20=05 INSP RPT (FOLLOWUP 5 8
0 LRJ V10LAi!ON:
INADEQUATE ILLUMINATION IN PIT PROVIDING ACCESS 70 TSC O!ESEL FUEL. TANK PIPING 85=20=06"~1NSP RPT (FOLLOWUP) 5 0
LRJ HIGH FREQUENCY OF DUAL ~ COMPUTER FAILURES 85 20=07 INSP RPT (FOLLOWUP 5 8
0 LRJ MARGINAL ON81TE COMMUNICATIONS 3 PLANNED FOR REVIEW'AND UP$RADIN@,
(SEE LICENSEE MEMO DTD 10/10/84) 85 22 01 '!NSP RPT (FOLLOWUPi E
O
'PMG 0686'
-'EYEMPT!04 REQUEST'FA69 AFW PUMP SEPARATION
s
~ ~ " '07/03/86
~
OUTSTANDING ITEMS REPORT
~ ~ ~
~" ~
~
PAGE 11
~
~
REGION 5 ALL OPEN ITEMS (SORTED BY TYPEi SMUD RANCHO SECO DOCKET ITEM.NUM TYPE FOLLOWUP FOLL0 hup STATUS EMPLOYEE ACT!DN DATE DESCRIPT!VE-BRANCH REPORT NO.
INITIALS TITLE.
............................................................................p.......................................y...............
i 50312 85 22 02 IN8P RPT (FDLLOWUPi E
0 ~
PMG 0686 EXEMPTION REQUEST FA69'AFW V4LVE SEPARATION 85 22 03 INSP RPT (FDLLOWUP)
E O
PMQ 0686 EXEMPTION REQUEST FA 68 CABLE SEPARATION INSIDE CONT
O PMQ 0686 EXEMPTION REQUEST FA69 NSCW PUMPS 85=22 04 I
85=22=05 INSP RPT (FDLLOWUPi E
O PMQ 0686 EXEMPTION REQUEST FA RG.1 AUX BLGD CABLE ELECTRICAL PENETRATION AREA 85=22=06 'INSP RPT (FOLLONUPi E
O PMQ
~
0686
~ EXEMPTION REQUEST _'FA R8 1 AUX 8LDG MECHANICAL PENETRATION AREA 85 22 07 INSP RPT (FDLLOWUPi E
0 PMQ 0686 EXEMPTION REQUEST T2 HOUR COLD SHUT 00WN REQUIREMENT 85 22 08 INSP RPT (FOLLOWUPi E
0 PMQ 0686 ~~~
EXEMPTION ~ REQUEST'F4~110 NSRW PUMPS r
j 85 22=09 INSP RPT (FOLLOWUPi E
o PMQ 0686 EXEMPTION REQUEST FA 91 NSE8 ROOF 85 22 10 INSP'RPT (FOLLOWUPi E
0-PMQ~~
'0686
' EXEMPTION ~ REQUEST'FA~T4 AUX'8LDG ROOF, CR HVAC UNIT SEPARATION 85 22 11 INSP RPT (FOLLOWUP 5 E
O PMQ 0686 EXEMPTION REQUEST FA T4 AUX.8LDG ROOF NSCW 8 URGE TANK LEVEL SWITCHE8--
~ ~' ~
85 22 12 INSP 'RPT'~(FOLLOWUPi E~~
~
~ ~~
0
~PMQ- - - - ' ~0686 EXEMPTION REQOEST~FOR"80PPRE8810N 4
IN THE CONTROL ROOM i
L i.
0
[
07/03/86 REGION 5 1
~ ~ - - '
OUTSTANDING ITEMS REPORT
~ ~ ~ ~ - ~ ~ ~ ~ ~ ~ ~
~~"
PAGE 12 ALL OPEN ITEMS (SORTED BY iVPEI SMUD RANCHO SECO
~ ~ -
l
.e...............e....o.......................................................................................... 4..fi.44a.
4... 6E!
DOCKET ITEM.NUM TYPE FOLLOWUP FOLLOWUP STATUS EMPLOYEE ACTION DATE DESCRIPT!VE 8 RANCH REPORT No.'
INITIALS TITLF
..........................................................................................................p.....y.......p...........
50312 85 22=13 INSP RPT (FOLLOWUPi E
0 PMQ 0686 EXEMPTION REQUEST FA 68 RCP Lo COLLECTION SYSTEM 85 25=01 INSP RPT (FOLLONUPi R
0 JHE TWO HANGERS.WERE OBSERVED WITH LOOSE LOCK NUT 8 85 26 01 INSP RPT (FOLLOWUPi P
0 KMP INCLUDE NRC SUGGESTION IN ' '
CORRECTIVE ACTION LIST 85 26=02 INSP RPT (FOLLOWUPi P
0 KMP INCLUDE OFFp!TE IMPROVEMENT IEEMS (CONTRACT) SUPPORT IN CORRECTIVE ACTION LIST 85 26 03 INSP RPT'(FDLLOWUP)
P 8614 0
KMP
~ REVIEW ~THE~ RESPONSIBILITY'TO MAKE PARS IN THE E PLAN AND PROCEDURES 85 26=04 INSP RPT (FOLLONUPi P
0 KMP COMM!iMENT FOR iRAINING IN E PLAN COMPLETED i
~~
85 27 01 INSP RPT (FOLLOWUP) 0 0
CYM
' -- M8RC; CHARTER ~io 8E~ CHANGED TO ADD 50.54(A) REVIEW i
ll i
85 27 02 INSP RPT (FDLLOWUPi 0
0 CYM QAP=27 REVISION REQUIRED to. DELETE REFERENCE TO A VO!DED QCf.T
~ ~ ~ ~ ~ ~ - -
'85 27 03' INSP RPT (FDLLOWUPi 0
0 CYM'
~
-- LICENSEE TO DEVEL'0PE~ PL AN'FOR PROCEDURE CHANGES TO IMPROVE USAR UPDATING BY DECEMBER 1, 1985 INSP RPT (FOLLOWUP) 0 0
ALSO SEE UNR 85 31=01 "AND UNR 85=31 02 i
~-~ ' 8 5 2 8 = 0 4~"~ I N S P RPT-(POLLOWUPi M
'0~~
HIC '~ - -
DEVELOPEMENY"0FPROCEDURES~ AND --~
087AINING HARDWARE NECESSARY FOR I
HANDLING UNDILUTED PASS SAMPLES
I 07/03/86 REGION 5 PAGE 13
(
DUTSTANDING ITEMS RFPORT l
ALL OPEN !TEMS (SORTED BY TYPE)
SMUD RANCHO SECO 2
DOCKET ITEH=NUM TYPE FOLLOWUP FOLLOWUP ~ STATUS EMPLOYEE ACTION DATE DESCRIPTIVE BRANCH REPORT NO.
