ML20206D938

From kanterella
Jump to navigation Jump to search
Forwards Safeguards Insp Rept 50-341/88-28 on 881003-14 & Notice of Violation.Notice Withheld (Ref 10CFR73.21)
ML20206D938
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 11/09/1988
From: Greger L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Sylvia B
DETROIT EDISON CO.
Shared Package
ML20206D941 List:
References
NUDOCS 8811170331
Download: ML20206D938 (2)


See also: IR 05000341/1988028

Text

_ _ _ _ _ _ _ _ _ _ _ _

.

- , n -- ...--- i, n , p g ng ~

O m a1U M JD avun ve

v , ,

NOV 0 91988

Docket No. 50-341

The Detroit Edison Company

ATTN: 8. Ralph Sylvia

Senior Vice President

Nuclear Operations

6400 North Dixie Highway

Newport, MI 48166 ,

Gentlemen:

This refers to the safeguards inspection conducted by Messrs. G. Pirtle and

D. Funk of this office on October 3-14. 1988, of activities at the Enrico

Fermi Atomic Pover Plant, Unit 2 authorized by NRC Operating License

No. NPF-43, and to the discussion of our findings with Mr. Catola and other -

members of your staff on October 7, 1988, at the conclusion of the onsite

inspection.

The enclosed copy of our irsoection report identifies areas examined during

the inspection. Within these areas, the inspection consisted of a selective

examination of procedures and representative records, observations, and

interviews with personnel.

During this inspection, certain of your activities appeared to be in violation

of NRC requirements, as described in the enclosed Notice of Violation. The

!

inspection showed that actions had been taken to correct the identified

violation and to prevent recurrence. Our understanding of your corrective

actions is described in Caragraph 5.a of the enclosed inspection report.

Consequently, no reply to the violation is required and we have no further  ;

questions regarding this matter at this time. Our understanding of interim

'

security measures implemented because of a potential vulnerability with

special search equipment are described in Section 5.b of the Report Details.

Please advise us in writing, within 30 days after receipt of this letter,

if our understanding is incorrect.

'

Areas examined during this inspection concern a subject matter which is

exempt from disclosure according to Part 73, Title 10, Code of Federal

Regulatic,ns, Section 73.21(c)(2). This information must be handled and L

protected in accordance with the provisions of 10 CFR 73.21. Consequently, i

the enclosure to this letter and our report of this inspection will not be

placed in the NRC Public Document Room.

Encl 03ure Contains T-

$su SAFEGUARDS INFORMATION I l

ps tE03$

co ggggg?gs

poc Upon Separation This

o Page is Decontrolled

m -.n,,,nnn . . . r. n n . s , n i -

en _uunhUO livi veuvir\ l ;UIN

_ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _

,

.

SAxGJADS E01VATON

The Detroit Edison Company- 2 NOV 0 9 Wed

We wil'1 gladly discuss any questions you huve concerning this inspection.

Sincerely,

LLft---

L. Robert Greger, Chief

Emergency Preparedness

and Radiological Protection Branch

Enclosures:

1. Notice of Violation

2. Inspection Report

No. 50-341/88028(DRSS)

(UNCLASSIFIED SAFEGUARDS INFORMATION)

cc w/ enclosures:

Patricia Anthony, Licensing

P. A. Marquardt, Corporate

Legal Department

NRR/DRIS/SGB

NRR/ORIS/S1B

>

NRR/0LPQ/PEB

cc w/ enclosures, w/o

UNCLASSIFIED SAFEGUARDS

INFORMATION:

OCD/DCB(RIDS)

Licensing Fee Managenient Branch

Resident Inspector, RIII

'

Ronald Calle Michigan

Public Service Commission

. Harry H. Voight, Esq.

l Michigan Department of

Public Health

Monroe County Office of

Civil Preparedness

Enclosure Contains

,

SAFEGUARDS INFORMATION

Upon Separation This

, P--+ is Decontrolled

R f,!!, RIII

(.:8 "E er

Pi rtle/.nb d oo 6

w ,< . . ,wher

,

SAEG JAUS U0lV A" 0 \

_