ML20206K586
| ML20206K586 | |
| Person / Time | |
|---|---|
| Site: | Cooper |
| Issue date: | 11/23/1988 |
| From: | Callan L NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Trevors G NEBRASKA PUBLIC POWER DISTRICT |
| Shared Package | |
| ML20206K589 | List: |
| References | |
| NUDOCS 8811290459 | |
| Download: ML20206K586 (2) | |
See also: IR 05000298/1988029
Text
._,
g
--
.
'
.
.
.
In Reply' Refer To:
Docket: '50-298/88-29
' Nebraska Public Power District
ATTN: George A. Trevors
Division Manager - Nuclear Support
P.O. Box 499
Columbt 1, NE 68601
Gentlemen:
'
This refers to the inspection conducted by Mr. Nemen M. Terc of this office.and
other accompanyina personnel during the pericd )ctober 17-20, 1988, of
activities authorized by NRC Operating License DPR-46, for Cooper Nuclear
Station and to the discussion of our findings with Mr. Hugh Parris,
Vice President - Production and members of his staff at the conclusion of the
inspection.
Areas examined during the inspection included the implementation of the
emergency pian and procedures during the annual emergency response exercise.
Within these areas, the inspection consisted of selective examination of
procedures and representative records, interviews with personnel and
observations by the NRC inspector.
Within the scope of this inspection no violations or deviations were
identified.
The enclosed raport identifies 11 deficiencies in your emergency preparedness
program, as discussed in 10 CFR 50.47(b)(14) and Appendix E.F.5.
You are
required to provide this office with a description of your corrective actions
i
and a schedule for imnlementation within 30 days after receipt of this letter.
We are concerned that the number and nature of the deficiencies identified in
this inspection are an indication of a decrease in effectiveness of your
emergency preparedness program. As discussed in the telephone conversation on
Novemoer 14, 1988, between your Mr. G. /.. Trevore and Mr. R. L. Bangart of
this office, a meeting has been schduled at 9:00 a.m. on December 13, 1988, in
the Region IV office to discuss these matters.
,
t
We have also examined actions you have taken with regard to previously
identified inspection findings.
The status of these icems is identified in
i
paragraph 2 of the enclosed report.
[
f-
'
I
. R V:SjfS:RPB
SEP M B
C:RPBh
C: P E
0:
dt'
,
t/cz
RJEvFf9tt
BMurray
LC stable
LJCaTla
j
('/tv/88
a
u /(4/88
e /c /88
li/ g/88
H/23/88
i
!
l
8811290439 g3gg;3
'I
'
fR
ADOCK 05000298
,&
>
1
_.
.
__ _ __.. _ _ _ _ _ . _ _ _ _ _ _ . , _ _ _ _ _ _ _ _ _ _ _ _ _ , _ . _ _ _
.
.
.
.
.
.
Nebraska Public Power 01 strict
-2-
Should you have any questions concerning this inspection, we will be pleased to
discuss thea with you.
.
Sincerely,
Orhinal Signed 11y
A. B. Deach
. L. J. Callan, Director
Division of Reactor Projects
Enclosure:
Appendix - NRC Inspection Report
50-298/88-29'
cc w/ enclosure:
Cnoper Nuclear Station
ATTN: Guy Horn, Division Manager
of Nuclear Operations
P.O. Box 98
Brownville, Nebraska 68321
Program Manager
FEMA Region 7
911 Walnut Stree', Room 200
64106
Director Nebraska Civil Defense Agency
1300 Military Road
Lincoln, Nebraska 68508
Kansas Radiation Control Program Director
Nebraska Radiation Control Program Director
bec to DMB (IE-06)
bec distrib, by RIV:
- RRI
- R. D. Martin, RA
- Section Chief (ORP/C)
Lisa Shea, RM/ALF
- RPB-ORSS
- MIS System
"RIV File
"Project Engineer, DRP/C
- RSTS Operator
- W. Long, NRR Project Manager
- 0RS
- DRP
C. Hackney
B. Murray
J. Everett
R. Bangart
R. Hall
- w/766
.-
-
.
.
_ - .
_