ML20206L561

From kanterella
Jump to navigation Jump to search
Forwards Insp Rept 50-443/87-02 on 870103-0309 & Notice of Violation.Acks Receipt of 870302 Response to 870203 Notice of Deviation.Encl Violation Relates to Same Subj as Deviation
ML20206L561
Person / Time
Site: Seabrook NextEra Energy icon.png
Issue date: 04/10/1987
From: Wenzinger E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Harrison R
PUBLIC SERVICE CO. OF NEW HAMPSHIRE
Shared Package
ML20206L567 List:
References
NUDOCS 8704170173
Download: ML20206L561 (2)


See also: IR 05000443/1987002

Text

f.

.

.,

I

10 APR 1987

Docket No.

50-443

Public Service Company of New Hampshire

ATTN:

Mr. Robert J. Harrison

President and Chief Executive Officer

P. O. Box 330

Manchester, New Hampshire

03105

Gentlemen:

Subject:

Inspection No. 50-443/87-02

This refers to the routine safety inspection conducted by Mr. A. Cerne and other

inspectors of this office on January 3,1987 - March 9, 1987 of activities author-

ized by NRC Construction Permit No. CPPR-135 and License No. NPF-56 and to the

discussions of our findings held by Mr. Cerne with Mr. Moody and others of your

staff at the conclusion of the inspection.

Areas examined during this inspecticn are described in the NRC Region I Inspection

Report which is enclosed with this letter. Within these areas, the inspection con-

sisted of selective examinations of procedures and representative records, inter-

views with personnel, and observations by the inspectors.

Based on the results of this inspection, it appears that one of your activities

was not conducted in full compliance with NRC requirements, as set forth in the

Notice of Violation, enclosed herewith as Appendix A.

The violation concerns an

inappropriate system configuration, as a result of implementation of the design

control program with respect to the control building makeup air subsystem.

This

violation has been cetegorized by severity level in accordance with the " General

Statement of Policy and Procedure for NRC Enforcement Actions", 10 CFR Part 2,

Appendix C (Enforcement Policy 1986).

You are required to respond to this letter

and in preparing your response, you should follow the instructions in Appendix A.

This also refers to your letter dated March 2, 1987 in response to our letter dated

February 3,1987, transmitting a Notice of Deviation for your further review and

action.

Thank you for informing us of the corrective and preventive actions docu-

mented in your letter. While these actions have not yet been fully examined as

part of the inspection process for previously identified items, we note that the

violation enclosed herewith relates to the same subject as the deviation.

As dis-

cussed in this inspection report, your planned corrective action in response to

the deviation may require further review to determine whether the identification

of the violation has any impact on the need for further corrective measures.

If

the need for further response to the deviation arises, this should be accomplished

in your response to the enclosed violation.

Because of the relationship of these

two findings, our followup inspection will evaluate the completeness and adequacy

of your common corrective actions in this area.

1

I

8704170173 870410

[

g

PDR

ADOCK 05000443

g

Q

PDR

l

.

.

.

.

Public Service Company of New Hampshire 2

10 APR 1987

The responses directed by this letter and the accompanying Notice are not subject

to the clearance procedures of the Office of Management and Budget as required by

the Paperwork Reduction Act of 1980, PL 96-511.

Your cooperation with us in this matter is appreciated.

Sincerely,

Originni signed B :

ih lh W\\

0

-

b.EdwardC.Wenzinger, Chief

N

Projects Branch No.3

Division of Reactor Projects

Enclosures:

1.

Appendix A, Notice of Violation

2.

NRC Region I Inspection Report No.

50-443/87-02

cc w/encls:

Seabrook Hearing Service List

Ted. C. Feigenbaum, Vice President of Engineering and Quality Programs

William B. Derrickson, Senior Vice President

Warren J. Hall, Regulatory Services Manager

Donald E. Moody, Station Manager

Public Document Room (PDR)

Local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

NRC Resident Inspector

State of New Hampshire

bec w/encls:

Region I Docket Room (with concurrences)

Management Assistant, DRMA (w/o enc 1)

DRP Section Chief

Robert J. Bores, DRSS

i

l

l

hWendn e

Cerne/meo

Elsasser

y

$n

%i

0FFICIAL RECORD COPY

5Ed

k