Discusses Telcon Arrangements Made for Evaluation of Requalification Program.Evaluation Visit Scheduled for Wk of 870720 W/Written Exam Administered in Preceeding Wk.Requests Ref Matl Listed in Encl 1 for Examiner to Prepare for Visit
ML20206F531
Person / Time
Site: Oconee  Duke energy icon.png
Issue date: 03/30/1987
From: Peebles T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Tucker H
DUKE POWER CO.
References
NUDOCS 8704140281
Download: ML20206F531 (6)


Text

s e

, , .J March 30, 1987

~

1 l

l Duke Power Company

' ATTN: Mr. H. B. . Tucker, Vice President Nuclear Production Department 422_ South Church Street Charlotte, NC 28242 Gentlemen:

SUBJECT:

REQUALIFICATION PROGRAM EVALUATION

'In a telephone conversation between . Mr. Paul Stovall, Operator Training

- Supervisor, and Mr. Sandy Lawyer, Operator Licensing Section, arrangements were made for. an evaluation of the requalification program at the Oconee Nuclear Station. .The evaluation visit is scheduled for the week of July 20, 1987, with the written-exam being administered the preceeding week.

For this visit, the' NRC examiner will administer NRC. prepared written, oral, and simulator examinations. When the NRC examiner arrives at the site, he will meet with the appropriate facility personnel to review the schedule for these examinations. For the examiner to adequately prepare for this visit, it will be necessary for the facility to furnish the approved reference material listed in Enclosure 1, " Reference Material Requirements for Requalification Program Evaluations," by May 20, 1987. . Mr. Stovall has been advised of our referenced material requirements and where they are to be sent.

This request for information was approved by the Office of Management and Budget under- Clearance Number 3150-0101, which expires on May 31, 1989.

' Comments on burden and duplication nay be directed to the Office of Management and Budget, Reports Management, Room 3208, New Executive Office Bulding, Washington, DC 20503.

The facility management is responsible for providing adequate space and facilities in order to properly conduct the written examinations.

Enclosure 2, " Administration of Operator Licensing Written Examinations,"

describes our requirements for conducting these examinations. Mr. Stovall

. has also been informed of these requirements.

r 8704140281 87033029 DR ADOCK 050

ez ENCLOSURE 1 REFERENCE MATERIAL REQUIREMENTS FOR REQUALIFICATION PROGRAM EXAMINATIONS 1.- Existing learning objectives and lesson plans (including training manuals, plant orientation manual, system descriptions, reactor theory, thermo-dynamics,etc.)

Training materials should include all substantive written material used for preparing candidates for initial R0 and SR0 licensing. The written material should be inclusive of learning objectives and the details presented during lecture, rather than outlines. Training materials should be identified by plant and unit, bound, and indexed. Failure to provide complete properly bound and indexed plant reference material will result in canceling and rescheduling of the examinations. Training materials which include the following should be provided:

a. System descriptions including descriptions of all operationally relevant flow paths, components, controls and instrumentation. System training material should draw parallels to the actual procedures used for operating the applicable system.
b. Complete and. operationally useful de:criptions of all safety-systeil interactions and, where available, BOP system interactions under emergency and abnormal conditions,. including consequences of anticipated operator error, maintenance error, and equipment failure.
c. Training material used to clarify and strengthen understanding of emergency operated procedures.
d. Comprehensive theorylaterial that includes fundamentals in the area of theory of reactor operation, thermodynamics, heat transfer and fluid flow, as well as specific application to actual in-plant components.

For example, mechanical theory material on pumps should include pump theory as well as descriptions of how these principles actua?ly apply to major plant pumps and the systems in which they are installed (i.e.,

Reactor Coolant pumps, all ECCS pumps, Recirculation pumps, feedwater pumps and Emergency Feedwater pumps). Reactor Theory material should include descriptions that draw explicit ties between the fundamentals and the actual operating limits followed in the plant (i.e., reactor theory material should contain explanations how principles related to the actual curves used by operators to verify shutdown margin or calculate an ECP).

