ML20206H293

From kanterella
Jump to navigation Jump to search
Amend 130 to License DPR-16,allowing Removal of High Pressure Scram Function When Reactor Head Removed or Unbolted to Enable Installation of New Analog Pressure Sensors During 12R Refueling Outage
ML20206H293
Person / Time
Site: Oyster Creek
Issue date: 11/18/1988
From: Stolz J
Office of Nuclear Reactor Regulation
To:
GPU Nuclear Corp, Jersey Central Power & Light Co
Shared Package
ML20206H298 List:
References
DPR-16-A-130 NUDOCS 8811230159
Download: ML20206H293 (5)


Text

_

E

/

e,,

UNITED STATES 8

NUCLEAR REGULATORY COMMISSION

  • E wAsm NO T ON, D. C. 20$H t

...+

7 GPU NUCLEAR CORPORATION O

JERSEY CENTRAL POWER & LIGHT COMPANY DOCKET N0. 50-219 0YSTER CREEK NUCLEAR GENERATIll3 STATION AMENDMENT TO PROVISIONAL OPERATING LICENSE Amendment No.130 License No. OPR-16 1.

The Nuclear Regulatory Comission (the Comission) has found that:

A.

The application for anendment by GPU Nuclear Corporation, et al.,

[

(thelicensee),datedSeptember 28, 1988, complies with the l

standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and tne Comission's rules and regulations set' forth in 10 CFR Chapter I; j

B.

The facility will operate in conformity with the epplication, the provisions of the Act, and the rules and regulations of the Commission; C.

There is reasonable assurance (i) that the activities authorized i

by this amendment can be conducted without endangering the f.ealth and safety of the public, ard (ii) that such activities will be l

conducted in compliance with the Comission's regulations; D.

The issuance of this amendtrent will not be inimical to the comon defense and security or to the health and safety of the pubitc; and i

E.

The issuance of this amendment is in accordance with 10 CFR Part 51 i

of the Comission's regulations and all uplicable requirements have i

been satisfied.

i t

t l

r

$$h 23!S$$ $$$bNP P

i l

2 2.

Accoroingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C.(2) of Provisional Operating License No. DPR-16 is hereby amended to read as follows:

(2) Technical Specifications The Technical Specifications contained in Appendices A and B, as revised through Amendment No.130, are hereby incorporated in the license. GPU Nuclear Corporation shall operate the facility in accordance with the Technical Specifications.

3.

This license amendment is effective as of the date of issuance, to be implemented within 30 days of issuance.

F R THE HUCLEAR REG LATORY C0! MISSION

/.

/

/f\\

John. Stolz, Directqr Prpject Directorate 1-4 Division of Reactor Projects 1/11 Office of Nuclear Reactor Regulation Attachrent:

Changes to the Technical Specifications Date of Issuance:

November 18, 1988

ATTACHMENT TO LICENSE A!!ENOMENT NO.130 PROVISIONAL OPERATING LICENSE NO. DPR-16 DOCKET NO. 50-219 Replace the following pages of the Appendix A Technical Specifications with the enclosed pages as indicatea. The revised pages are identified by ar,endment number and contain vertical lines indicating the areas of change.

Remove Insert Page 3.1-8 Page 3.1-8 Page 3.1-19 Page 3.1-19 4

4

l TABLE 3.1.1 PROTECTIVE INSTRUENTATION REQUIREENTS

=

)

Reactor Modes Min. No. of Min. No. of Q

in which Function Operable or Instrument Must Ba Operable Operating Channels Per l

^

[ tripped]

Operable Action Function Trip Setting Shutdown Refuel Sta rti.p Run Trip Systems Trip Systems Required

  • A.

Scram 4

1. Manual Scram X

X X

X 2

1 Insert j

contrni rods X(s)

X(11)

X 2

2 l

2. High Reactor, Pressure 1
3. High Drywell 3.5 psig X(u)

X(u)

X 2

2 Pressure w

~

l t

~

I

4. Low Reactor X

X X

2 2

Water Level l

S. a. High Water 29 gal.

X(a)

X(z)

X(z) 2 2

Level in Scram Discharge Volume North $1de

.]

7,-

b. High Water 29 gal.

X(a)

X(z)

X(z) 2 2

R Level in Scram Discharge Volume South Side

6. Low Condenser 23" hg.

X(b)

X(b)

X 2

2 Vacuum CD o'

7. High Radiation 10 x normal X(s)

X X

2 2

in Main Steam background Line Tunnel YA h

l

~.

~

5g TABLE 3.1.1 (CONTD) o O

  • gg.

These functions are not re?Jf red to be operable when secondary containment is not required to be maintained or when the concitions of Section 3.5.b.1.a. b, c, and d are met, and reactor water level is closely monitored and logged hourly. The Standby Gas Treatment System will be manually initiated if reactor water level drops to the low level trip set point.

hh.

The high flow trip function for "B" Isolation Condenser is bypassed upon initiation of the alternate shutdown panel. This prevents a spurious trip of the isolation condenser in the event of fire induced circuit damage.

11.

Instrument shall be operable during main condanser air ejector operation except that a channel may be taken out-of-service for the purpose of a check, calibration, test, or maintenance without declaring it to be inoperable.

jj. With no channel OPERABLE, main condenser offgas may be released to the environment for as long as 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> provided the stack radioactive noble gas monitor is OPERABLE. Otherwise, be in at least SHUTDOWN CONDITION within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

kk.

Reserved.

11.

This function not required to be operable with the reactor vessel head removed or anbolted.

w

~

~

b 9

't O

V

.N x

This note is applicable only during the Cycle 10M outage.

co