ML20206K303

From kanterella
Jump to navigation Jump to search
Forwards Listed Documents,Including Seven Monthly Business Ltrs from DOE & Battelle Northwest,Supporting Charges on Invoice F0320 for Part 55 Svcs from June-Dec 1985,per 861117 Request.Response to Forthcoming.W/O Ref Encls
ML20206K303
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 04/07/1987
From: Holloway C
NRC OFFICE OF RESOURCE MANAGEMENT (ORM)
To: Eric Simpson
FLORIDA POWER CORP.
Shared Package
ML20206K306 List:
References
NUDOCS 8704160321
Download: ML20206K303 (2)


Text

_.

APR 7 E07 Docket No. 50-302 Florida Power Corporation ATTN: Mr. E. C. Simpson Director, Nuclear Operations Engineering and Licensing P.O. Box 14042, M.A.C. H-2 St. Petersburg, FL 33733 Gentlemen:

In response to your letter dated November 17, 1986, enclosed are the following documents which support the cost of $35,853 on Invoice No.

F0320 for Part 55 services from June 1985 through December 1985:

1.

Seven monthly business letters from DOE and Battelle Northwest and Region II's April 1,1986 fee report for consultant's review of medical reports for contractual cost totaling $17,065.

2.

Computer run showing breakdown of 354.5 professional staff hours by weeks, employees, activity codes and subjects.

We hope that this information satisfies your needs.

If you feel that any invoiced amount is not correct based on the information provided, you should give us the basis for your position, in writing, and we will respond to your request as soon as possible.

Before the professional staff hours and contractual costs are provided to us for billing, the hours and costs are verified and audited in accordance with the enclosed procedures that are used by the Office of Nuclear Reactor Regulation. The detailed information that you have requested is not routinely provided to our office. Consequently, each request you send requires that we secure the data from other offices.

You indicated that the contractor cost " appears disproportionately high."

It is our understanding that during this and other review periods, contractors were used for much of the examination-related work and that there were many examinations.

8704160321 870407 PDR ADOCK 05000302 P

PDR

Q l

Florida Power Corporation 2

APR 7 1967 A response to your November 7,1986, letter will be sent to you as soon as possible.

Sincerely, p e q en.W.&

C. James Holloway, Jr., Chief License Fee Management Branch Division of Accounting and Finance Office of Resource Management

Enclosures:

1.

DOE and Battelle letters (7) and RII Report of 4/1/86 2.

Computer run for 354.5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br /> 3.

NRR Procedures for Verifying and Auditing Data CERTIFIED MAIL RETURN RECEIPT REQUESTED DISTRIBUTION w/o encls:

PDR LPDR JMunro, RII JColeman, RII

, Reg ~DocketlFile7w/ orig.

~'of'FPL's"11/17/86 ltr LFMB Amds. A/M File w/cy, ltr -ed/e~g,

  • of 11/17/86 RMDiggs LFMB R/F RM/A R/F DW/RMD/ Florida

/

OFFICE :RM F

RM ALF

_ _ _ _ _ _ _ _ _ : _ g/A

,9 =_
__

SURNAME :RMDiggs:jp :CJ oway :

DATE :4/ 7' /87

4/ 4 /87

/