ML20206J429
| ML20206J429 | |
| Person / Time | |
|---|---|
| Site: | Wolf Creek |
| Issue date: | 11/21/1988 |
| From: | WOLF CREEK NUCLEAR OPERATING CORP. |
| To: | |
| Shared Package | |
| ML20206J422 | List: |
| References | |
| NUDOCS 8811280187 | |
| Download: ML20206J429 (2) | |
Text
Attacthnent III to ET 88-0100
~
Pago 1 of 1
- Neuember 21, 1988 ADMINISTRATIVE CONTROLS 6.4 TRAINING 6.4.1 A retraining and replacement training program for the unit staff shall be maintained under the direction of the Training Manager and shall meet or exceed the requirements and recossendations of Section 5 of ANSI /ANS 3.1-1978 and Appendix 'A' of 10 CFR Part 55 and the supplemental requirements spect-fied in Section A and C of Enclosure 1 of the March 28, 1980 NRC letter to all licensees, and shall include familiarization with relevant industry operational experience identified by the ISEG,or another plant group.
6.5 REVIEW AN0' AUDIT
.6.5.1 PLANT SAFETY REVIEW C0mlTTEE (PSRC)
FUNCTION 6.5.1.1 The PSRC shall function to advise the Plant Manager on all matters related to nuclear safety.
COVPOSITION_
e c ' > u" n,W UperaTionsem m di%iiFi
(-
Member:
Manager of Technical Support Member:
Manager of Maintenance and Modifications Member:
Manager Instrumentation and Control Member:
Reactor Engineering Supervisor Member:
Health Physicist Member:
Chemist l
Member:
Results Engineering Supervisor Chairman:
Manager of Plant Support ALTERNATES 6.5.1.3 All alternate members shall be appointed in writing by the PSRC Chairman to serve on a temporary basis; however, no more than two alternates shall participate as voting perbers in PSRC activities at any one time.
KOLF CREft - UNIT 1 6.'
Amend ent No, 20
{bh
$ Y bc Eb b l
p r r.t
\\*
ADMINISTRATIVE CONTROLS HEETING FREQUENCY 6.5.1.4 The PSRC shall meet at least once per calendar month and as convened by the PSRC Chairman or his designated alternate.
QUORUM
- 6. 5.1. 5 The quorum of the PSR'C necessary for the performance of the PSRC responsibility and authorit/ provisions of these Technical Specifications shall consist of the Chairman or his designated alternate and four memoers including alternates.
RESPONSIBILITIES
- 6. 5.1. 6 The PSRC shall be responsible for:
a.
Review of: (1) all procedures required by Specification 6.8 and changes thereto, (2) all programs required by Specification 6.0 and changes thereto, and (3) any other proposed procedures or changes thereto as determined by the Plant Manager to affect nuclear safety; I
b.
Review qf all proposed changes, tests and experiment: which may a
involve *an unre stewed safety question as defined til Sec' tion 50.59, 10 CFR; c.
Review of all proposed changes to Technical Specifications or the s
Operating License; d.
Review of all safety evaluations performed under the provision of Section 50.59(a)(1),10 CFR, for changes, tests and experiments; Investigation of all violations of the Technical Specifications e.
including the preparation and forwarding of reports covering evalua-tion and recornendations to prevent recurrence to the Directo,r, Nuclear Operations, and to the Nucleer Safety Review Committee (NSRC);
f.
Review of all REPORTABLE EVENTS; g.
Review of reports of operating abnormalities, deviations from expected performance of plant equipment and of unanticipated deficienc'es in the design or operation of structures, systems or components that affect auclear safety; h.
Performac.ce of special reviews, investigations or Lnalyses and reports thereon as requested by the Chairman, SSRC; i.
Review of the plant Security Plan and implementing procedures and shall submit recemmended changes to the NSRC; j.
Resiew of the Energency Plan and i plementing procedures and shall sunu t recomtended changes to the N5RC, WOLF CREES - UNIT 1 6-8 1