INITIALS TITLE 50312 85=25=05 INSP RPT (FOLLOPUPi M
0 MIC 8!MPL75! CATION OF PASS OPERATING j
Proct 1URE8 85 28 11. INSP RPT (FOLL OWUP 5 M
8611 0
HIC INSIALLATION OF PERM R15017A AND R150178. REVIEW OF 85 29=01 INSP RPT (FCLLOWUP5 3
0 LRJ REVIEW AND CLARIFY PACKAGE SEARCH PROCEDURE 85 32 01 INSP RPT (FOLLOWUPi R
0 GPP REVIEW ROOT CAUSE REPORT FOR PRZ SAMPLE VALVE BEING OPEN 85=34 06 IN8P RPT (FDLLOWUPi 8
0' LRJ BASIS OF DEftgMINATION 0F
~
REPORTABILITY OF CERTAIN VITAL AAEA ACCESS CONTROL INCIDENTS 85 34 10 IN8P F.PT (FOLLOWUPi 5
0 LRJ REVIEW PERIMETER RESPONSE TIME TO ALARMS 85 34=11 INSP RPT (FOLLOWUPi S
0~
LRJ
~'
~~ REVIEW'"ALL VA~AND~PA PENETRATIONS
~
To ASSURE ADEQUATE PROTECTION 85=34 12 INSP RPT (FOLLOWUPi 5
0 LRJ INCREASED TRAINING STAFF DEDICAIED 70 SECURITY
~ ~ ~ ~ ~ ~ "
~ 85 34 13 IN8P RPT (FOLLOWUP)
S 0
LRJ EsPANDED REPRE8HER'iRAINING REV!EW
~
85 34 14 INSP RPT (FOLLOWUP 5 3
0 LRJ REVIEW EQUI
- MENT ISSUE TO ASSURE
~ SAME 48(USED' EOR GUARD (R&!NING AND QUALIFICATION (PRIM.-HANDSUNi E -~~"--~ 8 3.3 4 15 ~! N S P ' R P T ~ ( F O LL'0 W U P i
'"~ S
~ - - - - -O --~
LRJ- - -
Rf 9fEW LICEN8EE ACTIONS TO CURB ~ ~-'
_TA!LGATIN8
1 07/03/86 REGION 5 PAGE 14
~~
OUTSTANDING ITEMS REPORT,
~ ~ ~ ~ - ~ ~ ~ - - - ~ ~ ~ - - - - - - '
~~ ~
ALL OPEN ITEMS (50*TED BY TYPE)
SMUD RANCM0 SECO
. _ _.o......=.===.......===..e=..====.===.====.....=....=........s...........==........=....=...........======.......?===.........=.===
00CKET ITEM NUM TYPE FOLLOWUP FOLLOWUP. STATUS EMPLOYEE ACTION DATE DESCR!PTIVE GRANCM REPORT.No.
INITIALS TITLE o...............................=............=...........
....................=.............=.=...p......=....r............
-- - ~ - - -
...........................................................................................................=........................
..........................................................=...............=...................................'.....................
56312 85 36 01 INSP RPT (FOLLOWUPi E
~0-~
~~~ REVIEW OF~ REVISED FIRE ~PR0iECf!0N PROCEDURES TO BE CONDUCTED IN.
FUTURE 86 06=01 INSP RPT (FOLLOWUP)
P O
KMP EVALUATE EP TRAINING 86=06=02 INSP RPT (FOLLOWUPi "P-~
0 MMP ~
~' - ~ REVIEW87EPS~TAWEN '70 !MPROVE~
NOTIP! CAT!0N OF PLANT STAFF 70 TANE SAFETY PRECAUTIONS 86 06 03 INSP RPT (FOLLOWUP)
P O
KMP REVIEW STEPS TAKEN TO INSURE UPDATES TO THE OFFSITE AGENCIES
~ ~ ~ -~ -
"86-06=O4 ~!NSP PPT (FOLLOWUPi ' - ~
'P
~
0 KMP -
~ - - ~ REVIEW STEPS TAKEN TO INSURE'EP!P8 4
4RE NAINTAINED 86-06-05 INSP RPT (FOLLOWUPi M
0 KMP EVALUATE ACT!cNs.v!iM.!MPLEMENTAT'N 0F AP 305'AND H2PSA.T
-- - ' - ~ ~~~ ~ 8 6 = 0 6 0 6"~- INSP RPT'(FDLLOWUPi '--' ~ 0
- -- ' O -'~~ ~ ' K M P '
~ - ~ ---"-~EV ALUATE~ CORRECTIVE ACTION ON ' HV AC N0!sE. LEVEL 8'AND TRAIN!NS ON HVAC
)
OPERATION 86 07=02 INSP RPT (FOLLOWUP) 0 0
WGA REEXAMINE LICENSEE ACTION ON MISC
' TRAINING DEFICIENCIES l
~~
~86 07 03 '!NSP RPT~(FOLLOWUPi 0
-~~~~-'O' WGA
~~-
~~
-~~~~~! DADS INDICATED ERRONEDUS FLOWS FOR 1
EMERG CR HVAC SYSTEM j
86 07=06 IN8P RPT (FOLLOWUP 5 0
0 WGA TRAINING OF NON LICENSED OPERATORS IN VALVE OPERATION NEEDS 70 BE EXPANDED
.. _._.-..86=O7-0T' INSP RPT-(FOLLOWUP 5-
-~0~~~
~
-0
' W G A ~-~~
"---- LICENSEE TO REEY AMIME PROCEDURES ~~
70 ASSURE PROPER CONTROL OF NONCONDENSIBLE GASES IN EMERG i
1
t 07/03/86 REGION 5 PAGE 15 0UTSTANDING ITEMS REPORT ALL OPEN ITEMS (SORTED PY TYPE)
SMUD RANCHO SECO a
DOCKET ITEM.NUM TYPE FOLLOWUP FOLLOWUP STATUS EMPLOYEE ACTION DATE DESCRIPTIVE BRANCH REPORT NO.
INITIALS TITLE,
..............................y...................................................................p...p.......y...y.y.p...........p.
~
6.6...i.6.......i.....
50312 86=07=08 INSP RPT (FOLLOWUPi 0
0 WGA
~
~ LICENSEE'TO ADD'PIR HEAT" CURRENT TO
~
! DADS 86 07 09 INSP RPT (FOLLOWUP) 0 0
WGA EVALUATE ADDING PIR.L'EVEL. HEATER INTERLOCK TO PM 8YSTEM 86 07 13 INSP RPT (FOLLOWUP 5 0'
0 WGA
~ NONCONSERVATIVEi'RACTICE RE-CORRECTING SG RE40!NGS FOR STATION BATTERIES 86 07 14 INSP RPT (FOLLOWUP) 0 O
WGA PRACTICE OF PREPARING STATION BATTERIES FOR SERVICE TEST IS QUESTIONED. TIA TO NRR
- ~ - - ~~ ~ ~~ 8 64 0 7 15 ~~ !NSP~RPT-(FOLLOWUP 5 --
0- ~~
- - - - 0
~'WcA - - ~ ~ ~
LICENSEE-TO Pros toe ENHAwCEo~--
TRAINING ON CARE OF STATION BATTERIES 86-07 16 INSP RPT (FOLLOWUP) 0 0
NGA PRACTICE OF. TESTING SATTERIES AT DESIGN RATNER THAN CAPACITY FOR DEGRADATION QUESTIONED. T!A TO NRR
'~~
~~~
'86 08 01~~INSP RPT (FOLLOWUP)
~ 8- ~ ~
0 GPP - --
' -~"~~~~~~ COST ^~B ADOE EVENT !N~ RESTRICTIVE AREA 86 13 02 INSP RPT (FOLLOWUP 5 R
0 GPP LACK OF PROPER CORRECTIVE ACT10NS WHEN 10ENT!FIED VALVES NOT ON PLIDS:
~ ~ ' ' ~
86-14=01-!NSP RPT'(FOLLOWUP 5 P'~~~
"~~~
~ ~ ~ ~ ~KMP- ~ ~ ~
FAILURE TO MAINTAIN E'P TR5IN!NG',
~
0
~
~ ~
~
RE'/IEW CORRECT!_VE ACTION 86 14=,02 INSP RPT (FOLLOWIPi P
0 KMP FAILURE TO MAINTAIN EP AND
~
IMPLEMENTING PROCEDURES, REVIEW CORRECT!vE ACTION
~
" ~ ~ ~ ' -
~86=14 03~ INSP RPT (FDLLOWUP) ""
P 0
~~KMP NEVIENTCORRECTIVETi~CTION 0N'!TEMSi~~
IDENTIFIED OURING LICENSEE'S 50.54T AUDIT Y
g mt_
--m
.______._mm-
- - ___=____
?
