P l
f[mm]e, UNITED STATE &
L } " /*,p g
e(
NUCLEAR REGULATORY COMMISSION W ASHINGTON. D. C. 20555 g
8.,
4
...../
November 18, 1988 Docket Hu. 50-171 i
Mr. Milliam H. Alden Director Licensing Philadelphia Electric Company Correspondence Control Desk P. O. Box 7520 Philadelphia, Pennsylvania 19101
Dear Mr. Alden:
SUBJECT:
PEACH BOTTOM AT0t11C POWER STATION, UNIT NO. 1 - TEMPORARY EXEMPTION FROM THE SCHEDULAR REQUIREMENTS OF THE PROPERTY INSURANCE RULE EFFECTIVE OCTOBER 4, 1988 (10 CFR 50.54(w)(5)(1))
The Comission has issued the enclosed terporary exemption from the schedular requireroents of the property insurance rule effective October 4, 1988 (10 CFR 50.54(w)(5)(1)) for the Peach Bottom Atomic Power Station, Unit 1.
This part of the rule requires licensees to obtain insurance policies that prioritize insurance proceeds for stabilization and decontamination after an accident and provide for payment of proceeds to an independent trustee who would disburse funds for decontamination and cleanup before any other purpose.
The Commission has proposed a revision of 10 CFR 50.54(w)(5)(1) extending ).
the implerentation schedule for 18 months (53 FR 36338, September 19, 1988 However, since this rulemaking action was not completed by October 4,1988, the Comission is issuing a temporary exemption from the requirements of 10 CFR 50.54(w)(5)(1) until corpletion of the pending rulemaking extending the implerentation date specified in 10 CFR 50.54(w)(5)(1), but not later than April 1, 1989. Upon completion of such rulemaking, the licensee shall comply with the provisions of such rule.
The Comission, pursuant to 10 CFR 50.12(a), hereby grants a temporary exerption from the schedular requirements of 10 CFR 50.54(w)(5)(1). This temporary exemption is valid until April 1,1989 or until such time as action on this rulemaking is completed.
In granting the exerption, the staff has determined that this action is authorized by law and will Nt encangr.r life or property or the common defense and security and is otherwise in the public interest.
[
I l
n 1
k I
Mr. William M. Alden November 18, 1988 A copy of this exemption is being filed with the Office of the Federal Register for publication.
Sincerely, o iginal signed by
)
r Peter B. Erickson, Project Manager Standardization and Non-Power Reactor Project Directorate Division of Reactor Projects - III, IV, Y and Special Projects Office of Nuclear Reactor Regulation
Enclosure:
As stated cc w/ enclosure:
See rext page DISTRIBUTION:
Docket File NRC & Local PDRs PDSNP R/F EHylton PErickson OGC-Rockville GHolahan TMurley/JSniezek DCrutchfield CRossi EJordan BGrimes TBarnhart(4)
ACRS(10)
GPA/PA ARM /L FitB LRubenstein PDSih' PDSNP L
PDSNP OGCL OCKVILE i ADR4 kP E6fiton PErickson:cw Chiller LRubenstein lahan 10/['/88 10/;]/88 1(/jfo8 1//./88 10/d/88 10/jf/88
l Mr. Villier M. Alden Neverter 18, 19S3 A copy of this exemption is being filed with the Office of the Federal Register for publication.
Sincerely, eu 1%
Peter B. Erickson, Droject Manager Standardization and Pon-Power Reactor Project Directortte Division of Reactor Projects - !!!, IV,
)
Y and $pecial Projects Office of Nuclear Reactor Regulation
Enclosure:
As stated cc w/ enclosure:
See next page
Mr. William P. Alden Docket No. 50-171 Philadelphia Electric Company Peach Bottom Atomic Power Station, Unit 1 CC:
Troy B. Conner, Jr., Esq.
Mr. R. A. Heiss, Coordinator 1747 Pennsylvania Avenue, N.W.
Pennsylvania State Clearinghouse Washington, D.C.
20006 Governor's Office of State Planning and Development Philadelphia Eletric Company P. O. Box 1323 ATTN: Mr. D. M. Smith, Vice President Harrisburg, Pennsylvania 17120 Peach Bottom Atomic Power Station Route 1, Box 208 Hr. Thomas H. uerusky, Director Delta, Pennsylvania 17314 Bureau of Radiation Protection Pennsylvania Department of H. Chris Schwemm Environmental Resources Vice President Production P. O. Box 2063 Atlantic Electric Harrisburg, Pennsylvania 17120 P. O. Box 1500 1199 Black Horse Pike Mr. Albert R. Steel, Chaiman Plearantville, New Jersey 08232 Board of Supervisors Peach Bottom Township Resident Inspector R. D. #1 U.S. Nuclear Regulatory Comission Delta, Pennsylvania 17314 Peach Botton Atomic Power Station P. O. Box 399 Mr. Gary Hock Delta, Pennsylvania 17314 P. O. Box 09181 Colurbus, Ohio 43209 l'
Regional Administrator, Region !
U.S. Nuclear Regulatory Comission Delmarva Power and Light Conpany 475 Allendale Road c/o Jack Utta' i
King of Prussia, Pennsylvania 19406 General Manager, Fuel Supply 800 King Street Mr. Bryan W. Gorman P. O. Box 231 Manager - External Affairs Wilmington, Delaware 19899 i
Public Service Electric & Gas Company P. O. Box 236, M28 Mr. Tom Magette Hancocks Bridge, New Jersey 08038 Power Plant Research Program Department of Natural Resources l
B-3 i
Tawes State Office Building l
Annapolis, Maryland 21401 Mr. Ronald Fletcher Department of Environment I
201 West Preston Street l
Baltimore, Meryland 21201 I
l i
-