DUKE POWER GOMPANY P.O. BOK G3189 CHARLOTTE, N.C. 28942 HALB. TUCKER N2NM
- m.,em.
m (704) amaan wassam, monte l
June 23, 1986 Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, D. C.
20555 Attention:
Mr. B. J. Youngblood, Project Director PWR Project Directorate No. 4 Re: Catawba Nuclear Station, Units 1 and 2 Docket Nos. 50-413 and 50-414
Dear Mr. Denton:
Enclosed are six copies of Revision 3 (Unit 2) to the Catawba Nuclear Station Pump and Valve Inservice Testing Program. These should be incorporated into the existing Pt..p and Valve Inservice Testing Manual removing any earlier revision pages of the program.
j Very truly yours, t
Hal B. Tucker RWO: sib Enclosures cc:
(w/o enclosures)
Dr. J. Nelson Grace, Regional Administrator U. S. Nuclear Regulatory Cormission Region II 101 Marietta Street, NW, Suite 2900 Atlanta, Georgia 30323 NRC Resident Inspector Catawba Nuclear Station 7
0 8606270166 060623 Ih PDR ADOCK 05000413 p
PDR L
l t
y i
I l
l l
CATAWBA NUCLEAR STATION l
PUMP AND VALVE INSERVICE TESTING PROGRAM UNIT 2 - REVISION 3 For valves 2CA149, 2CA150, 2CA151 and 2CA152 add "A04 to the "RELF RQST" column and "CS" to the " TEST ALTN" column on the "Q" and "FS" rows. Add Relief Request #A04 to stroke time these valves to their fail safe positions during cold shutdown.
O O
.e s
RELIEF REQUEST #A04 VALVE:
2CA149, 2CA150, 2CA151, 2CA152 CATEGORY: B CLASS:
2 4
FUNCTION: Allow the CF pumps to pump water to the steam generator through the CA nozzles, minimizing preheater vibration.
i i
i TEST REQUIREMENTS: Exercise valve to the fail safe position required to fulfill its function and stroke time every three months.
BASIS FOR RELIEF: The Westinghouse D-5 steam generator design requires j
(
these valves to be used for main feedwater flow. Closure of these valves would isolate this flow, possibly resulting j
in severe transients in thel steam generators.
1 ALTERNATE TESTING: Valves will be exercised to the fail safe position required to fulfill their function and stroke timed during cold shutdown.
i B