07/03/86 I
REGION 5 PAGE 16 0UTSTANDING ITEMS REPORT ALL OPEN ITEMS (SORTED BY TYPE)
SMUD RANCHO SECO I
l
................................................................................................................................... I DOCKET ITEM.NUM TYPE FOLLOWUP FOLLOWUP, STATUS EMPLOYEE ACTION DATE DESCRIPT!VE BRANCH REPORT N0 INITIALS T
3
..............................................................................................................y.ITLE l
................................................................................................................y...............p...
f
. ~.
..........................................................................................................................p.........
1 1
50312 86 14=04 INSP'RPT (FDLLOWUPi P
~
0 KMP EVALUATE THAT'4 REVIEW OF EALS WAS PERFORMED WITH STATE AND LOCAL AGENCIES 86-15 02 INSP RPT (POLLOWUPi M
0 PGY VERIFY IMPROVED HAINTENANCE OF LIQUID EFFLUENT RECORDS t
86 15=04 INSP RPT (FOLLOWUP 3' M
0 PGY'~-
~ ~ ~ - - ~
~
EVALUATE CORRECi!VE ACTIO$~-~
.~- -
REGARDING LIQUID EFFLUENT COMPOSITE SAMPLING 86 15 06 INSP RPT (FDLLOWUP)
M O
PGY FOLLOW UP TO DETERMINE IF RCDWST.
i AND BW87 SHOULD HAVE 10 CURIE LIMIT.I i
86=15 08~ IN8P RPT'(FOLLOWUPi M
0 P G Y ~"
~--~ ~ ~-~ ~ ~ VERIF 'THAT THE LICENBEE UPD ATES FSAR TO CORRECT LIQUID E THE:
86-15=10 INSP RPT (FDLLOMUP3 M
0 PGY VER F C0 Eci!ON OF ERROR ANALYSIS l
l 86 15 11 INSP~RPT (FOLLOWUPi M
^0 PG ' -
~~--~~~ FDL(OW UP TO ~ DETERMINE. IF THE ~-
3 LICENSEC INTENDS 70 CORRECT T.S.
i 6.9.2.3.1 86 15 12 INSP RPT (FDLLONUP3 M
0 PGY VERIFY CORRECTED SEMIANNUAL
{
EFFLUENT RELEASE REPORTS 1
i 86-15 13 INSP RPT (FDLLOWUP5 M
0 PGY'
~-~
' ESTABLISH ~VALIDITv OF~.OQCM' REVISION 1
j TO CHANGE RIDACCUMULATION FACTOR FOR CES!UM 86 17 01 INSP RPT (FOLLOWUP) 0 0
ADH 0986 ESTABLISH FORMAL PROGRAM TO IMPLEMENT. TECH SPEC AMMENOMENTS AND COMMITMENTS ON SURVE!LLANCE
~ ~ ' ~ ~ ~ '
86 17 02 'IN8P RPT (FOLLOWUPi 0
0 ADH 0986 ESTABLISH A FORMAL PROGRAM'TCF CALIBRATE SAFETY.RELATED m
l INSTRUMENTS NOT ADDRESSED BY T.S.
I a
l
}
i 07/03/86 REGION 5 PAGE li OUTSTANDING ITEMS REPORT ALL OPEN ITEMS (SORTED BY TYPE)
SHUD RANCMD SECO DOCKET ITEM =NUM TYPE FOLLOWUP FOLLOWUP, STATUS EMPLOYEE ACTION DATE DESCRIPTIVE BRANCH REPORT No.
INITIALS TITLE
............................................................................................................................y.......
...................................................y..........................................y.............y.y.....y...y...y.......
50312 86 17 03. INSP RPT (FOLLOWUP 5 0
0 ADH
~
POTENTIAL'~ GENERIC IMPLICATION ON
~
BAILEY CRIMPED-TERMINAT!DN FAILURE 86 18 04 INSP RPT (FOLLOWUP)
R 0
GPP WELD ROD CONTROL PROCEDURE NEEDS iO j
BE REVIEWED AFTER NEXT REVISION
^
^~
86 18 07~"!NSP RPT (FOLLOWUPi E
O GPP
~~~
WATER CONTROL!N THE TSC'ON' FIRE
~
~~
~
SYSTEM ACTUATION 86 18 09 INSP RPT (FDLLOWUP5 R
O GPP LICENSEE COMM'!TTED 50 REVISE AMMED.'.
ON ORGANIZATION CHANGE 8
'86 20 01~ INSP RPT (FOLLOWUP 5
'M~
- ' ~ ~ ~ ~
0
' HIC' REVIEW'EFFECT!VENESS OF~ LICENSEE'S i
IMPLEMENTATION OF TECHNICAL SUPPORT OF RADIATION SAFETY 86 20 02 INSP RPT (FOLLOWUPi M
0 MIC EXAMINE LICENSEE'S EVALUATION OF.
O C. !TEMS O!8 CUSSED IN PARAGRAPH g.
3.fF)
~86 20=03' INSP RPT (FOLL'0WUPi M
~~~0' MIC
~mEVIEW'RESULTS OF THE LICENSEE'S EVALUATION DISCU8 SED IN PARAGRAPH 3.'( H i
~
I
E t
07/03286 REGION 5 PAGE 18
~
~
OUTSTANDING ITEMS REPORT,
' - ~ ~ ' ~ ~ ~ ~ "
~
~ ~ ~ ~ ~ ~
~
ALL OPEN ITEMS (SDRTED BY TYPE)
SMUD RANCHO SECO
.'....................................................................................a.i.................................s.i;.i,r.t..v DOCKET ITEM.NUM TYPE FOLLOWUP FOLLOWUP, STATUS EMPLOYEE ACTION DATE DESCRIPTIVE BRANCH REPORT No.
INITIALS
' TITLE l................................................................................................................~...................
