g[
UNITED STATES g
NUCLEAR REGULATORY COMMISSION t
p WASHINGTON, D. C. 20656
\\...../
BOSTON EDISON COMPANY DOCKET NO. 50-293 PILGRIM NUCLEAR POWER STATION AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 97 License No. DPR-35 1.
The Nuclear Regulatory Commission (the Commissioni has found that:
A.
The application for amendment by Boston Edison Company (the licensee) dated April 12, 1985, complies with the standards and reauirements of the Atomic Energy Act of 1954, as amended (the Act) and.the Commission's rules and regulations set forth in 10 CFP Chapter T; B.
The facility will operate in conformity with the application, the orovisions of the Act, and the rules and regulations of the Commission; C.
There is reasonable assurance (1) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D.
The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commiss an's regulations and all applicable reauirements d
have been satisfied.
2.
Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 3.B of Facility Operating License No. DPR-35 is hereby l
amended to read as follows:
Phg
2_
B.
Technical Specifications The Technical Specifications contained in Appendix A, as revised through Amendment No. 97, are hereby incorporated in the license.
The licensee shall operate the facility in accordance with the Technical Specifications.
3.
This license amendment is effective 30 days after the date of issuance.
FOR THE NUCLEAR REGU TC Y COMMISSION 1k
~
~
Joh A. Zwolinski, Director BWR ro.iect Directorate #1 Division of BWR Licensing
Attachment:
Changes to the Technical Specifications Date of Issuance: August 6, 1986 1
4 e
m_
ATTACHMENT TO LICENSE AMENDMENT NO. 97 FACILITY OPERATING LICENSE NO. DPR-35 DOCKET NO. 50-293 Revise the Appendix A Technical Specifications by removing the pages identified below and inserting tiie attached pages. The revised pages are identified by the captioned amendment number and contain marginil lines indicatina the area of change.
REMOVE INSERT 66 66 i
I i
l I
_,.,_,_..,_,.,-.___..____.-_-_.,__,___._-...,__.,,_...m..__._...
~
PNPS p
TABLE 4.2.F g
~
MINIMUM TEST AND CALIBRATION FREQUENCY FOR SURVEILLANCE INSTRUMENTATIg Instrument Channel Calibration Frequency Instrument Check n
y 1)
Reactor Water Level Each Refueling Outage Each Shift g
2)
Reactor Pressure Each Refueling Outage Each Shift 3)
Drywell Pressure Each Refueling Outage
.Each Shift 4)
Drywell Temperature Once/6 Months Each Shift 5)
Suppression Chamber Temperature Once/6 Months Each Shift 6)
Suppression Chamber Water Level Once/6 Months Each Shift 7)
Control Rod Position NA Each Shift 8)
Neutron Monitoring (2)
Each Shift i
9)
Drywell/ Torus Differential Pressure Once/6 Months Each Shift 10)
Drywell Pressure Once/6 Months Each Shift Torus Pressure Once/6 Months 11)
Safety / Relief Valve Each refueling Once each day Position Indicator outage l
(Primary / Secondary) 12)
Safety Valve Position Each refueling Once each day l
Indicator (Primary /
outage Secondary)
.