ML20206D938
| ML20206D938 | |
| Person / Time | |
|---|---|
| Site: | Fermi |
| Issue date: | 11/09/1988 |
| From: | Greger L NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Sylvia B DETROIT EDISON CO. |
| Shared Package | |
| ML20206D941 | List: |
| References | |
| NUDOCS 8811170331 | |
| Download: ML20206D938 (2) | |
See also: IR 05000341/1988028
Text
_ _ _ _ _ _ _ _ _ _ _ _
.
-
,
n
-- ...---
i,
n , p g
ng
~
O m a1U M JD
avun
ve
v
,
,
NOV 0 91988
Docket No. 50-341
The Detroit Edison Company
ATTN:
8. Ralph Sylvia
Senior Vice President
Nuclear Operations
6400 North Dixie Highway
Newport, MI 48166
,
Gentlemen:
This refers to the safeguards inspection conducted by Messrs. G. Pirtle and
D. Funk of this office on October 3-14. 1988, of activities at the Enrico
Fermi Atomic Pover Plant, Unit 2 authorized by NRC Operating License
No. NPF-43, and to the discussion of our findings with Mr. Catola and other
-
members of your staff on October 7, 1988, at the conclusion of the onsite
inspection.
The enclosed copy of our irsoection report identifies areas examined during
the inspection. Within these areas, the inspection consisted of a selective
examination of procedures and representative records, observations, and
interviews with personnel.
During this inspection, certain of your activities appeared to be in violation
of NRC requirements, as described in the enclosed Notice of Violation.
The
!
inspection showed that actions had been taken to correct the identified
violation and to prevent recurrence. Our understanding of your corrective
actions is described in Caragraph 5.a of the enclosed inspection report.
Consequently, no reply to the violation is required and we have no further
'
questions regarding this matter at this time. Our understanding of interim
security measures implemented because of a potential vulnerability with
special search equipment are described in Section 5.b of the Report Details.
Please advise us in writing, within 30 days after receipt of this letter,
if our understanding is incorrect.
'
Areas examined during this inspection concern a subject matter which is
exempt from disclosure according to Part 73, Title 10, Code of Federal
Regulatic,ns, Section 73.21(c)(2).
This information must be handled and
L
protected in accordance with the provisions of 10 CFR 73.21. Consequently,
i
the enclosure to this letter and our report of this inspection will not be
placed in the NRC Public Document Room.
Encl 03ure Contains
T-
$su tE03$ ggggg?gs
SAFEGUARDS INFORMATION I l
ps
co
poc
Upon Separation This
o
Page is Decontrolled
m
-.n,,,nnn
. . . r. n n . s ,
n i
-
en _uunhUO livi veuvir\\ l ;UIN
-
,
.
SAxGJADS E01VATON
The Detroit Edison Company-
2
NOV 0 9 Wed
We wil'1 gladly discuss any questions you huve concerning this inspection.
Sincerely,
LLft---
L. Robert Greger, Chief
and Radiological Protection Branch
Enclosures:
1.
2.
Inspection Report
No. 50-341/88028(DRSS)
(UNCLASSIFIED SAFEGUARDS INFORMATION)
cc w/ enclosures:
Patricia Anthony, Licensing
P. A. Marquardt, Corporate
Legal Department
NRR/DRIS/SGB
NRR/ORIS/S1B
NRR/0LPQ/PEB
>
cc w/ enclosures, w/o
UNCLASSIFIED SAFEGUARDS
INFORMATION:
OCD/DCB(RIDS)
Licensing Fee Managenient Branch
Resident Inspector, RIII
Ronald Calle
'
Public Service Commission
Harry H. Voight, Esq.
.
l
Michigan Department of
Public Health
Monroe County Office of
Civil Preparedness
Enclosure Contains
SAFEGUARDS INFORMATION
,
Upon Separation This
P--+ is Decontrolled
R f,!!,
,
RIII
(.:8
"E
Pi rtle/.nb
d
oo
6
er
w ,< . .
,wher
,
SAEG JAUS
U0lV A" 0 \\