a OPU Nuclear Corporation gg gf Post Ofhce Box 388 l
Route 9 South Forked River, New Jersey 087310388 609 971 4000 Wnter's Direct Dial Number:
April 1, 1987 Dr. Thomas E. Murley, Administrator Region I U.S. Nuclear Regulatory Commission 631 Park Avenue King of Prussia, PA 19406
Dear Dr. Murley:
Subject:
Oyster Creek Nuclear Generating Station Docket No. 50-219 Special Report 87-01 Enclosed is Special Report No. 87-01 which is submitted in accordance with Technical Specification 3.12.C.3.
If any questions or comments should arise, please contact Mr. George Busch, Oyster Creek Licensing Engineer at (609)971-4909.
ry truly you j
eter B. Fie,.r )'r&
/
ice Preside and frector Oyster Creek PDF/GB/at (0666A)
Enclosure cc: NRC Resident Inspector Oyster Creek Nuclear Generating Station Forked River, NJ 08731 0704130600 070401 PDR ADOCK 05000219 8
ppR l
GPU Nuclear Corporation is a subsidiary of the General Pubhc Utihties Corporation
'\\
l Y
3 OYSTER CREEK NUCLEAR GENERATING STATION ig
[
Fcrked River, New J;rs:y 08731 i
Special Report 87-01 r
Report Date l
l l
(
Occurrence Date March 2,1987 Identification of Occurrence An inoperable Fire Spuppression Water Deluge System was not restored to ~
functional status within 14 days from the time of discovery.
This report is submitted pursuant to Section 3.12.c.3 of the Oyster Creek Technical Specifications.
Description of Occurrence On February 16,1987, at 10:15 AM Deluge System #1, which protects the main transformer area, was isolated and. declared inoperable due to frozen piping.
The heating system for the 4160 volt switchgear area was removed from service to accomplish maintenance on the system. As a result of subsequent lower l
outside temperatures, operators noticed the formation of ice on deluge system piping and components and the system was determined inoperable.
Due to the long lead time for procurement of replacements for damaged j
components, the deluge system was not restored to functional status within the 14 days specified in the Technical Specification.
Actions Taken In accordance with Technical Specification Section 3.12.C.2 within I hour of system isolation an hourly fire watch patrol was established.
Deluge System
- 1 was restored to operable status on March 27, 1987.