~~50312 GL.85-05 GENERIC LETTER"
~0
~
~
~-~-~'0-~~~
--~
-~
~~ INADVERTENT 80RON DILUTION' EVENTS I
GL 85 06 GENERIC LETTER E
0 KDI 0386 GA GU!OANCE.FOR.ATWS EQU!P THAT IS NOT SAFETY.RELATED GL=85-10~' GENERIC LETTER ~
~
~0' O
TAY
~ ~~ ~-~~TS FO R' ~ GL" 8 3 25 IT EM S ~4.'3 A ND 4.'4 i
GL.85 20 GENERIC LETTER 0
O CYM VERIFY STRESS ANA[YSIS PERFORMED ON MODIFIED THERMAL SLEEVE DESIGN FOR HP! N0ZZLE
~"
~ GL=85=22 ~ GENERIC LETTER 0-
-~
0 -
TAY'
~ ~ POTENTIAL FOR" LOSS OF POST.LOCA' RECIRC CAP DUE TO INSULATION DEBRIS BLOCMAGE GL=86=0S GENERIC LETTER E
0 MPR 0886 FOLLOWUP 70 GL83-10 ELF.
IMPLEMENTATION OF TMI ! TEM II.K.3.5
.-_." AUTO TRIP OF RC_PS" m
07/03/86 REGION 5 PAGE 19 OUTSTANDING ITEMS REPORT,
l ALL OPEN ITEMS (802TED BY TYPE)
I SMUD RANCHO SECO DOCKET ITEM.NUM TYPE FOLLOWUP FOLLOWUP STATUS EMPLOYEE ACTION DATE DESCRIPTIVE BRANCH REPORT NO.
INITIALS TITLE
..............................................................................p...............y...................................y.
j
..........................................................................................................y...'.........'............
50312 IN 83=28 INFO NOTICE P
0 LRJ CRITERIA FOR GENERAL' EMERGENCY PROTECTIVE ACTION RECOMMENDAT!0NS IN.85 23 INFO NOTICE O
O INADEQUATE SURVEILLANCE AND POSTMAINTENANCE/P08TMODIFICAT!0N L
~
TESTING SYSTEM IN.85 42 INFO NOTICE C
0 PGY
~~'~~~~~ OOSE PHOSPHOR'IM~PANASONIC 800 SERIES BADGE TLD ELEMENTS IN.85 66 INFO NOTICE O
O TAY DISCREPANCIES BETWEEN AS. BUILT CONST DRAWINGS AND EQUIPMENT INSTALLATIONS
' ~ ~
'!N 85-71 INFO NOTICE
'E
~ 8601 0
CSC 1186'
~ 'C IL'R T IN.85 78 INFO NOTICE P
0 R!F EVENT NOTIFICATION FORM IN.85 80 INF0 NOTICE P
Q RIF TIMELY EMERGENCE CLASSIFICAi!ON AND NOTIFICATION IN.85 91 INFO NOTICE O
0 TAY LOAD SEQUENCERS FOR EDG IN=86=10 INFO NOT!CE P
~
O' ~~
R!F-~
~ ~"-- ~ S PD S M A LF UN C T I O N S " ~~ ~ " - - ~ ' ~ ~
~
1 IN.86 18 INFO NOTICE P
0 RIF NRC ON. SCENE RESPONSE DURING A MAJOR EMERGENCY s
i -
IN.86 27 INFO No!!CE S'
^
~0 LRJ-- ~ ~ ~ ~ ~ ~
ACCESS'CQNTROL AT NUCLEAR
~
i FACILITIES 1
1
07/03/86 REGION 5 PAGE 25
.- OUTSTANDING ITEMS REPORT.
~ ~~ - - -
"-~~-'~~~
~~
~
ALL OPEN ITEMS (SORTED BY TYPE)
SMUD RANCHO SECO
=.
DOCKET ITEM.NUM TYPE FOLLOWUP FOLLOWUP STATUS EMPLOYEE ACTION DATE DESCRIPTIVE 8 RANCH REPORT No.
INITIALS TITLE
............................................................y.......................................................................
50312 IN.86 42" INFO NOTICE' M
0 PGY IMPROPER'HAINTENANCE OF~ RADIATION MONITORING SYSTEMS IN=66=43 INFO NOTICE M
0 PGY PROBLEMS WITM SILVER ZE0 LITE SAMPLING OF A!RBORNE RADIO!ODINE IN.86 44 INFO NOTICE M
0 PGY FAILURE TO FOLLOW PROCEDURES WHEN WORMING IN HIGH RADIATION AREAS IN=86 46 INFO NOTICE M
0 PG9 IMPROPER CLEANING 0F RESPIRATOR PROTECTION EQUIPMENT
-e,.-eee
.4 3
w e.
i 07/03/86 REGION 5 PAGE 25 OUTSTANDING ITEds REPORT 4
ALL ODEN ITEMS (SORTED BY TYPE) l SMUD RANCHO SECO DOCKET ITEM.NUM TYPE FOLLOWUP FOLLOWUP STATUS EMPLOYEE ACTION DATE DESCRIPTIVE BRANCH REPORT NO.
INITIALS TITLE
..............................................................................................................p.g...........p.......
50312 82=22 01 INSP RPT (UNR) 0 0
1082 50.'59 REVIEW OF ENVIRONMENTAL QUALIFICATIONS OF ECN A.2726 TRANSFORMER 83 17 01 INSP RPT (UNR)
R 0
SFP LINER LEAKS 83 22 02 INSP'RPT~(UNR)
~ R 0
TS AMEND 97 MUSi BE APPROVED i
R 8323 0
ANALOG STATUS OF 8FAS SHOULD BE ADDED TO THE CONTROL ROOM P RPF (UNR) - ~-
R'
" 8331' ~~~
O'
"~~~ ~ ~ LICENSEE'FOLLOWED UP~8UT 8'iLI N0t DECIDED ON CORRECTIVE Act!0N l
M 0
PASS OPERA 81 LIT 9 INC.' 10N CHROMAT ATMOSPHERE & OTHERS l ~
~
~
M 8326 0
PASS' PROBLEM LIST OEVELOPED. LIST
~
IDENTIFIED ITEMS AND CURRENT STATUS INSP RPT (UNR)
M 8408 0
CERTAIN PASS PROBLEM LIST ITEMS CORRECTED =80ME' REMAIN UNRESOLVED 1
H 8528 0
R 0
CHECK nN PROV Po!NTER MONTHEY.
SURV AND HISTORY OF !?S POSITION
~
~ ~~~
P O
1983 ANNUAL REVIEW OF EMER'GE'NC
~
~
~ ~ ~ ~
PLAN L
9 07/03/86 REGION 5 PAGE 26 0UTSTANDING ITEMS REPORT.
~- ~~
' ~ ~ ~
ALL OPEN ITEMS (SORTED RY TYPE) 8HUD RANCHO 8ECO DOCKET ITEM.NUM TYPE FOLLOWUP FOLLOWUP STATUS EMPLOYEE ACTION DATE DESCRIPTIVE BRANCH REPORT NO.
INITIALS f!TLE.
...........................................................................................r.............p.....,...............,......
~. - - -. - -
R -
0 JHE
~ ~ 8 ATTERY 'SURVE!LE ANCE ~ TEST-- ~
(DISCHARGE TEST) NOT IN ACCORDANCE WITH TECH SPEC 85 17 02 IN8P RPT (UNR)
E o
WGA 0286 CLA88 I WORK PERFORHED ON A CLASS 2 WORK REQUEST
~
~
~ 8 5 2 3 01 ~ I N SP ' R P T ( U N R )- -~ ----~ ' E - '
8601
~
0-C S' - - --~ 118 6
!ST.NON. CURRENT PROGRAM ~PL'AN~AND C
DELAY IN IMPLEMENTING SER REQUIREMENT 8
- ~
E 8601 0
CSC 1186 IST 4DEQUACY OF IST IMPLEMENTING PROCEDURES
~ ~ ~ ~
~
~'
R"
~'8530~'-~
0~
~JHE ~ ~ ~ -- ~ '~ NCR 'NOT-'!SSUED t!N 8ROKEN CAPSCREWS FOR THE RCP 85 31-01 IN8P RPT (UNR) 0 0
CYM USAR UPDATE REQUIRED TO.!DENTIFY CROSSCONNECTED HP! ALIGNMENT. ALSO :
SEE FOL 85=27 03.