2. Procedure Index (alphabetical by subject)

Enclosure 1 2

3. All administrative procedures (as applicable to reactor operation or safety)
4. . All integrated plant procedures (normal or general ope' rating procedures)
5. Emergency (emergency instructions, abnormal or special procedures) procedures
6. Standing orders (important orders that are safety-related and may supersede

-the regular procedures)

7. Fuel-handlingandcore-loadingprocedures,(initialcore-loadingprocedure, whenappropriate)
8. Annunciator procedures (alarm procedures, including set points)
9. Radiation protection manual (radiation control manual or procedures)
10. Emergency plan implementing procedures
11. Technical Specifications
12. System operating procedures
13. Piping and instrumentation diagrams, electrical single-line diagrams, or flow diagrams
14. Technical Data Book, and/or plant curve information as used by operators and facility precautions, limitations, and set points (PLS) for the facility
15. Questions and answers that licensee has prepared (voluntary by licensee)
16. The following on the plant reference simulator
a. List of all readily available initialization points.
b. List of all preset malfunctions with a clear identification number.

The list should include cause and effect information. Specifically, for each malfunction a concise description of the expected result, or range of results, that will occur upon implementation should be provided. Additionally, an indication of which annunciators are to be initially expected should be given.

c. A description of simulator failure capabilities for valves, breakers, indicators and alarms.

o

-Enclosure 1 3

d. Where the capability exists, an explanation of the ability to vary the severity of a particular malfunction should be provided, i.e., ability to vary the size of a given LOCA or steam leak, or the ability to cause a slow failure of a component such as a feed pump, turbine generator or major valve (e.g., drif ting shut of a main feedwater control valve).
e. An indication of modeling conditions / problems that may impact the examination.
f. Identification of significant differences between the simulator and the control room,
g. Copies of facility generated scenarios that expose the candidates to situations of degraded pressure control (PWR), degraded heat removal capability (PWR and BWR) and containment challenges (BWR) may be provided (voluntary by licensee).
h. Simulator instructors manual (voluntary by licensee)
1. Description of the scenarios used for the training class (voluntary by licensee)
17. Additional material required by the examiners to develop examinations that meet the requirements of these standards and the regulations.

The above reference material should be approved, final issues and should be so marked. If a plant has not finalized some of the material, the chief examiner shall verify with the facility that the most complete, up-to-date material is available and that agreement has been reached with the licensee for limiting changes before the administration of the examination. All procedures and reference material should be bound with appropriate indexes or tables of contents so that they can be used efficiently.

- ,
e ENCLOSURE 2 ADMINISTRATION OF OPERATOR LICENSING WRITTEN EXAMINATIONS

'1. A single room shall be provided for completing the written examination. The location of this' room and supporting restroom facilities shall be such as to prevent contact with all other facility and/or contractor personnel during the duration of the written examination. If necessary, the facility should make arrangements for- the use of a suitable room at a local school, motel, or other building. Obtaining this room is the responsbility of the licensee.

2. Minimum spacing is required to ensure examination integrity as determined by the chief examiner. Minimum spacing should be one candidate per table, with a 3-ft. space between tables.. No wall charts, models, and/or other training materials shall be present in the examination room.
3. Suitable arrangements shall be made by the facility if the candidates are to have lunch, coffee, or other refreshments. These arrangements shall comply with Item 1 above. These arrangements shall be reviewed by the examiner and/or proctor.
4. The facility staff shall be provided a copy of the written examination and answer key after the last candidate has completed and handed in his written examination. The facility staff shall then have five working days to provide formal written comments with supporting documentation on the examination and answer key to the chief examiner or to the regional office section chief.
5. The licensee shall provide pads of 8-1/2 by 11 inch lined paper in unopened packages for each candidate's use in completing the examination. The exainer shall distribute these pads to the candidates. All reference material needed to complete the examination shall be furnished by the examiner. Candidates can bring pens, pencils, calculators, or slide rules into- the examination room, and no other equipment of reference material shall be allowed.
6. Only black ink or dark pencils should be used for writing answers to questions.

I

} ,

March 30, 1987 Duke Power Company 2-Thank you for your consideration in this matter, If you have any questions on the evaluation process, please contact Mr. John Munro, 404/331-5544.

Sincerely, (ORIGINAL SIGNED BY V. L. BROWNLLE, FOR)

Thomas A. Peebles, Acting Chief Reactor Projects Branch 2 Division of Reactor Projects

Enclosures:

1. Reference Material Requirements
2. " Administration of Operator Licensing Written Examinations" cc w/encls:

R. Bugert, Training Supervisor M. S. - Tuckman, Plant Manager bec w/encls:

Senior Resident Inspector M cument Control Desk State of South Carolina RJI RI RII RII RTi' F&) GtAY PRShaw LLa er nro CAJulian rlenjak 3//2 /87 3/26/87 3/Z4/87 3/p /87 , /g r -

v ww. ,