ML20206L593

From kanterella
Jump to navigation Jump to search
Forwards Safety Insp Rept 50-456/86-32 on 860612-0806.No Violation Noted
ML20206L593
Person / Time
Site: Braidwood Constellation icon.png
Issue date: 08/14/1986
From: Harrison J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Reed C
COMMONWEALTH EDISON CO.
Shared Package
ML20206L599 List:
References
NUDOCS 8608200227
Download: ML20206L593 (2)


See also: IR 05000456/1986032

Text

_ _ - _ - _ - _ _ _

.

,

AUG 141986

Docket No. 50-456

Commonwealth Edison Company

ATTN: Mr. Cordell Reed

Vice President

-

Post Office Box 767

Chicago, IL 60690

Gentlemen:

This refers to the routine safety inspection conducted by Mr. P. D. Kaufman of

this office on June 12-13, 16, 23-27, 30, July 1-3, 28-31, and August 6, 1986,

of activities at Braidwood Station, Unit 1 authorized by NRC Construction Permit

No. CPPR-132 and to the discussion of our findings with Mr. D. Shamblin and

others of your staff at the conclusion of the inspection.

The enclosed copy of our inspection report identifies areas examined during

the inspection. Within these areas, the inspection consisted of a selective

examination of procedures and representative records, observations, and

interviews with personnel.

No violations with NRC requirements were identified during the course of this

inspection.

In accordance with 10 CFR 2.790, of the NRC " Rules of Practice," Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and the

enclosure will be placed in the NRC Public Document Room.

We will gladly discuss any questions you have concerning this inspection.

Sincerely

Original signed by D. H. Danielson (for)

J. J. Harrison, Chief

Engineering Branch

Enclosure:

Inspection Report

No. 50-456/86032(DRS)

See Attached Distribution

8608200227 860814

PDR

ADOCK 0500

6

RIII

RIII

RIII

ediarr$bl

ob1

W

A1H

Kaufma/

.b11U

'

n/kst

Danielson

ipon

c

tu-

th4}fh

spa /%

ejmyL

%

p

i

,

ki

M 6 0/

- -

-

- -

- -

-

-

-

-


- - - - - - - - - -

- - - - - - - - - - -

-

- - - -

_ _ _ _ ._ _

_

.

AUG 141986

Commonwealth Edison Company

2

Distribution

.

cc w/ enclosure:

D. L. Farrar, Director

of Nuclear Licensing

M. Wallace, Project Manager

D. Shamblin, Construction

Superintendent

E. E. Fitzpatrick, Station

Manager

P. L. Barnes, Regulatory

Assurance Supervisor

DCS/RSB (RIDS)

Licensing Fee Management Branch

Resident Inspector, RIII

Braidwood

Resident Inspector, RIII Byron

Phyllis Dunton, Attorney

General's Office, Environmental

Control Division

D. W. Cassel, Jr., Esq.

J. W. McCaffrey, Chief, Public

Utilities Division

H. S. Taylor, Quality Assurance

Division

E. Chan, ELD

J. Moore, ELD

G. Berry, ELD

J. Stevens, NRR

The Honorable Herbert Grossman, ASLB

The Honorable A. Dixon Callihan, ASLB

The Honorable Richard F. Cole, ASLB

.