~~ 0
~~~'O
- WGA ~ ~
~ '~
---~~ LICENSEE ~ WILL'ESTABLISM WHETHER~
EMERG,CR HVAC,WA8 AVAILABLE DURING 12/26/85 EVENT 86 0T=12 INSP RPT (UNR) 0 0
WGA LICEN8EE TO PROVIDE. TECH 8A$!S FOR NOT EQUALIZING BATTERY AFTER LOW SGi WAS NOTED
~86 07 17"~!N8P RPT (UNRI' '~ - ~ 0
--- O -"
WGA
~
^~ LICENSEE ~70~ REEXAMINE" UNQUALIFIED SEISMIC CONFIGURATION OF BATTERY RACKS. TIA TO MRR 86 08-03 INSP RPT (UNR)
R 0
GPP SEISMIC QUALIFICATION OF STAT!0N BATTERIES
^
R' O
GPP BATTERIES OPER&BILITY ~
s 07/03/86 REGION 5 PAGE 2t DUTSTANDING ITEMS REPORT ALL OPEN ITEMS (SORTED BY TYPE)
SMUD RANCM0 SECO DCCKET ITEM.NUM TYPE FOLLOWUP FOLLOWUP STATUS EMPLOYEE ACTION DATE DESCRIPTIVE 8 RANCH REPORT NO.
INITIALS 71TLE
..............................................................................................................................p.p...
......................................p....................................................p............p...p...y.p.p.......p.......
i
..............................................._...............................................................................'......,s 50312 86 08 05.. IN8P RPT (UNR).
. R.
~
0 ~
'GPP -
~
BATTERY SURVEILLANCE PROGRAM i
R 0
GPP FAILURE TO REVIEW TEMP MODIFICATION A8 50.59 CHANGE j
~
0
.G P P ' ' ~ ~ ~ ~ ~ ~ ~ ~ ~ DISCREPANCIES WITH L!CENSEE88 7 ~ !
~
-~
PIPING CLA85!FICATION V8 SER.
l 86 18 06 INSP RPT (UM I R
0 GPP CURRENT P! PING CLA85!FICATION DOES NOT IDENTIFY SEISMIC PIPING PAST' THE CLASS I 80UNDARY
-3mehg
-wm.m ie -
e ae e em - -
.we
-we aew.-
we e e mammee wemas-
.mm..W e
M e
om.
++g-=
yewe e.i
,,eemg
- e
-me a.
4 w*
-me w
..O e
_.gew.,
w s
a I
l
s 6
. _07/03/86 PAGE i_.__._.
REGION 9 I
.._ _.. _D O...C..K E T. I. T E.. M.N. U M
._ T_ Y._P__E.. ~
FOLLOWUP FOLLOWUP STATUS ~~ -
ACTION DATE DESCRIPTIVE NAME
' BRANCH'- REPORT NO.
~ ~ ~ ~ ~
TITLE-,~
l I
50312 02 20 81 OTHER 0
0 TAY AUTO.87 ART OF MOTOR = DRIVEN FIRE PUMP DEFEATED
.wa.e m_e.
-ei.
_+
g
..m..w.e,.
_ee I
e e
.aB gu a.
-
- _p.***N**
- 6-*
h d
i l
J I
4
~ 07/03/86 RE010N 5
~"
~
~~~~ ~ ~ ~ ~ ~
~
~~
PAGE 2
'~~
LICENSEE EVENT REPORT
~
~~~
~
DOCKET ITEM.NUM
~ TYPE FOLLOWUP FOLLOWUP STATUS NAME ACTION DATE DESCRIPTIVE
~
^ ' ~ ~
BRANCH" ' REPORT NO.'
~'
~ '
~ T!TLE - - ~~- - ~~ ~ ~
50312 05 27=P PART 21 R
0 PART 21 REPORT 8 WOODWARD GOVERNOR POINTER DISC INTERFERENCE 84=00=P PART 21 0
0 PT21 BBC BROWN BOVERI IN VOLTAGE BALANCE RELAY (ITE.60) 84 04.P PART 21 0
0 PT211 FUEL CONTROL SHAFT ON TDI 85 02.P PART 21 0
0 CYM PART 213 ANACON CL-2 MONITORS 85 04.P PART 21 0
0 CYM PART 213 08R OR 08RV TDI DG AIR FILTER IN ENGINE CONTROL PANEL 85=07.P PART 21 0
0 CYH PART 21 CHECK VALVE iN THE ON= ENGINE MOUNTED STARTING A!R P!P!NC 85-08-P PART 21 0
0 PART 21 REPORT O!L PLUG 8 IN
_ CRANKSHAFT ON TDIDG_JENTERED_TV) 85 11.P PART 21 0
0 TAY PART 218 CLOW WILLIAM 8.HAGAR CHECK VALVE ON 70! = LOG SHEET NO. 69 85 13.P PART 21 0
0 TAY PART 21 TDI ENQINE GENERATOR CONTROL PANEL 85 14.P PART 21 0
0 TAY PART 211 LIMITORQUE VALVE ACTUATORS 85 15.P PART 21 0
0 TAY PART 21 TEC MODEL 91a.1. DEFECTIVE TI TL490CN ANALOG LEVEL DETECTOR 85=20=P PART 21 0
0 CYM PART 21: DEFECT ON UNDERVOLTAGE TRIP DEVICE USED ON AKEANR GE CIRCUIT BREAKERS
07/03/86 REGION 5 PAGE 3
~ ~
LICEN8EE EVENT REPORT
~ ~ ~ '
~
~~
" - - " " ~ ~
~
DOCKET ITEM.NUM
~
TYPE FOLLOWUP FOLLOWUP STATUS NAME ACTION DATE DESCRIPTIVE
~
BRANCH REPORT No.
