ML20206D215
| ML20206D215 | |
| Person / Time | |
|---|---|
| Site: | Fort Saint Vrain |
| Issue date: | 04/07/1987 |
| From: | Gagliardo J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Robert Williams PUBLIC SERVICE CO. OF COLORADO |
| Shared Package | |
| ML20206D220 | List: |
| References | |
| NUDOCS 8704130273 | |
| Download: ML20206D215 (2) | |
See also: IR 05000267/1987007
Text
._
'
"
APR
7 1987
In Reply Refer To:
Docket:
50-267/87-07
a
Public Service Company of Colorado
ATTN:
Robert O. Williams, Jr.
Vice President, Nuclear Operations
P. O. Box 840
Denver, Colorado
80201-0840
Gentlemen:
This refers to the inspection conducted by Mr. R. E. Baer of this office during
the period March 2-6, 1987, of activities authorized by NRC Operating
License DPR-34 for Fort St. Vrain Nuclear Generating Station, and to the
discussion of our findings with Mr. R. O. Williams, Jr. and other members of
your staff at the conclusion of the inspection.
Areas examined during the inspection included functional areas under the
radiation protection program including:
organization and management controls;
training and qualifications; external occupational exposure control and
personnel dosimetry; internal exposure control and assessment; control of
radioactive materials and contamination, surveys, and monitoring; facilities
and equipment; maintaining occupational exposures ALARA; reportable events; and
i
an allegation. Within these areas, the inspection consisted of selective
examination of procedures and representative records, interviews with
personnel, and observations by the NRC inspector.
The inspection findings are
documented in the enclosed inspection report.
During this inspection, it was found that certain of your activities were in
violation of NRC requirements.
Consequently, you are required to respond to
this violation, in writing, in accordance with the provisions of Section 2.201
of the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal
Regulations.
Your response should be based on specifics contained in the
Notice of Violation enclosed with this letter.
The response directed by this letter and the accompanying Notice is'not subject
,
to the clearance procedures of the Office of Management and Budget as required
,
by the Paperwork Reduction Act of 1980, PL 96-511.
!
1
/
f
[I
g<
.l
,
AC (k
RIV:FRPS
C:FRPS
C:R&SP
C:( P /A
C:RPB
REBaer/tw
BMurray
WLFisher
JPJaudon
JEGagl'a do
MEEmerson
87
.9/.k9/87
3bl}/87
Q/b/7
3 / 9 /87
l1)/87
1;
}\\
s
o
,
i
NB
8704130273 870407
h)
ADOCK 05000267
.
_
_
_ , _ _ . .
_.
_
_
_ _ - _ _ .
.
J
J
,'
. . ,
J
Public Service Company of Colorado
-2-
.
Should you have any questions concerning_this inspection, we will be pleased to
. discuss them with you.
Sincerely,
]
ORIGINAL SIGNED BY;
J. E. Gagliardo, Chief
Reactor Projects Branch
Enclosures:
1.
Appendix A - Notice of Violation
2.
Appendix B - NRC Inspection Report
50-267/87-07
cc w/ enclosures:
Manager, Nuclear Production Division
Fort St. Vrain Nuclear Station
16805 WCR 19\\
Platteville, Colorado
80651
'
P. Tomlinson, Manager, Quality 2
Assurance Division
(same address)
,
Colorado Radiation Control Program Director
Colorado Public Utilities Commission
bcc to DMB (IE06)
bec distrib. by RIV:
<
- RPB
DRSP
- RRI
R. D. Martin,_RA
,
'
- Section Chief (RPB/A)
- RSB
- Section Chief (RSB/ES)
- Project Inspector
- R&SPB
- D. Weiss, RM/ALF
- MIS System
- R. Hall
- RSTS Operator-
- R. E. Baer
- RIV File
- B. Murray
- W. L. Fisher
R. L. Bangart
'
- M. E. Emerson (2)
,
- w/766
!
,
I