" TITLE
~~" ~~
50312 85 22.P PART 21 0
0 TAY PART 218 INTAKE SILENCER NOT WELDED IN PLACE _
85 23=P PART 21 0
0 TAY PART 21: ROSEMOUNT PERF SPEC REPORT 00E8 NOT ADORESS ZERO SHIFT DUE TO PROCESS PRESS 85 24.P PART 21 0
0 TAY PART 21 0!L LEVEL. DEVICE ON AF PUMP 18 NOT RELIABL_E 86=01.P PART 21 E
o TAY PART 218 PR08LEM W!TM STARTING AIR VALVE ASSEMBLY 86-03.P PART 21 E
O TAY PART 21: WOODWARD GOVERNOR 86 04=P PART 21 E
o TAY PART 213 ENGINE MOUNTED FUEL O!L LINE 86-07.P PART 21 E
o TAY PART 218 OVERSPEED GOV & FUEL TRANSFER PUMP DRIVE 86 08.P PART 21 E
O TAY PART 258. TUR80 CHARGER THRUST SEARING LUBE 86=10=P PART 21 E
O TAY PART fit LUBE CIL CHECK VALVES 86 13=P PART 21 0
0 TAY PART 21. CHECK VALVES M'Y HAVE A
MISSING LOCK WLDS ON HINGE SUPPORTS 86 14=P PART 21 E
O TAY PART 21. AUTOMATIC SPRINKLER MODEL C DELUGE VALVE 8 FA! LED To OPEN 86 15.P PART 21 R
0 MPR PART 21 =. VALVE OPERATOR MOTOR LEAD INSULATION, DEVIATION IN OUALI?Y IN REPLACEMENT MOTOR ACTUATORS
I t
07/03/86 f
REGION 5 PAGE 4 LICENSEE EVENT REPORT 1
i DOCKET ITEM.NUM TYPE FOLLOWUP FOLLOWUP, STATUS NAME ACTION DATE DE8CRIPTIVE i
BRANCH REPORT No.
.................................................................................................... TITLE l
..................................................................................................................................I 1
50312 86=16=P PART 21 E
o TAY PART 21. TDI SUMP TANK FOOT VALVE i
i i
r P
-.=w.
we
- IN' "9*
-h.*=*'*"M" ym.,,,
,m,
.e_m-,e,
,,,.ewW4m m e.
me
._.._e
= -
~. _
+M m em en
.emma
++
e se h am memem + ems.,e enwm wuse.
m.mo...
_, omg i p e, em.,,.ema.-e amm ammism e
em em
-.mme
-0.e e-,-em
,_.,,a._.
,m 1
e l
07/._03/86 REGION 5, p PAGE 5 g
~
DCCMET ITEM.NUM TYPE FOLLOWUP FOLLOWUP STATUS NAME ACTION DATE
~'
DESCRIPTIVE
" ~ ~ ~ ~ -" -
~
~
BRANCH REPORT NO.
TITLE
'-'..........................................................................................~..........................................
50312 80=23=T0 REPORTABLE OCCU R
0 DRE88ER PORV AND CODE SAFETY V A L V E S O N L..Y.. D..E_.S._I G__N E D F O R _. _...
REPORTABLE OCCU R
8121 0
PEND MANFACT RPT AND LICENSEE FULL PPT REPORTABLE OCCU R
8238 0
0383 MORE INFO WILL BE AVAILABLE IN 83 DN SAFETY VALVE OPERAS!LITY 80 26 70 REPORTABLE OCCU R
0 0683 SUSC00 LING REQUIREMENT RESULTS IN GREATER OFF8ITE DORE FOR OT8G LEAK REPORTABLE OCCU R
8121 0
0683 PEND ATOG GUIDELINES AND REVISE FSAR 4
l i
O 07/03/86 REGION 5 PAGE 6 LICENSEE EVENT REPORT DOCKET ITEM.NUM TYPE FOLLOWUP FOLLOWUP. STATUS NAME ACTION DATE DESCRIPTIVE BRANCM REPORT No.
TITLE
..a............................................................................................e.a.a..........L.........'....;.i....
50312 79 21=L2 REPORTABLE OCCU R
0 0683 REPLACEMENY or HA!N FW N0ZZLES
.DELAVED FROM 8.1. 70 82 R E F U E L I..N.G.
REPORTABLE OCCU R
8121 0
0683 REPLACE FW N0ZZLES 1982 OUTAGE REPORTABLE OCCU R
8317 0
0485 81-19.L0 REPORTABLE OCCU M
0 A0H POSSIBLE DEGRADATION OF POST ACCIDENT SAMPLE SYSTEM DUE 70 QB87RUCTION REPORTABLE OCCU M
8121 0
POSS!RLE.!NSTAL OF NONFOUL SUCTIONS 81 39.L0 REPORTABLE OCCU R
0 LOW SWITCMYARD VOLTAGE CONDITION DIE 8ELS STARTED FOR SAFETY BUSSES REPORTABLE OCCU R
8238 0
0683 WILL FOLLOW AS PART OF 9/20/82 LTR i
COMMITMENTS =8EE DAVE TMORPE 83 0T=L1 REPORTABLE OCCU R
8302 0
CYM FOLLOWUP TO 83 07 AND 83 17 RCP POWER RELAY 8 83 17.L1 REPORTABLE OCCU R
8502 0
CYM REPLACEM(Ni 0F WILMAR ELECTRONICS RELAYS 70 BE EVALUATED i
83 24.L0 REPORTABLE OCCU R
8502 0
CYM
'88 NUCLEAR SERVICE. RAW WATER PUMP I
TRIPPED DUE TO CABLE GROUNDING 83 3f=LO REPORTABLE OCCU R
0 FAILURE OF 8A8 EMERGENCY SUMP YA(yE.
TO OPE _N.FO_L_ LOW.U_P RP f DUE.- B.Y 1/7. /8 4 I'
REPORTABLE OCCU R
0 FAILURE OF "A'
EMERGENCY $ UMP i
VALVE TO OPEN. FOLLOWUP REPORT i
}
f I
a
a l
0T/03/86 REGION 5 PAGE T
_ _ _ _. - - - ~
LICENSEE EVENT" REPORT ~
~
' -~
~
~ ~ ' ' -
- ~ ~ ~' ~ --
i
~ ~ ~e...................................................................................................................................
DOCKET I T E M.N U_M_._ __.
T.k_P E. ~
FOLLOWUP FOLLOWUP. STATUS NAME ACTION DATE' - - ~
' ' - ~
~ ~ TI TLE - - ~ --
BR NCH -' REPORT No.~ ~
~'
DESCRIPTIVE 1
t i.G a.u s.a.h ;6 a..ahi. a...a.. 6 G.u.
...................G ei..ea..i& i... 6 e6.4.4 6 u yai. iia........s;&W............;aisi.2 e e...?.'i. d.
.i 4...................................................................'.....................
~
50312
'83 37.L1 REPORTABLE OCCU R
8502 0
CYM MOTOR OPERATOR FOR VALVE HV.26105 WOULO NOT OPEN VALVE 84 04=LO REPORTABLE OCCU R
0 FA! LURE OF POWER SUPPLt ID i
METEOROLOGICAL TOWER 84 05.L0 REPORTABLE OCCU R
0 IN0PERABILITY OF EMERGENCY' EVACUATION S!RENS 84 0T=LO REPORTABLE OCCU R
0 react 0R TRIP DUE TO SLOW FEEDWATER.8Y87EM RE8PONSE'AND GRID UPSET
~
~
84=10.LO' REPORTABLE OCCU R
0 PART!AL PERFORMANCE OF 180LATION VALVE SURVE!LLANCE TEST j
84 11=LO REPORTABLE OCCU R
0 INCORRECi CONFIGURATION
~ ~ ~ ~ ~
TABLE IN SURVE!LLANCE'-~
j
~
84=15=LO ' REPORTABLE OCCU R
0 GENERATOR HYOR0 GEN EMPLOS!0N~
PROCEDURE 8 j
i AND FIRE AND LOSS OF NON. NUCLEAR- - - ~ ~ ~ ~ ~ ~ ' ~
!N87RUMENTS t.
~
84 16=LO REPORTABLE OCCU R
0 CONTAINMENT ISOLAT!DN VALVE STR0KE'T!ME IN EXCESS OF TECH SPEC LIMIT j
84 16=L1 REPORTABLE OCCU R
0 CYM PROGRAM' CHANCED TO RESOLVE.0 PEN i
_ _._______ ITEMS DURING SMUTDOWN PRIOR TO ____
84 18.L0 REPORTABLE OCCU 0
0 LEAK!NG SOURDON TUBE PRE 88URE
~
~
SN!TCH RESULTED IN SPURIOUS MSLB, LOGIC ACTUATION CAUSING REACTOR TRP 84 18.L'1 REPORTABLE OCCU 0
0 CYM LEAKING 80URDON TUBE PRESSURE SWTCH
. RESULTED I_N SPURIOUS MSLB LOGIC.. _
i REPORTABLE 0CCU 0
8414 0
LICEN8EE COMMITTED TO SUSMIT REV! BED LER TO CLARIFY EVENT ANALYS I
i
e
.s e
r 07/03/86 REGION 5 PAGE 8 LICENSEE EVENT REPORT 1
...............................................................................................................................s...s DOCKET ITEM.NUM TYPE FOLLOWUP FOLLOWUP STATUS NAME ACTION DATE DESCRIPT1VE i
BRANCH REPORT NO.
TITLE i
)
..............................................................................................................y.....................f 1
50312 84 18=L1 REPORTABLE OCCU 0
8502 0
REPORTABLE OCCU 0
8527 0
i 84 20=LO REPORTARLE OCCU 0
8502 0
CYM OT8G B TUBE (EAKAGE IN EXCESS 0F 1 GPM,_ UNUSUAL EVENT. DECLAR(D_
RX TRIP. ERR 0NEDUS M8LB ACTUATE REPORTABLE OCCU 0
8527 0
i 84 22.L0 REPORTA8LE OCCU R
0 OTSG 'A8 TUBE LEAK RESULTED IN
_,_______A 2 G_PM LE_AK RATE WHICH EXCEEDE_D_.
p 84 22=L1 REPORTABLE OCCU R
0 SUPPLEMENT REPORTS OFFSITE RELEASE 8 i
RESULTING FROM 078G "A" TUSE LEAK i
84=24=LO REPORTABLE OCCU R
0 SIMULTANE0US PLANT HEATUP AND DEBORATION VIOLATED PROCEDURAL CONTROL OF REACTIVITY ADDITION 84=25.L0 REPORTABLE OCCU R
0 REACTOR TRIP DUE TO FE(0 WATER TRAN8!ENTsAL80 AUX. FEED SYS.PROSS WITH VALVE AND PRESSURE SWITCH 85=01.L0 REPORTABLE OCCU R
0 H2 MONITOR 8YSTEM CONTAINMENT ISOLATION VALVES _FOUND OPEN FOR I
SEVEN DAYS
]
85=01=L1 REPORTABLE OCCU R
0 ACH CORRECTS REPORTING CRITERIA AND l
DATE WHEN VALVES WERE LOGGED CLOSED i
REPORTABLE OCCU R
0 LOSS OF CONTAINMENT INTEGRITY VIA i
. OPEN VALVES ____ _,
REPORTABLE OCCU R
0 REACTOR COOLANT SYSTEM NONISOLABLE LEAK 1
I
o 1,
e 07/03/86 REGION 5 i~~
~ ~~
- ~-
LICENSEE EVENT REPORT
' ' ~ ~ ~ ' ~
PAGE 9
^"
DOCKET ITEM.NUM '
FOLLOWUP FOLLOWUP STATUS NAME ACTION DATE DESCRIPTIVE TYPE l - ~~ ' "
BRANCH REPORT No.'
. TITL E - - ~ ~ f -~ ~-
4 l
50312 85 02.L0 REPORTABLE OCCU R
0 UNRESTRAINED HEAVY LOAD IN REACTOR SUILDING I
85 03=LO REPORTABLE OCCU 0
0 INCORRECT BORON CONCENTRATION TECH 8PEC LIMIT ~
~~
REPORTABLE OCCU 0
0 TIA DATED APRIL 295 '1985'.' REQUESTED
- - ~ ~ -REVIEN OF LICENSEE ANAL OF SHUTDOWN R
K-URING REFUECING8
~~~
85 04=LO REPORTABLE OCCU R
O FIRE DAMPERS NOT INSTALLED.48 l
REQUIRED BY FIRE HAZARDS ANALYSIS 85 05=LO REPORTABLE OCCU R
0 CYM CLO8ED 80 RATION PATH DURING FUEL MOVEMENT 85 07.L0 REPORTABLE OCCU R
0 CYM UNDERVOLTAGE RELAY CALIBRATION FOUND OUT OF SPEC 85 08=LO REPORTABLE OCCU R
0 CYM FIRE SUPPRESSION SYS. SURVEILLANCE INTERVAL EXCEEDED TECH 8PEC ROMT
_ _... _.._ DUE 'TO' SCHEDULING ~ ERROR * ~-- ~
85 09=LO REPORTABLE OCCU R
0 CYM DIESEL GENERATOR CONTROL CIRCU!TPY INADEQUATE OURING NORMAL SHUTDOWN 8EQUENCE.70 RESPOND TO UNDERVOLT 85 10=LO REPORTABLE OCCU R
0 CYM NON!80LABLE LEAK IN HOT LEG HIGH POINT VENT PIPING DUE TO FATIGUE
" CRACK RESULT 8G FROM MI88'G SUPPORTS 85=11.LO REPORTABLE OCCU 0
0 CYM RPS CHANNEL TRIP ON HIGH PRESSURE SETPOINT (1820P81) 0F SHUTDOWN SYPA88 DUE TO OPERATOR ERROR 85 12.LO REPORTABLE OCCU 0
0 CYM LOS8 OF REACTOR BUILDING INTEGRITY
~~~
' - - ~ ~
DUE 70 UNBECURED.0 UTER HATCH.
PERSONNEL ERROR. 8UPPLEMENT 10/31 REPORTABLE OCCU 0
8527 0
FOLLOWUP 70 BE SUBMITTED ev OCT. 31
e 4
07/03/86 REGION 5 PAGE 10 LICENSEE EVENT REPORT DOCKET ITEM.NUM TYPE FOLLOWUP FOLLOWUP STATUS NAME ACTION DATE DESCRIPTIVE BRANCM REPORT NO.'
~
TITLE.
..................................................................................................y............_._...............yy...
50312 85-13.LO REPORTABLE OCCU 0
8603 0
DJW AUT0 START OF DIE 8EL GENERATOR DUE TO OVERVOLTAGE ON SAFETY,5US
_ LONG TERM CORRECT!.VE ACTION PENDING 85 18.L0 REPORTABLE OCCU R
0 CYM CLAS8 2 BREAKER INSTALLED OURING MAINTENANCE ON NOCW PUMP 85-15=Lo REPORTABLE OCCU R
0 CYM AUTO START OF DG DUE TO ACCIDENTAL
'- LOS8 0F PDMER TO NUCLEAR SERVICE SUS =XCONNECT~ BREAKER' FAILED OPEN 85-14=LO REPORTABLE OCCU R
0 CYM 8PURIOUS CLOSURE OF DMR ISOLATION VALVE DUE TO PRES 8URE TRAN8MITTER ELECTRICAL SP! KING 85-17=LO REPORTABLE OCCU R
0 CYM LEAK IN AUX BLDG VENTILATION SYSTEM
~
DUE TO MISSING SEAL PLATE IN HEPA FILTER SINCE' MANUFACTURE ~~~~~~~
85 14=LO REPORTABLE OCCU R
0 CYM EDG OUTPUT BREAKER LOCKOUT 85-19=LO REPORTABLE OCCU R
0 CYM EXCESS C00LDOWN RATE AFTER H! PRES 8 RX TRIP DUE TO OPEN FEEDWATER MEATER RELIEF VALVES 85 20=LO REPORT 48LE CCCU R
0 CYM ESSENTIAL MVAC FLOW CONTROLLER' DESIGN EBROR PREVENTS AUTO CONTROL AFTER RETURN OF power 85 21.L0 REPORTABLE OCCU R
0 CYM EDC AUTOSTART DUE 70 PERSONNEL ERR 08 WHILE TROUBLESHOOTING DV RELAY =ALSO FAN' FAILDUE 70 SP' DRIFT
~
~
85 22.L0 REPORTABLE OCCU 0
0 CYM PZR LIQU!D SAMPLE VALVE FOUND OPEN VIOLATING APP.' R COMMITMENT.
SUPPLEMENT AFTER ROOT CAUSE ANAL 85=24.L0 REPORTABLE OCCU R
0 CYM SHUTDOWN DUE TO RC8 LEAKAGE GREATER
~ ~ ' ~ ~
THAN 10 GPM FROM PZR LGD SAMPLE VALVE 8FV.7001' PACKING GLAND' 85=25=LO REPORTABLE OCCU R
0 CYM REACTOR TRIP FOLLOWING LOSS OF ICS POWER s
o
.o e
PAGt 11 REGION 5 07/03/86
'~
LICENSEE EVENT REPORT
~~
~
-"-~ ~ ~~
~
~
I DESCRIPTIVE i
DOCKET ITEM.NUM TYPE ~~
POLLOMUP FOLLOWUP STATUS NAME ACTION DATE'--~~'-
~
~ TITLE.
'~~~
~
BRANCH REPORT No.
!~~~--
i i
i 1
i 50312 86 02.LO REPORTABLE OCCU 0
0 ADH PINHOLE LEAK 8 IN CA8ING DRAIN LINE FOR 8 DECA _Y HEAT PUMP I
I 86 03.L0 REPORTABLE OCCU 0
0 40H CONTA!NMENT PURGE UNMONITORED l
86 04=LO REPORTABLE OCCU 0
0 ADH MISSED FIRE WATCH ON INOPERABLE FIRE C00R 86 05.LO REPORTABLE OCCU 0
0 ADH SE!8MIC SPACING OF NUCLEAR SERVICE BATTERIE8 4
l l
aw we 4
. -=.
e e
W-l l
I
.. s c'
1 i
07/03/86 REGION 5 PAGE 12 i
~ ~
LICENSEE EVENT REPORT
'~ ~ ~ ~
~
I I
4 DOCKET ITEM.NUM TYPE FOLLOWUP FOLLOWUP STATUS NAME ACTION DATE DESCRIPTIVE
- TITLE, BRANCH.
PEPORT NO.
j
~
j s
50312 81 59.XO SPECIAL RPT.
0 0
TAY HOURLY FIRE WATCH POSTED VICE CONT (NUOUS WATCH. TECH SPEC 3.ta.6.2 j
0 0
TAY FIRE WATCH NOT PERFORMED FOR THREE 82 01=X0 SPECIAL RPT.
HOURS DUE TO AIRBORNE RADIDACTIVITY i
j 82 02.X0 SPECIAL RPT.
0 0
TAY HOURLY FIRE WATCH IN
'8" DIE 8EL GENERATOR ROOM NOT CONOUCTED FOR 2
FOUR HOURS 82 27.X1 SPECIAL RPT.
R 0
WEEKLY SURVEILLANCE OF. NITROGEN SYS FOUND XE.133 CONTAMINATION 4
i 83 01.X0 SPECIAL RPT.
0 o
TAY SPECIAL REPORT =RCP FIRE DETECTORS NOT TESTED AS REQUIRED ~
~ ~ ' " '
l 83 02.XO SPECIAL RPT.
0 0
TAY HDTOR DRIVEN FIRE PUMP OUT OF SERV!CE OVER T DAYS FOR M&!NTENANCE 83 03.XO SPECIAL RPT.
0 0
TAY UNAVAILABILITY OF FIRE SUPPRESSION WATER SUPPLIES (SPECIAL.REPORTI ~ ~~~
~
~
53=04.XO SPECIAL RPT.
R 0
UNAVAILABILITY OF TWO HIGH PRESSURE FIRE PUMP 3 1
l 83 05.X1 SPECIAL RPT.
R 0
REVISION TO REPORT ON STEAM GFNERATCR TUBE PLUSGING 83 07.X0 SPECIAL RPT.
R 0
MEAT TRACING F/HYOR0 GEN MONITORING d
R 0
THERMAL BMIELDS NOT IN8TALLED IN
+
HYDROGEN MON 8YSTEM HANGERS i
83 3t=X0 SPECIAL RPT.
R 0
DELAY IN NOT!PY!NG OPERaiORE.0F.
LOW CCNCENTRATION IN BORIC ACID
. y l
STORAGE TANK i
. ~
1 l
,)
t e
i 07/03/86 REGION 5
_....- ~ ~ ~~
LICENBEE EVENT REPORT
' ~ ~ ' '
~~ ~~ ~ ~ - '~~-- PAGE 13 I
i f
j
_DnCNET ITEM.NUM TYPE FOLLOWUP FOLLOWUP, STATUS NAME ACTION DATE DESCRIPT!VE BRANCH' REPORT NO.
" ~ ~
~~
TITLE
~ ~ ' - - ~ -
l h
i
[
...................................................................................................................................i i
50312 84 03.x0 SPECIAL RPT.
R 0
CRACKS IN SWITCH JAWS OF WESTINGHOUSE TYPE MG.6 RELAYS DUE TO MANUFACTURING ~DEFZCT ~
84 04.X0 SPECIAL RPT.
R 0
ELECTROMATIC RELIEF VALVE (EMOVI LEAKING UNDER LOW PRESSURE CONDIT!ONS I
y i
i i
s i
1 1
b i
~-
a i
l I
j
?
i f
i
[,
]
o-UNITED STATES E
( (,g NUCLEAR REGULATORY COMMISSION g,' \\.
, ' / t:- j REGION V SN g
1450 MARIA LANE,SulTE 210
,o WALNUT CREEK, CALIFORNIA 94596 August 4, 1986 MEMORANDUM TO:
Public Document Room
).)ICkDby FROM:
G.
P.
Perez, Resident Inspector, Rancho Seco
SUBJECT:
NRC OPEN ITEM LIST FOR RANCHO SECO, DOCKET #50-312 The enclosed attachments are the Open Items List transmitted to the Rancho Seco management, and a memorandum documenting the action.
I would request that you place these memorandums in the Public Document Room for the Docket #50-312, Rancho Seco.
If you have any questions, please call me at (209) 748-2791.
Enclosures:
1.
Memorandum to Ray Ashley 2.